Lining structure for delaying tunnel lining cracks
By using geotextile as the stress absorption layer in the tunnel lining structure, dispersing stress and reducing the self-shrinkage of concrete, the problem of difficult delay in tunnel lining cracks is solved, and the stability and service life of the tunnel are significantly improved.
Patent Information
- Application Number
- CN202420659228.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The prior art cannot effectively delay the generation and expansion of tunnel lining cracks, affecting the safe operation and service life of the tunnel.
A lining structure including the base plate steel bar layer, initial support, stress absorption layer and arch wall steel bar layer is adopted. The stress absorption layer is made of geotextile and is laid on the initial support surface by shooting nails to form a stress of 2-10mm thick. Absorbing layer to disperse stress and reduce self-shrinkage of concrete.
Effectively improve the temperature stress and fatigue resistance of tunnel lining, delay crack formation, improve the service life and safety stability of tunnels, and is simple to construct and low cost, and is suitable for various types of tunnel materials.
Smart Images

Figure CN222025792U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tunnel disease treatment, in particular to a lining structure for delaying tunnel lining cracks. Background Art
[0002] Tunnel lining is a permanent support structure built around the tunnel body. It is widely used in modern tunnel engineering. Its main function is to prevent deformation or collapse of surrounding rock. However, due to the influence of various factors such as geological environment, construction progress, material quality, blasting operations and construction technology, cracks are easily generated in tunnel lining. At present, cracks in tunnel lining are generally treated by surface covering method, low-pressure grouting method and slot repair method, but these methods cannot effectively delay the generation and expansion of lining cracks. Over time, it will seriously affect the safe operation of the entire tunnel and also affect the service life of the tunnel.
[0003] Therefore, there is an urgent need for a lining structure that can delay the occurrence of tunnel lining cracks, so as to solve the problem that there is currently no effective way to delay the occurrence of tunnel lining cracks. Utility Model Content
[0004] The purpose of the utility model is to overcome the defects in the prior art and provide a lining structure for delaying the generation of tunnel cracks, so as to solve the problem that there is currently no effective way to delay the generation of tunnel lining cracks.
[0005] In order to achieve the above purpose, the technical solution of the utility model is to provide
[0006] A lining structure for delaying cracks in a tunnel lining, comprising a bottom plate reinforcement layer, an initial support, a stress absorption layer, an arch wall reinforcement layer and a secondary lining layer;
[0007] The bottom plate reinforcement layer is arranged between the bottom of the initial support;
[0008] The stress absorbing layer is fixed on the initial support by means of a fixing member;
[0009] The arch wall reinforcement layer is installed and fixed on the outer wall of the stress absorption layer.
[0010] The secondary lining layer is formed by pouring concrete into the steel reinforcement layer of the arch wall.
[0011] Furthermore, the bottom plate reinforcement layer includes reinforcement bars, a concrete layer and a bottom plate. The reinforcement bars are laid between the bottom of the initial support, and the bottom plate is laid on the reinforcement bars. Concrete is poured between the reinforcement bars and between the reinforcement bars and the bottom plate to form a concrete layer.
[0012] Furthermore, the stress absorbing layer is made of geotextile.
[0013] Furthermore, the thickness of the stress absorption layer is 2-10 mm.
[0014] Furthermore, the thickness of the stress absorption layer is 5 mm.
[0015] Furthermore, the geotextile is laid and hung by nailing.
[0016] Furthermore, the nails are plum blossom shaped nails.
[0017] Furthermore, the overlap width of the geotextile is 30-80 mm.
[0018] Furthermore, the overlap width of the geotextile is 50 mm.
[0019] The advantages and beneficial effects of the utility model are: by using geotextile as stress absorption layer, it can not only effectively improve the ability of tunnel lining to resist temperature stress and concrete self-shrinkage, but also because of the high toughness and wear resistance of geotextile, it has good fatigue resistance, which can delay the formation of cracks in tunnel lining caused by rock stress, and improve the service life and safety stability of the tunnel. At the same time, the construction method is simple to operate, and the geotextile is light, easy to carry and lay; compared with using high-strength materials or increasing the thickness of the lining to enhance the stability of the lining, the cost of using geotextile as a stress absorption layer is lower, and it is suitable for various types of tunnel lining materials, and has a wide range of application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of a lining structure for delaying cracks in a tunnel lining according to the utility model;
[0021] Bottom plate reinforcement layer 1, reinforcement 11, concrete layer 12, bottom plate 13, initial support 2, stress absorption layer 3, arch wall reinforcement layer 4, secondary lining layer 5. DETAILED DESCRIPTION
[0022] The following is a further description of the specific implementation of the present invention in conjunction with the accompanying drawings and embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0023] like Figure 1 As shown, a lining structure for delaying cracks in a tunnel lining comprises a bottom plate reinforcement layer 1, an initial support 2, a stress absorption layer 3, an arch wall reinforcement layer 4 and a secondary lining layer 5;
[0024] The bottom plate reinforcement layer 1 is arranged between the bottom of the initial support 2;
[0025] The stress absorbing layer 3 is fixed on the initial support 2 by a fixing member;
[0026] The arch wall reinforcement layer 4 is installed and fixed on the outer wall of the stress absorption layer 3;
[0027] The secondary lining layer 5 is formed by pouring concrete into the arch wall reinforcement layer 4 .
[0028] As a preferred embodiment of the above technical solution, the bottom plate steel bar layer 1 includes steel bars 11, a concrete layer 12 and a bottom plate 13. The steel bars are laid between the bottom of the initial support, and the bottom plate 13 is laid on the steel bars. Concrete is poured between the steel bars and between the steel bars and the bottom plate to form a concrete layer.
[0029] As a preferred embodiment of the above technical solution, the stress absorbing layer 3 is made of geotextile.
[0030] In the above technical solution, the geotextile is selected to have high toughness, wear resistance, good air permeability and certain elasticity. The elasticity and toughness of the geotextile can disperse stress and effectively delay the generation of cracks; the water permeability of the geotextile helps the water flow inside the lining during concrete curing, reducing the cracks caused by concrete self-shrinkage. The good air permeability of the geotextile can play a role in heat dissipation, avoiding the temperature rise caused by the concrete hydration reaction, resulting in excessive temperature difference between the inside and the outside and generating temperature stress.
[0031] In the above technical methods, before laying the geotextile on the initial support, the surface of the initial support needs to be treated, including: cleaning the dust and gravel on the surface of the initial support, which can be done by first sweeping it roughly with a broom or wire brush, and then using a blower to focus on blowing on the concave and convex parts; the surface flatness of the initial support, the surface of the initial support should be flat, without hollows, cracks, or looseness. For the above situation, use sprayed concrete (or mortar) to level the base surface.
[0032] By cleaning and flattening the initial support surface, the indentations and scratches produced by the stress absorbing layer during service can be reduced, thereby preventing them from affecting the working performance of the stress absorbing layer.
[0033] As a preferred embodiment of the above technical solution, the thickness of the stress absorption layer 3 is 2-10 mm.
[0034] As a preferred embodiment of the above technical solution, the thickness of the stress absorption layer 3 is 5 mm.
[0035] As a preferred embodiment of the above technical solution, the geotextile is laid and hung by nailing.
[0036] As a preferred embodiment of the above technical solution, the nails are plum blossom-shaped nails.
[0037] As a preferred embodiment of the above technical solution, the overlap width of the geotextile is 30-80 mm.
[0038] As a preferred embodiment of the above technical solution, the overlap width of the geotextile is 50 mm.
[0039] As a preferred embodiment of the above technical solution, the nail spacing is 0.8-1.0m on the side walls and 0.5-0.8cm on the top.
[0040] In the above technical solution, the stress absorption layer is laid, and a 5mm thick geotextile is used as the stress absorption layer. It is first wetted with water before laying, and the geotextile is hung from the top of the arch. The geotextile is fixed on the initial support surface along the arch wall by nailing in a plum blossom shape. The overlap width of the geotextile is 50mm, the nail spacing is 0.8-1m on the side wall, and 0.5-0.8cm on the top. The hanging range is to cover the side and top arches. When hanging the geotextile, attention should be paid to the appropriate tightness so that it can be fully combined with the initial support surface and close to the surface of the shotcrete, avoiding indentations, scratches or tearing of the geotextile due to over-tightening, and avoiding over-looseness that affects the pouring of concrete.
[0041] For the steel bar layer of the arch wall, first tie the outer ring-shaped positioning steel bars according to the measurement control points, connect the positioning steel bars with longitudinal bars, and use the longitudinal bars as the basis for the other ring-shaped bars. After the outer layer is tied, the inner layer of steel bars are tied in the same way, and the inner and outer layers of steel bars are connected with stirrups in time, and spot-welded by arc welding to strengthen the overall rigidity. Pay attention to the damage to the geotextile during the construction process when tying and welding steel bars.
[0042] The lining structure for delaying the occurrence of cracks in the tunnel provided by the utility model can greatly improve the overall structural stability between the primary support and the surrounding rock of the tunnel by laying geotextile as a stress absorption layer, improve its ability to bear the surrounding rock load, reduce the impact on the secondary lining concrete, and the laid geotextile can reduce the restraining effect of the primary support on its self-shrinkage after the secondary lining concrete is poured, significantly delaying the occurrence of concrete cracking. It has been proved through experiments and actual applications that the geotextile can significantly delay the occurrence of cracks in the tunnel lining.
[0043] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A lining structure for delaying cracks in tunnel linings, It is characterized in that It comprises a bottom plate reinforcement layer (1), an initial support (2), a stress absorption layer (3), an arch wall reinforcement layer (4) and a secondary lining layer (5); The bottom plate steel reinforcement layer (1) is arranged between the bottom of the initial support (2); The stress absorbing layer (3) is fixed on the initial support (2) via a fixing member; The arch wall steel bar layer (4) is installed and fixed on the outer wall of the stress absorption layer (3); The secondary lining layer (5) is formed by pouring concrete into the arch wall reinforcement layer (4).
2. A lining structure for delaying cracks in a tunnel lining according to claim 1, It is characterized in that The bottom plate reinforcement layer (1) comprises reinforcement bars (11), a concrete layer (12) and a bottom plate (13); the reinforcement bars are laid between the bottom of the initial support, the bottom plate (13) is laid on the reinforcement bars, and concrete is poured between the reinforcement bars (11) and between the reinforcement bars (11) and the bottom plate (13) to form a concrete layer (12).
3. A lining structure for delaying cracks in tunnel lining according to claim 1, It is characterized in that The stress absorbing layer (3) is made of geotextile.
4. A lining structure for delaying cracks in tunnel lining according to claim 3, It is characterized in that The thickness of the stress absorption layer (3) is 2-10 mm.
5. A lining structure for delaying cracks in tunnel lining according to claim 4, It is characterized in that The thickness of the stress absorption layer (3) is 5 mm.
6. A lining structure for delaying cracks in tunnel lining according to claim 3, It is characterized in that The geotextile is laid and hung by nailing.
7. A lining structure for delaying cracks in tunnel lining according to claim 6, It is characterized in that The nails are plum blossom shaped nails.
8. A lining structure for delaying cracks in tunnel lining according to claim 3, It is characterized in that The overlapping width of the geotextile is 30-80 mm.
9. A lining structure for delaying cracks in tunnel lining according to claim 8, It is characterized in that The geotextile has an overlap width of 50 mm.
