Flue plate structure for tunnel

By employing corbel support and prefabricated protrusion design in the flue plate structure, combined with ventilation components, the stress concentration problem caused by the small contact area of ​​the flue plate is solved, thus achieving the stability and durability of the flue plate.

CN222045789UActive Publication Date: 2024-11-22CCCC FIRST HARBOR ENGINEERING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420850545.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-11-22
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

In the prior art, the contact area of ​​the flue plate is small under the action of gravity, which leads to large stress at the contact points between the first and second flue plates and the connecting parts, making them prone to damage.

Method used

The design employs corbel support, with prefabricated protrusions in the first, second, and third flue plates to increase the contact area. These plates are connected by ventilation components such as frames, mesh panels, and expansion bolts to form a smoke exhaust channel and reduce stress.

Benefits of technology

By increasing the contact area, the stress on the flue plate is reduced, preventing damage to the flue plate and improving the stability and service life of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045789U_ABST
    Figure CN222045789U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of tunnels, and discloses a flue plate structure for a tunnel, which is applied to a shield tunnel and comprises a bracket, a first flue plate, a second flue plate, a third flue plate and a ventilation assembly. In the laying process of the flue plates, firstly, the multiple first flue plates are evenly erected on brackets on the two sides in the length direction of the shield tunnel. And then through the first bulges and the second bulges, the second flue plates can be respectively erected between the two adjacent first flue plates and the bracket on one side. And finally, through the first protrusions and the protrusions, the third flue plates can be erected between the two adjacent first flue plates and the bracket on the other side. And the design of the first bulge, the second bulge and the third bulge is adopted, so that the contact area between the first flue plate and the second flue plate and the contact area between the first flue plate and the third flue plate are increased. Therefore, the stress at the contact part is reduced, and the first flue plate, the second flue plate and the third flue plate are prevented from being damaged.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of tunnel technology, for example, to a flue plate structure for a tunnel. Background Art

[0002] At present, the flue plate structure is usually formed by laying multiple solid reinforced concrete flue plates. The related art (publication number: CN218912899U) discloses a flue plate structure for a shield tunnel, which is installed on the top of the shield tunnel and includes multiple flue plates laid along the length direction of the shield tunnel. The flue plates are prestressed concrete hollow plates. The flue plates include a first flue plate, a second flue plate and a third flue plate. A plurality of first flue plates are arranged in sequence along the length direction of the shield tunnel to form a first flue plate group, and the plurality of first flue plate groups are arranged at intervals along the length direction of the shield tunnel; two second flue plates are respectively arranged between each two adjacent first flue plate groups, and the arrangement direction of the two second flue plates is perpendicular to the length direction of the shield tunnel, and a flue opening for installing a smoke exhaust valve is enclosed between the two second flue plates and the two adjacent first flue plate groups; a reinforcement layer is attached to one side surface of the third flue plate, and a mounting plate for hanging a fan is pre-embedded on the other side surface, and at least two third flue plates are respectively arranged at both ends of the arrangement direction of the plurality of first flue plate groups.

[0003] In the process of implementing the above embodiments, it is found that there are at least the following problems in the related art:

[0004] It uses prestressed concrete hollow slabs as flue plates, which not only ensures the overall bearing strength of the flue plates, but also reduces the mass of the flue plates. Therefore, the difficulty of transportation and construction is greatly reduced, and the construction efficiency is guaranteed. However, after the second flue plate is erected on the first flue plate through the connecting piece, under the action of gravity, since the contact area between the first flue plate and the second flue plate and the connecting piece is small, the contact points between the first flue plate and the second flue plate and the connecting piece will generate large stress, which can easily cause damage to the first flue plate and the second flue plate.

[0005] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present application, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Utility Model Content

[0006] In order to provide a basic understanding of some aspects of the disclosed embodiments, a brief summary is given below. The summary is not an extensive review, nor is it intended to identify key / critical components or delineate the scope of protection of these embodiments, but rather serves as a prelude to the detailed description that follows.

[0007] The disclosed embodiment provides a flue plate structure for a tunnel to prevent the flue plate from being damaged.

[0008] In some embodiments, the flue plate structure for a tunnel is applied to a shield tunnel, comprising: a corbel, cast in the shield tunnel along the length direction of the shield tunnel, and located on both sides of the shield tunnel along the width direction of the shield tunnel; a first flue plate, erected on the corbels on both sides, evenly distributed along the length direction of the shield tunnel, each of the first flue plates including a first protrusion prefabricated on its edge; a second flue plate, respectively erected between two adjacent first flue plates and the corbels on one side, each of the second flue plates including a first protrusion prefabricated on the edge of the first flue plate; A second protrusion prefabricated on its edge; a third flue plate, respectively mounted between two adjacent first flue plates and the corbel on the other side thereof, a plurality of the third flue plates and a plurality of the second flue plates are symmetrically distributed one by one, and each of the third flue plates includes a third protrusion prefabricated on its edge; a ventilation component, respectively installed between the symmetrically distributed second flue plates and the third flue plates for ventilation; wherein the shape and size of the first protrusion match the shape and size of the second protrusion and the third protrusion, and the second protrusion and the third protrusion are both mounted on the first protrusion.

[0009] Optionally, the ventilation assembly includes: frames, respectively installed between the symmetrically distributed second flue plates and the third flue plates; mesh plates, respectively and movably installed on each of the frames, both used for ventilation; wherein, along the height direction of the shield tunnel, the plurality of mesh plates are located above the plurality of frames.

[0010] Optionally, the ventilation group further includes: expansion bolts, which are respectively passed through each of the frames and respectively installed on the second flue plate and the third flue plate which are symmetrically distributed.

[0011] Optionally, the ventilation group further includes: a butterfly hinge, which is respectively installed between each of the frames and the corresponding mesh plate.

[0012] Optionally, the ventilation group further includes: a handle, respectively installed on each of the mesh plates, and each for holding; wherein the plurality of handles are respectively adjacent to the plurality of hinges.

[0013] Optionally, it also includes: a threaded barrel, respectively located between the shield tunnel and each of the second flue plates and each of the third flue plates; a threaded rod, respectively threadedly connected to both ends of each of the threaded barrels; a chain, respectively connected to multiple threaded rods at both ends, wherein multiple chains at one end are respectively connected to the second flue and the third flue plates, wherein multiple chains at the other end are all connected to the shield tunnel.

[0014] Optionally, it also includes: joint bearings, which are respectively installed between the connected threaded rods and the chains.

[0015] Optionally, it also includes: a first base, which is respectively installed at the connection between each of the chains and the second flue plate and the third flue plate.

[0016] Optionally, it also includes: a second base, which is respectively installed at the connection between the shield tunnel and the plurality of chains.

[0017] The flue plate structure for a tunnel provided by the embodiment of the present disclosure can achieve the following technical effects:

[0018] A flue plate structure for a tunnel provided by an embodiment of the present disclosure is applied to a shield tunnel, and includes a corbel, a first flue plate, a second flue plate, a third flue plate, and a ventilation assembly. The corbel is cast in the shield tunnel along the length direction of the shield tunnel, and is located on both sides of the shield tunnel along the width direction of the shield tunnel. The corbels on both sides are used to support and install the first flue plate, the second flue plate, and the third flue plate. The first flue plate is evenly erected on the corbels on both sides along the length direction of the shield tunnel, the second flue plate is respectively erected between two adjacent first flue plates and one of the corbels on one side, and the third flue plate is respectively erected between two adjacent first flue plates and one of the corbels on the other side, and multiple first flue plates, second flues, and third flue plates together form a smoke exhaust channel. Multiple third flue plates and multiple second flue plates are symmetrically distributed one by one, and a flue port is formed between the symmetrically distributed second flue plates and the third flue plates. The ventilation assembly is respectively installed at the flue port between the symmetrically distributed second flue plates and the third flue plates for ventilation. Each first flue plate includes a first protrusion prefabricated on its edge, each second flue plate includes a second protrusion prefabricated on its edge, and each third flue plate includes a third protrusion prefabricated on its edge. The first protrusion, the second protrusion, and the third protrusion are all used for limiting. The shape and size of the first protrusion match the shape and size of the second protrusion and the third protrusion, so that the second protrusion and the third protrusion can be mounted on the first protrusion.

[0019] During the laying process of the flue plate, firstly, multiple first flue plates are evenly laid on the brackets on both sides along the length direction of the shield tunnel. Then, the second flue plate can be laid between two adjacent first flue plates and one of the brackets on one side through the first protrusion and the second protrusion. Finally, the third flue plate can be laid between two adjacent first flue plates and one of the brackets on the other side through the first protrusion and the protrusion. Finally, multiple first flue plates, second flue plates and third flue plates together form a smoke exhaust channel. Moreover, the design of the first protrusion, the second protrusion and the third protrusion increases the contact area between the first flue plate and the second flue plate and the third flue plate. Therefore, the stress at the contact point is reduced, thereby avoiding damage to the first flue plate, the second flue plate and the third flue plate.

[0020] The above general description and the following description are exemplary and explanatory only and are not intended to limit the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] One or more embodiments are exemplarily described by corresponding drawings, which do not limit the embodiments. Elements with the same reference numerals in the drawings are shown as similar elements, and the drawings do not constitute a scale limitation, and wherein:

[0022] Figure 1 is a schematic cross-sectional structural diagram of a flue plate structure for a tunnel provided by an embodiment of the present disclosure;

[0023] Figure 2 yes Figure 1 Schematic diagram of the structure viewed from the center AA;

[0024] Figure 3 yes Figure 1 Schematic diagram of the cross-sectional structure at the middle BB;

[0025] Figure 4 yes Figure 1 Schematic diagram of the enlarged structure at point C in the middle.

[0026] Reference numerals:

[0027] 1: shield tunnel; 2: corbel; 3: first flue plate; 4: second flue plate; 5: third flue plate; 6: frame; 7: mesh plate; 8: expansion bolt; 9: butterfly hinge; 10: handle; 11: threaded cylinder; 12: threaded rod; 13: chain; 14: spherical bearing; 15: first base; 16: second base. DETAILED DESCRIPTION

[0028] In order to be able to understand the features and technical contents of the embodiments of the present disclosure in more detail, the implementation of the embodiments of the present disclosure is described in detail below in conjunction with the accompanying drawings. The attached drawings are for reference only and are not used to limit the embodiments of the present disclosure. In the following technical description, for the convenience of explanation, a full understanding of the disclosed embodiments is provided through multiple details. However, one or more embodiments can still be implemented without these details. In other cases, to simplify the drawings, well-known structures and devices can be simplified for display.

[0029] The terms "first", "second", etc. in the specification and claims of the embodiments of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so that the embodiments of the embodiments of the present disclosure described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0030] In the embodiments of the present disclosure, the terms "upper", "lower", "inside", "middle", "outside", "front", "back" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. These terms are mainly intended to better describe the embodiments of the present disclosure and their embodiments, and are not intended to limit the indicated devices, elements or components to have a specific direction, or to be constructed and operated in a specific direction. Moreover, in addition to being used to indicate directions or positional relationships, some of the above terms may also be used to indicate other meanings. For example, the term "upper" may also be used to indicate a certain dependency or connection relationship in certain circumstances. For those of ordinary skill in the art, the specific meanings of these terms in the embodiments of the present disclosure can be understood according to specific circumstances.

[0031] In addition, the terms "disposed", "connected", and "fixed" should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present disclosure can be understood according to specific circumstances.

[0032] Unless otherwise stated, the term "plurality" means two or more.

[0033] In the embodiment of the present disclosure, the character " / " indicates that the preceding and following objects are in an "or" relationship. For example, A / B indicates: A or B.

[0034] The term "and / or" is a description of the association relationship between objects, indicating that three relationships can exist. For example, A and / or B means: A or B, or, A and B.

[0035] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present disclosure may be combined with each other.

[0036] Combination Figures 1 to 4As shown, the embodiment of the present disclosure provides a flue plate structure for a tunnel, which is applied to a shield tunnel 1, and includes a corbel 2, a first flue plate 3, a second flue plate 4, a third flue plate 5 and a ventilation assembly. The corbel 2 is cast in the shield tunnel 1 along the length direction of the shield tunnel 1, and is located on both sides of the shield tunnel 1 along the width direction of the shield tunnel 1. The first flue plate 3 is erected on the corbels 2 on both sides, evenly distributed along the length direction of the shield tunnel 1, and each first flue plate 3 includes a first protrusion prefabricated on its edge. The second flue plate 4 is respectively erected between two adjacent first flue plates 3 and one of the corbels 2, and each second flue plate 4 includes a second protrusion prefabricated on its edge. The third flue plate 5 is respectively erected between two adjacent first flue plates 3 and the other of the corbels 2, and multiple third flue plates 5 and multiple second flue plates 4 are symmetrically distributed one by one, and each third flue plate 5 includes a third protrusion prefabricated on its edge. The ventilation components are respectively installed between the symmetrically distributed second flue plate 4 and the third flue plate 5 for ventilation. The shape and size of the first protrusion match the shape and size of the second protrusion and the third protrusion, and the second protrusion and the third protrusion are both mounted on the first protrusion.

[0037] A flue plate structure for a tunnel provided in an embodiment of the present disclosure is applied to a shield tunnel 1, and includes a corbel 2, a first flue plate 3, a second flue plate 4, a third flue plate 5, and a ventilation assembly. The corbel 2 is cast in the shield tunnel 1 along the length direction of the shield tunnel 1, and is located on both sides of the shield tunnel 1 along the width direction of the shield tunnel 1. The corbels 2 on both sides are used to support and install the first flue plate 3, the second flue plate 4, and the third flue plate 5. The first flue plate 3 is evenly erected on the corbels 2 on both sides along the length direction of the shield tunnel 1, the second flue plate 4 is respectively erected between two adjacent first flue plates 3 and one of the corbels 2 on one side, and the third flue plate 5 is respectively erected between two adjacent first flue plates 3 and one of the corbels 2 on the other side, and multiple first flue plates 3, second flues, and third flue plates 5 together form a smoke exhaust channel. Multiple third flue plates 5 and multiple second flue plates 4 are symmetrically distributed one by one, and a flue opening is formed between the symmetrically distributed second flue plates 4 and third flue plates 5. The ventilation components are respectively installed at the flue opening between the symmetrically distributed second flue plate 4 and the third flue plate 5 for ventilation. Each first flue plate 3 includes a first protrusion prefabricated on its edge, each second flue plate 4 includes a second protrusion prefabricated on its edge, and each third flue plate 5 includes a third protrusion prefabricated on its edge. The first protrusion, the second protrusion and the third protrusion are all used for limiting. The shape and size of the first protrusion match the shape and size of the second protrusion and the third protrusion, so that the second protrusion and the third protrusion can be mounted on the first protrusion.

[0038] During the laying process of the flue plate, firstly, a plurality of first flue plates 3 are evenly laid on the two side brackets 2 along the length direction of the shield tunnel 1. Then, through the first protrusion and the second protrusion, the second flue plate 4 can be respectively laid between the two adjacent first flue plates 3 and the one side bracket 2. Finally, through the first protrusion and the protrusion, the third flue plate 5 can be respectively laid between the two adjacent first flue plates 3 and the other side bracket 2. Finally, a plurality of first flue plates 3, second flues and third flue plates 5 together form a smoke exhaust channel. Moreover, the design of the first protrusion, the second protrusion and the third protrusion increases the contact area between the first flue plate 3 and the second flue plate 4 and the third flue plate 5. Therefore, the stress at the contact point is reduced, thereby avoiding damage to the first flue plate 3, the second flue plate 4 and the third flue plate 5.

[0039] Optionally, combined Figures 1 to 3 As shown, the ventilation assembly includes a frame 6 and a mesh plate 7. The frames 6 are respectively installed between the symmetrically distributed second flue plate 4 and the third flue plate 5. The mesh plates 7 are respectively movably installed on each frame 6 and are used for ventilation. In the height direction of the shield tunnel 1, multiple mesh plates 7 are located above multiple frames 6.

[0040] In the disclosed embodiment, the ventilation assembly includes a frame 6 and a mesh plate 7. The frames 6 are respectively installed between the symmetrically distributed second flue plate 4 and the third flue plate 5, and are respectively used to support and install movable mesh plates 7. The mesh plates 7 are respectively and movably installed on each frame 6, and are used for ventilation and blocking debris entering the smoke exhaust channel. In addition, the design that multiple mesh plates 7 are located above multiple frames 6 can facilitate pushing the mesh plates 7 from the outside of the smoke exhaust channel.

[0041] Optionally, combined Figure 1 and Figure 2 As shown, the ventilation group further includes expansion bolts 8. The expansion bolts 8 are respectively passed through each frame 6 and are respectively installed on the second flue plate 4 and the third flue plate 5 which are symmetrically distributed.

[0042] In the disclosed embodiment, the ventilation group further includes expansion bolts 8 respectively penetrated through each frame 6. The expansion bolts 8 are respectively installed on the symmetrically distributed second flue plate 4 and the third flue plate 5 to fix the frame 6 between the symmetrically distributed second flue plate 4 and the third flue plate 5.

[0043] Optionally, combined Figures 1 to 3 As shown, the ventilation group further includes a butterfly hinge 9. The butterfly hinge 9 is installed between each frame 6 and the corresponding mesh plate 7 respectively.

[0044] In the disclosed embodiment, the ventilation group further comprises a butterfly hinge 9 respectively installed between each frame 6 and the corresponding mesh plate 7. The butterfly hinge 9 is used to realize the rotation function so as to open or close the mesh plate 7.

[0045] Optionally, combined Figure 1 As shown, the ventilation group also includes a handle 10. The handle 10 is respectively installed on each mesh plate 7 and is used for holding. Among them, multiple handles 10 are respectively adjacent to multiple hinges.

[0046] In the disclosed embodiment, the ventilation group further includes a handle 10 respectively mounted on each mesh plate 7. The handles 10 are used for holding so as to manually open or close the mesh plate 7. In addition, the design of multiple handles 10 being respectively adjacent to multiple hinges can facilitate the operator to hold the handles 10 outside the smoke exhaust channel.

[0047] Optionally, combined Figure 1 and Figure 4 As shown, it also includes a threaded barrel 11, a threaded rod 12 and a chain 13. The threaded barrel 11 is respectively located between the shield tunnel 1 and each second flue plate 4 and each third flue plate 5. The threaded rod 12 is respectively threadedly connected to both ends of each threaded barrel 11. The chain 13 is respectively connected to the multiple threaded rods 12 at both ends, wherein the multiple chains 13 at one end are respectively connected to the second flue and the third flue plate 5, wherein the multiple chains 13 at the other end are all connected to the shield tunnel 1.

[0048] In the disclosed embodiment, a threaded barrel 11, a threaded rod 12 and a chain 13 are also included. During use, the threaded barrel 11 is rotated to change the extension length of the screw rods at both ends. Thus, the chains 13 at both ends are tightened, and finally the second flue plate 4 and the third flue plate 5 can be lifted, thereby reducing the weight on the first flue plate 3. The stress at the contact point between the first flue plate 3 and the second flue plate 4 and the third flue plate 5 is further reduced, thereby avoiding damage to the first flue plate 3, the second flue plate 4 and the third flue plate 5.

[0049] Optionally, combined Figure 1 and Figure 4 As shown, it also includes a spherical bearing 14. The spherical bearing 14 is installed between the connected threaded rod 12 and the chain 13 respectively.

[0050] In the disclosed embodiment, a joint bearing 14 is also included, which is respectively installed between the connected threaded rod 12 and the chain 13. After the joint bearing 14 is installed on the chain 13, it is used to be threadedly connected with the threaded rod 12. The threaded connection has the advantages of stable connection and easy assembly and disassembly.

[0051] Optionally, combined Figure 1 and Figure 4 As shown, the first base 15 is also included. The first base 15 is installed at the connection between each chain 13 and the second flue plate 4 and the third flue plate 5 respectively.

[0052] In the disclosed embodiment, a first base 15 is further included which is respectively installed at the connection between each chain 13 and the second flue plate 4 and the third flue plate 5. The first base 15 facilitates the connection of the chain 13 with the second flue plate 4 and the third flue plate 5.

[0053] Optionally, combined Figure 1 and Figure 4 As shown, the second base 16 is also included. The second bases 16 are respectively installed at the connection between the shield tunnel 1 and the plurality of chains 13.

[0054] In the embodiment of the present disclosure, the second base 16 is also included, which is respectively installed at the connection between the shield tunnel 1 and the plurality of chains 13. The second base 16 serves to facilitate the connection between the chain 13 and the shield tunnel 1.

[0055] The above description and the accompanying drawings sufficiently illustrate the embodiments of the present disclosure to enable those skilled in the art to practice them. Other embodiments may include structural and other changes. The embodiments represent only possible variations. Unless explicitly required, individual components and functions are optional, and the order of operations may vary. Portions and features of some embodiments may be included in or replace portions and features of other embodiments. The embodiments of the present disclosure are not limited to the structures described above and shown in the accompanying drawings, and various modifications and changes may be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. A flue plate structure for a tunnel, applied to a shield tunnel, characterized in that: include: A corbel is cast in the shield tunnel along the length direction of the shield tunnel and is located on both sides of the shield tunnel along the width direction of the shield tunnel; First flue plates are erected on the brackets on both sides and are evenly distributed along the length direction of the shield tunnel, and each of the first flue plates includes a first protrusion prefabricated on its edge; A second flue plate, respectively laid between two adjacent first flue plates and the corbels on one side, each of the second flue plates comprising a second protrusion prefabricated on its edge; A third flue plate is respectively laid between two adjacent first flue plates and the corbels on the other side thereof, a plurality of the third flue plates and a plurality of the second flue plates are symmetrically distributed one by one, and each of the third flue plates includes a third protrusion prefabricated on its edge; The ventilation components are respectively installed between the symmetrically distributed second flue plate and the third flue plate for ventilation; The shape and size of the first protrusion match those of the second protrusion and the third protrusion, and the second protrusion and the third protrusion are both mounted on the first protrusion.

2. A flue plate structure for a tunnel according to claim 1, characterized in that: The ventilation assembly comprises: Frames are respectively installed between the second flue plate and the third flue plate which are symmetrically distributed; The mesh panels are movably mounted on each of the frames and are used for ventilation; Wherein, along the height direction of the shield tunnel, the plurality of mesh plates are located above the plurality of frames.

3. A flue plate structure for a tunnel according to claim 2, characterized in that: The ventilation group also includes: Expansion bolts are respectively passed through each of the frames and are respectively installed on the second flue plate and the third flue plate which are symmetrically distributed.

4. A flue plate structure for a tunnel according to claim 2, characterized in that: The ventilation group also includes: Butterfly hinges are respectively installed between each of the frames and the corresponding mesh plates.

5. A flue plate structure for a tunnel according to claim 4, characterized in that: The ventilation group also includes: A handle, respectively mounted on each of the mesh panels, for holding; Wherein, the plurality of handles are respectively adjacent to the plurality of hinges.

6. A flue plate structure for a tunnel according to any one of claims 1 to 5, characterized in that: Also includes: A threaded cylinder, respectively located between the shield tunnel and each of the second flue plates and each of the third flue plates; A threaded rod, threadedly connected to both ends of each of the threaded barrels; Chains are respectively connected to the plurality of threaded rods at two ends, wherein the plurality of chains at one end are respectively connected to the second flue and the third flue plate, and the plurality of chains at the other end are all connected to the shield tunnel.

7. A flue plate structure for a tunnel according to claim 6, characterized in that: Also includes: Spherical bearings are respectively installed between the connected threaded rods and the chains.

8. A flue plate structure for a tunnel according to claim 6, characterized in that: Also includes: The first base is respectively installed at the connection between each of the chains and the second flue plate and the third flue plate.

9. A flue plate structure for a tunnel according to claim 6, characterized in that: Also includes: The second bases are respectively installed at the connection points between the shield tunnel and the plurality of chains.