Arched bridge formwork construction lifting platform

By designing movable installation platform and extension platform components, the limited movement range caused by the fixed area of ​​the arch bridge formwork construction is solved, and construction efficiency and safety are improved.

CN222043933UActive Publication Date: 2024-11-22MUNICIPAL ENG CO LTD OF CHINA RAILWAY 12TH BUREAU GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420671242.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-03
Publication Date
2024-11-22
Estimated Expiration
2034-04-03

AI Technical Summary

Technical Problem

The area of ​​the existing arch bridge formwork construction lifting platform is fixed, resulting in limited movement of staff, inconvenient movement, and affecting construction efficiency.

Method used

A lifting platform including installation platform, intermediate mezzanine table, working platform, cylinder, extension platform, fixing plate, ladder, vertical plate, protective rod and other components is designed. The fixed block and extension platform are pushed to the left by the cylinder to move the fixed block and extension platform to the left to expand the operation. The platform is mobile and secured by ladders and protective poles.

Benefits of technology

It realizes that the mobile space of the working platform is expanded without moving the entire device, improves the operational convenience and safety of staff, and reduces the construction complexity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043933U_ABST
    Figure CN222043933U_ABST
Patent Text Reader

Abstract

The utility model discloses an arch bridge formwork construction lifting platform, which relates to the technical field of bridge construction and comprises a mounting platform, a middle interlayer platform is welded at the upper end of the mounting platform, a working platform is welded at the upper end of the middle interlayer platform, and a ladder stand is arranged on the right sides of the mounting platform, the middle interlayer platform and the working platform. And two air cylinders are arranged on the inner side of the mounting platform. The two air cylinders are started at the same time to push the fixing block to move leftwards, the fixing plate drives the extending table to move out leftwards, the movable space on the left side of the working platform is enlarged, workers can work at the position conveniently, operation is convenient and fast, control movement of a movable support on the lower portion is avoided, and when the extending table extends leftwards, the working efficiency is improved. And the second vertical plate drives the protection rod to leftwards penetrate out of the hollow protection pipe, the upper area is blocked through cooperation with the hollow protection pipe, the handrail, the breast board and the elastic protection belt, the operation safety of workers is guaranteed, and safety and reliability are higher.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridge construction, in particular to an arch bridge template construction lifting platform. Background Art

[0002] Arch bridge is a common type of architectural bridge. It has beautiful shape, round curves and dynamic beauty. It has been widely used. Compared with steel bridges and reinforced concrete beam bridges, arch bridges can save a lot of steel and cement, have low cost, and its components are mainly under compression and not under tension, so they can exert their maximum mechanical properties.

[0003] During the construction of the arch bridge, construction formwork is needed, and the overlap of the construction formwork requires the attachment of a lifting elevator and a matching lifting platform. The device is mainly composed of a movable bracket at the bottom, a scissor-type lifting mechanism installed on the bracket, and an operating lifting platform installed on the top of the scissor-type lifting mechanism. The workers stand on the operating lifting platform to install and weld the formwork.

[0004] Nowadays, the area of ​​construction lifting platforms is relatively fixed, with an area of ​​a specific size that does not change. As a result, when the entire device is stable, the workers' range of movement is relatively limited. When there is a location point near the lifting platform that needs to be worked on, the entire device can only be moved through the movable bracket at the bottom to reach the location point. The adjustment is more troublesome, which brings inconvenience to the workers' construction operations and low work efficiency. Utility Model Content

[0005] The utility model aims to provide a lifting platform for arch bridge formwork construction to solve the problems raised in the above-mentioned background technology.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an arch bridge formwork construction lifting platform, including an installation platform, an intermediate interlayer platform is welded to the upper end of the installation platform, a working platform is welded to the upper end of the intermediate interlayer platform, ladders are arranged on the right side of the installation platform, two cylinders are arranged on the inner side of the installation platform, an extension platform is arranged on the inner side of the intermediate interlayer platform, a fixed plate is fixedly installed on the right end of the extension platform, a vertical plate 1 is fixedly installed at the four corners of the upper end of the working platform, and a vertical plate 2 is fixedly installed on the front and rear sides of the upper end of the fixed plate.

[0007] Preferably, two grooves 1 are opened on the left side of the upper end of the installation platform, and the two cylinders are fixedly installed in the two grooves 1 respectively, and the movable ends of the two cylinders both pass through the grooves 1 and are fixedly installed with fixed blocks.

[0008] Preferably, the upper ends of the two fixing blocks are fixedly mounted on the bottom of the fixing plate, and a reinforcing connecting rod is fixedly connected between the two fixing blocks.

[0009] Preferably, a second groove is provided at the upper end of the middle sandwich platform, the extension platform is slidably arranged in the second groove, a third groove is provided at the lower side of the second groove, and a sliding plate is slidably arranged in the third groove.

[0010] Preferably, two smooth rods are fixedly installed in the groove three, the sliding plate is movably sleeved on the outside of the two smooth rods, and the sliding plate is fixedly installed on the right side of the bottom of the extension platform.

[0011] Preferably, two hollow protective tubes are fixedly installed between the left and right vertical plates on the working platform, and a protective rod is movably arranged in each of the hollow protective tubes. Corresponding through holes are opened on the left vertical plate one, and each of the protective rods passes through the corresponding through holes and is fixedly installed on the vertical plate two.

[0012] Preferably, two railings are fixedly installed between the two upright boards 2, a railing is fixedly connected to the upper side between the two upright boards 1 on the right side, and an elastic protective belt is fixedly connected to the lower side between the two upright boards 1 on the right side.

[0013] Preferably, three welding blocks are fixedly installed on the left end of the ladder, and the three welding blocks are respectively fixedly welded on the installation platform, the middle interlayer platform and the working platform.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. The utility model is provided with an installation platform, an intermediate interlayer platform, a working platform, a cylinder, an extension platform, a fixed plate, a fixed block, a reinforced connecting rod, a smooth rod, and a sliding plate. When a working position that cannot be reached by the staff appears near the side of the working platform, two cylinders can be started at the same time to push the fixed block to move to the left, and the fixed plate drives the extension platform to move out to the left, thereby expanding the movable space on the left side of the working platform, making it convenient for the staff to work at that point, and the operation is more convenient, avoiding the control movement of the lower movable bracket;

[0016] 2. The utility model is equipped with a ladder, a vertical plate one, a vertical plate two, a welding block, a hollow protective tube, a protective rod, a handrail, a guardrail, an elastic protective belt, etc. When the extension platform extends to the left, the vertical plate two drives the protective rod to pass through the hollow protective tube to the left, and cooperates with the hollow protective tube, the handrail, the guardrail and the elastic protective belt to block the upper area, thereby ensuring the working safety of the staff, which is safer and more reliable. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the overall explosion structure of the utility model;

[0019] Figure 3 It is a three-dimensional structural schematic diagram of the installation platform of the utility model;

[0020] Figure 4 It is a three-dimensional structural schematic diagram of the intermediate sandwich platform of the utility model;

[0021] Figure 5 It is a three-dimensional structural schematic diagram of the extension platform of the utility model;

[0022] Figure 6 It is a three-dimensional structural schematic diagram of the working platform of the utility model;

[0023] Figure 7 It is a three-dimensional structural schematic diagram of the ladder of the utility model.

[0024] Figure 8 For this utility model Figure 6 Enlarged structural diagram at A in the middle.

[0025] In the figure: 1. Installation platform; 2. Intermediate mezzanine platform; 3. Working platform; 4. Ladder; 5. Cylinder; 6. Extension platform; 7. Fixed plate; 8. Vertical plate one; 9. Vertical plate two; 10. Groove one; 11. Groove two; 12. Welding block; 13. Fixed block; 14. Strengthening connecting rod; 15. Groove three; 16. Smooth rod; 17. Sliding plate; 18. Hollow protective tube; 19. Protective rod; 20. Perforation; 21. Railing; 22. Guardrail; 23. Elastic protective belt. DETAILED DESCRIPTION

[0026] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0027] Embodiment 1:

[0028] See also Figure 1 and Figure 2The figure shows an arch bridge formwork construction lifting platform, which includes an installation platform 1, an intermediate interlayer platform 2 is welded to the upper end of the installation platform 1, a working platform 3 is welded to the upper end of the intermediate interlayer platform 2, a ladder 4 is arranged on the right side of the installation platform 1, the intermediate interlayer platform 2 and the working platform 3, two cylinders 5 are arranged on the inner side of the installation platform 1, an extension platform 6 is arranged on the inner side of the intermediate interlayer platform 2, a fixed plate 7 is fixedly installed on the right end of the extension platform 6, a vertical plate 8 is fixedly installed at the four corners of the upper end of the working platform 3, and a vertical plate 2 9 is fixedly installed on the front and rear sides of the upper end of the fixed plate 7.

[0029] See also Figure 3 Two grooves 10 are provided on the left side of the upper end of the mounting platform 1, and the two cylinders 5 are fixedly installed in the two grooves 10 respectively. The movable ends of the two cylinders 5 pass through the grooves 10 and are fixedly installed with fixing blocks 13.

[0030] In this embodiment, two cylinders 5 are started simultaneously to push the fixed block 13 to move to the left.

[0031] See also Figure 1 and Figure 3 The upper ends of the two fixing blocks 13 are fixedly mounted on the bottom of the fixing plate 7 , and a reinforcing connecting rod 14 is fixedly connected between the two fixing blocks 13 .

[0032] In this embodiment, when the two cylinders 5 push the two fixed blocks 13 to move to the left, the fixed plate 7 is pushed to move to the left away from the middle interlayer platform 2 , and the strengthening connecting rod 14 can strengthen the fixed connection between the two fixed blocks 13 .

[0033] See also Figure 4 A second groove 11 is provided at the upper end of the middle interlayer platform 2, and the extension platform 6 is slidably arranged in the second groove 11. A third groove 15 is provided at the lower side of the second groove 11, and a sliding plate 17 is slidably arranged in the third groove 15.

[0034] In this embodiment, the extension platform 6 can slide to the left in the groove 2 11 in the middle interlayer platform 2. When the fixed plate 7 drives the extension platform 6 to slide out of the groove 2 11 to the left, the area of ​​the extension platform 6 exposed to the outside is increased, thereby expanding the movable space of the staff and facilitating the operation. The sliding plate 17 slides to the left in the groove 3 15 synchronously.

[0035] See also Figure 4 Two smooth rods 16 are fixedly installed in the groove 3 15 , and the sliding plate 17 is movably sleeved on the outside of the two smooth rods 16 , and the sliding plate 17 is fixedly installed on the right side of the bottom of the extension platform 6 .

[0036] In this embodiment, when the sliding plate 17 slides to the left in the groove 3 15 synchronously, it is bounded on the outside of the two smooth rods 16, thereby enhancing the stability of the extension platform 6 sliding to the left, strengthening the supporting structure, and preventing the extension platform 6 from breaking.

[0037] Working principle: When the working platform 3 is pushed to a certain height by the scissor-type lifting mechanism on the movable bracket, and a working position that the staff cannot reach appears near the side, the two cylinders 5 can be started at the same time to push the fixed block 13 to move to the left, and the fixed plate 7 drives the extension platform 6 to move out to the left, thereby expanding the movable space on the left side of the working platform 3, making it convenient for the staff to work at that point. At the same time, the vertical plate 2 9 drives the protective rod 19 to pass through the hollow protective tube 18 to the left, and cooperates with the hollow protective tube 18, the railing 21, the railing 22 and the elastic protective belt 23 to block the upper area to ensure the working safety of the staff.

[0038] Installation platform 1, intermediate mezzanine platform 2, working platform 3, ladder 4, cylinder 5, extension platform 6, fixed plate 7, vertical plate 1 8, vertical plate 2 9, groove 1 10, groove 2 11, welding block 12, fixed block 13, strengthening connecting rod 14, groove 3 15, smooth rod 16, sliding plate 17, hollow protective tube 18, protective rod 19, perforation 20, railing 21, railing 22, elastic protective belt 23

[0039] Embodiment 2:

[0040] See also Figure 1-8 Two hollow protective tubes 18 are fixedly installed between the left and right vertical plates 8 on the working platform 3, and a protective rod 19 is movably arranged in each hollow protective tube 18. Corresponding through holes 20 are opened on the left vertical plate 8, and each protective rod 19 passes through the corresponding through holes 20 and is fixedly installed on the vertical plate 9.

[0041] In this embodiment, when the fixed plate 7 moves to the left, the second vertical plate 9 drives the protection rod 19 to move to the left in the hollow protection tube 18, so as to always maintain the protection measures for the front and rear areas of the working platform 3 to prevent the workers from falling down.

[0042] See also Figure 1-8 Two railings 21 are fixedly installed between the two vertical plates 29, a guardrail 22 is fixedly connected to the upper side between the two vertical plates 1 8 on the right side, and an elastic protective belt 23 is fixedly connected to the lower side between the two vertical plates 1 8 on the right side.

[0043] In this embodiment: the railing 21, the guardrail 22 and the elastic protection belt 23 cooperate to protect the left and right sides of the working platform 3 to protect the workers. At the same time, the elastic protection belt 23 has tension, which makes it convenient for the workers to climb up from the ladder 4 on the right and get into the working platform 3.

[0044] See also Figure 1-8Three welding blocks 12 are fixedly installed on the left end of the ladder 4, and the three welding blocks 12 are fixedly welded on the installation platform 1, the middle interlayer platform 2 and the working platform 3 respectively.

[0045] In this embodiment, three welding blocks 12 weld the ladder 4 to the installation platform 1, the intermediate interlayer platform 2 and the working platform 3 more firmly, which is safer and convenient for workers to climb up and down.

[0046] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include"-"comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process-method-article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process-method-article or device.

[0047] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An arch bridge formwork construction lifting platform, comprising a mounting platform (1), characterized in that: An intermediate interlayer platform (2) is welded to the upper end of the installation platform (1), and an operating platform (3) is welded to the upper end of the intermediate interlayer platform (2). A ladder (4) is arranged on the right side of the installation platform (1), the intermediate interlayer platform (2) and the operating platform (3). Two cylinders (5) are arranged on the inner side of the installation platform (1), and an extension platform (6) is arranged on the inner side of the intermediate interlayer platform (2). A fixing plate (7) is fixedly installed on the right end of the extension platform (6). A vertical plate 1 (8) is fixedly installed at the four corners of the upper end of the operating platform (3), and a vertical plate 2 (9) is fixedly installed on the front and rear sides of the upper end of the fixing plate (7).

2. The arch bridge formwork construction lifting platform according to claim 1 is characterized by: Two grooves (10) are provided on the left side of the upper end of the installation platform (1), and the two cylinders (5) are fixedly installed in the two grooves (10) respectively. The movable ends of the two cylinders (5) both pass through the grooves (10) and are fixedly installed with fixing blocks (13).

3. The arch bridge formwork construction lifting platform according to claim 2 is characterized by: The upper ends of the two fixing blocks (13) are fixedly mounted on the bottom of the fixing plate (7), and a reinforcing connecting rod (14) is fixedly connected between the two fixing blocks (13).

4. The arch bridge formwork construction lifting platform according to claim 1 is characterized by: A second groove (11) is provided at the upper end of the intermediate sandwich platform (2), the extension platform (6) is slidably arranged in the second groove (11), a third groove (15) is provided at the lower side of the second groove (11), and a sliding plate (17) is slidably arranged in the third groove (15).

5. The arch bridge formwork construction lifting platform according to claim 4 is characterized by: Two smooth rods (16) are fixedly installed in the groove three (15), the sliding plate (17) is movably sleeved on the outside of the two smooth rods (16), and the sliding plate (17) is fixedly installed on the right side of the bottom of the extension platform (6).

6. The arch bridge formwork construction lifting platform according to claim 1 is characterized by: Two hollow protective tubes (18) are fixedly installed between the left and right vertical plates (8) on the working platform (3), and a protective rod (19) is movably arranged in each of the hollow protective tubes (18). A corresponding through hole (20) is opened on the left vertical plate (8), and each of the protective rods (19) passes through the corresponding through hole (20) and is fixedly installed on the vertical plate (9).

7. The arch bridge formwork construction lifting platform according to claim 1 is characterized by: Two railings (21) are fixedly installed between the two upright plates (9), a guardrail (22) is fixedly connected to the upper side between the two upright plates (8) on the right side, and an elastic protective belt (23) is fixedly connected to the lower side between the two upright plates (8) on the right side.

8. The arch bridge formwork construction lifting platform according to claim 1 is characterized by: Three welding blocks (12) are fixedly mounted on the left end of the ladder (4), and the three welding blocks (12) are respectively fixedly welded on the installation platform (1), the middle interlayer platform (2) and the working platform (3).