Mine pit hole repairing structure
The multi-layer structure of sludge barrier substrate encapsulates the mine waste, which solves the problems of environmental pollution and geological disasters after backfill of mine waste, realizes the resource utilization and ecological restoration of waste, reduces disposal costs and increases Purification effect.
Patent Information
- Application Number
- CN202420706466.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-08
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-08
AI Technical Summary
Mining waste may lead to environmental pollution after backfill. The existing ecological ditches are single and have poor safety. It is difficult to effectively control geological disasters in open-pit pits and underground goafs. It is difficult for the existing technology to effectively reduce the cost of waste disposal and improve the purification effect.
Using multi-layer structure sludge barrier substrates, including natural foundation layer, sidewall sludge liner, triple composite sludge layer and top cover layer, reduce pollutant migration and curing through biochemical reactions, and form excellent hydraulic and Ecological barrier.
It has achieved effective encapsulation and resource utilization of mine waste, reduced waste disposal costs, reduced geological disaster risks, promoted ecological restoration and vegetation restoration, and formed a healthy internal environment.
Smart Images

Figure CN222065413U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of abandoned mine repair, in particular to a mine pit repair structure. Background Art
[0002] With the continuous development of mineral resources, a large amount of accumulated mining waste has been formed in the mining area on the one hand, and a large number of open pits and underground goaf areas have been generated on the other hand. In addition, mineral development has caused soil erosion and vegetation destruction around the mines, especially the long-term exposure of metal sulfides to the natural environment, which reacts with rainwater and oxygen to form acidic fluid at the bottom of the open pit, making it difficult for vegetation in the mine to survive. And with the cessation of maintenance work on the slopes and groundwater of the mines and goafs after the mining is completed, the instability of the slopes of the open pits and the collapse of the underground goafs will cause a series of geological environmental problems, which are difficult to control technically and costly.
[0003] Therefore, mining waste can be used to backfill open-pit mines or underground goafs. However, after simple backfilling, mining waste will become part of the local aquifer, which may cause secondary pollution to the surrounding environment and is a threatening potential source of pollution. For example, directly dumping limestone onto the repaired surface to purify acid pollution, although the operation is simple, it is easy to cause sewage blockage during the dumping process and will damage the mine landform. Another method is to lay a limestone purification layer in the mine to form an ecological ditch with a repair function. However, on the one hand, the existing ecological ditch is artificially laid, and the laying and repair efficiency is low. At the same time, it is restricted by the terrain, prone to mine collapse or rockfall, and poor operation safety. On the other hand, the existing ecological ditch has a single structural layer, and the effect of purifying acid pollution needs to be further improved.
[0004] In view of this, the present utility model is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide a mine pit repair structure. By different treatments of residual sludge, sludge barrier substrates with different functions are obtained to construct a sludge barrier for encapsulating mine waste filled in mine pits. The sludge barrier is not only a hydraulic barrier with excellent performance, but also a green and environmentally friendly ecological barrier. It can reduce the migration of stable pollutants, strengthen the solidification of mobile pollutants and create a healthy internal environment by means of the biochemical reaction process occurring inside it.
[0006] The utility model provides a mine pit repair structure, wherein a sludge lining is arranged on the natural foundation layer and the side wall of the mine pit;
[0007] The coating area of the sludge lining is provided with three layers of composite sludge layer, mine waste layer and top cover layer in sequence from the pit bottom to the pit top.
[0008] In the utility model, different types of sludge barrier substrates are provided through the setting of sludge lining, triple composite sludge layer and top cover layer. The multi-layer structure is composited to construct a sludge barrier with excellent performance for encapsulating mine waste, which can effectively achieve waste treatment and help reduce the cost of waste disposal site barrier system. At the same time, it also helps to reduce mine geological disasters and promote ecological restoration and vegetation recovery, helping to promote green mine construction.
[0009] Furthermore, the bottom sludge lining arranged on the natural base layer is a fly ash-lime stabilized excess sludge lining.
[0010] Furthermore, the thickness of the bottom sludge lining is greater than 0.75 m, for example, 0.75 m, 0.8 m, 0.85 m, 0.9 m, 0.95 m, 1.0 m, etc., and the permeability coefficient of the bottom sludge lining is 1.0×10 -7 cm·s -1 Below, for example, it can be 1.0×10 -7 cm·s -1 , 0.95×10 -7 cm·s -1 , 0.9×10 -7 cm·s -1 , 0.85×10 -7 cm·s -1 , 0.8×10 -7 cm·s -1 , 0.7×10 -7 cm·s -1 , 0.6×10 -7 cm·s -1 , 0.5×10 -7 cm·s -1 , 0.4×10 -7 cm·s -1 , 0.3×10 -7 cm·s -1 , 0.2×10 -7 cm·s -1 , 1.0×10 -8 cm·s -1 wait.
[0011] Furthermore, the side wall sludge lining arranged on the side wall is a fly ash-lime stabilized excess sludge lining.
[0012] Furthermore, the thickness of the side wall sludge lining is greater than 0.75 m, for example, 0.75 m, 0.8 m, 0.85 m, 0.9 m, 0.95 m, 1.0 m, etc., and the permeability coefficient of the side wall sludge lining is 1.0×10-7 cm·s -1 Below, for example, it can be 1.0×10 -7 cm·s -1 , 0.95×10 -7 cm·s -1 , 0.9×10 -7 cm·s -1 , 0.85×10 -7 cm·s -1 , 0.8×10 -7 cm·s -1 , 0.7×10 -7 cm·s -1 , 0.6×10 -7 cm·s -1 , 0.5×10 -7 cm·s -1 , 0.4×10 -7 cm·s -1 , 0.3×10 -7 cm·s -1 , 0.2×10 -7 cm·s -1 , 1.0×10 -8 cm·s -1 wait.
[0013] Furthermore, the three-stage composite sludge layer includes, from the bottom of the pit to the top of the pit, a residual sludge layer, an anaerobic ammonium oxidation sludge layer and a nitrification sludge layer.
[0014] Furthermore, the sludge in the residual sludge layer comes from any one of the primary sedimentation tank, the secondary sedimentation tank or the fermentation device of the sewage treatment plant, or a combination of at least two of them.
[0015] Furthermore, the anaerobic ammonium oxidation sludge is anaerobic ammonium oxidation biofilm sludge and / or granular sludge.
[0016] Furthermore, the nitrified sludge comes from an aerobic tank in a sewage treatment plant.
[0017] Furthermore, the thickness of the residual sludge layer is 0.3-0.8 m, for example, 0.3 m, 0.35 m, 0.4 m, 0.45 m, 0.5 m, 0.55 m, 0.6 m, 0.65 m, 0.7 m, 0.75 m, 0.8 m, etc., and the permeability coefficient of the residual sludge layer is 1.0×10 -7 cm·s -1 Below, for example, it can be 1.0×10 -7 cm·s -1 , 0.95×10 -7 cm·s -1 , 0.9×10-7 cm·s -1 , 0.85×10 -7 cm·s -1 , 0.8×10 -7 cm·s -1 , 0.7×10 -7 cm·s -1 , 0.6×10 -7 cm·s -1 , 0.5×10 -7 cm·s -1 , 0.4×10 -7 cm·s -1 , 0.3×10 -7 cm·s -1 , 0.2×10 -7 cm·s -1 , 1.0×10 -8 cm·s -1 , 1.0×10 - 10 cm·s -1 , 1.0×10 -12 cm·s -1 , 1.0×10 -13 cm·s -1 wait.
[0018] Furthermore, the thickness ratio of the anaerobic ammonium oxidation sludge layer to the nitrification sludge layer is (1-2):(1-3);
[0019] Here, “1-2” can be, for example, 1, 1.2, 1.4, 1.6, 1.8, 2, etc.
[0020] Here, “1-3” can be, for example, 1, 1.2, 1.4, 1.6, 1.8, 2, 2.2, 2.4, 2.6, 2.8, 3, etc.
[0021] As an optional technical solution of the utility model, the top cover layer includes, from the bottom of the pit to the top of the pit, a covering layer, a protective layer and a vegetation soil layer.
[0022] Furthermore, the total soil cover thickness of the top cover layer is above 80 cm, for example, it can be 80 cm, 85 cm, 90 cm, 95 cm, 100 cm, 150 cm, 200 cm, etc.
[0023] Furthermore, the thickness of the covering layer is 20 to 30 cm, for example, it may be 20 cm, 21 cm, 22 cm, 23 cm, 24 cm, 25 cm, 26 cm, 27 cm, 28 cm, 29 cm, 30 cm, etc.
[0024] Furthermore, the permeability coefficient of the covering layer is 1.0×10 -7 cm / s or less, for example, 1×10 -7 cm·s -1 , 0.95×10 -7 cm·s -1 , 0.9×10 -7 cm·s -1 , 0.85×10 -7 cm·s -1 , 0.8×10 -7 cm·s -1 , 0.7×10 - 7 cm·s -1 , 0.6×10 -7 cm·s -1 , 0.5×10 -7 cm·s -1 , 0.4×10 -7 cm·s -1 , 0.3×10 -7 cm·s -1 , 0.2×10 -7 cm·s -1 , 1×10 -8 cm·s -1 wait.
[0025] Furthermore, the thickness of the protective layer is 20 to 30 cm, for example, it can be 20 cm, 21 cm, 22 cm, 23 cm, 24 cm, 25 cm, 26 cm, 27 cm, 28 cm, 29 cm, 30 cm, etc.
[0026] Furthermore, the thickness of the vegetation soil layer is more than 20 cm, for example, it can be 20 cm, 21 cm, 22 cm, 23 cm, 24 cm, 25 cm, 26 cm, 27 cm, 28 cm, 29 cm, 30 cm, etc.
[0027] Furthermore, the covering layer includes excess sludge, sulphoaluminate cement, fly ash and bottom ash from the incineration of domestic waste.
[0028] Preferably, the mass ratio of the excess sludge, sulphoaluminate cement, fly ash and bottom ash from incineration of domestic waste is (4-6):(1-3):(1-2):(1-2);
[0029] Among them, "4-6" can be, for example, 4, 4.2, 4.4, 4.6, 4.8, 5, 5.2, 5.4, 5.6, 5.8, 6, etc.
[0030] Here, “1-3” can be, for example, 1, 1.2, 1.4, 1.6, 1.8, 2, 2.2, 2.4, 2.6, 2.8, 3, etc.
[0031] Here, “1-2” can be, for example, 1, 1.2, 1.4, 1.6, 1.8, 2, etc.
[0032] Furthermore, the protective layer includes mine waste.
[0033] Furthermore, the vegetation soil layer includes mine waste and anaerobic digestion sludge.
[0034] Preferably, the vegetation soil layer is formed by covering the anaerobic digestion sludge with mine waste soil.
[0035] Preferably, the vegetation soil layer is a mixture of mine waste and anaerobic digestion sludge.
[0036] Preferably, the anaerobic digested sludge accounts for 20-50% of the total volume of the mixture of mine spoil and anaerobic digested sludge, for example, it can be 20%, 22%, 24%, 26%, 28%, 30%, 32%, 34%, 36%, 38%, 40%, 42%, 44%, 46%, 48%, 50%, etc.
[0037] Preferably, the anaerobic digestion sludge includes high-temperature anaerobic digestion sludge of zeolite combined with excess sludge and / or medium-temperature anaerobic digestion sludge of fly ash combined with excess sludge.
[0038] As an optional technical solution of the utility model, the top cover layer includes, from the bottom of the pit to the top of the pit, a geomembrane layer, a protective layer and a vegetation soil layer.
[0039] Compared with the prior art, the utility model has the following beneficial effects:
[0040] (1) The mine pit repair structure provided by the utility model can restore the land function of open-pit mines and low-lying areas and prevent the collapse of underground goaf areas; from the perspective of comprehensive utilization, directly backfilling the mining waste generated by adjacent mining areas in production into open-pit mines, surface collapse areas or underground goaf areas is an effective measure to solve geological environmental disasters in mining areas.
[0041] (2) The mine pit repair structure provided by the utility model is used as an encapsulation barrier for solid waste disposal sites. It can not only effectively reduce the pollution of solid waste and solid waste disposal sites to the environment, realize the ecological restoration and vegetation restoration of abandoned mines, but also realize the resource utilization of solid waste, and ultimately achieve the purpose of treating waste with waste.
[0042] (3) The mine pit repair structure provided by the utility model is a hydraulic barrier with excellent performance, which can meet the anti-seepage requirements, strength requirements and leaching toxicity requirements of mine waste disposal sites and has excellent durability.
[0043] (4) The mine pit repair structure provided by the utility model is a green and environmentally friendly ecological barrier, which can reduce the migration of stable pollutants, strengthen the solidification of mobile pollutants and create a healthy internal environment by means of the biochemical reaction process occurring inside it. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0045] Figure 1 Schematic diagram of the structure of mine pit repair with a one-stage side wall sludge lining.
[0046] Figure 2 Schematic diagram of the structure of mine pit repair with segmented side wall sludge lining.
[0047] Figure 3 Schematic diagram of the structure of the triple composite sludge layer.
[0048] Figure 4 Schematic diagram of the structure of the top cover layer.
[0049] Among them, 1 is the natural base layer, 2 is the fly ash-lime stabilized residual sludge lining, 21 is the bottom sludge lining, 22 is the side wall sludge lining, 3 is the triple composite sludge layer, 31 is the residual sludge layer, 32 is the anaerobic ammonium oxidation sludge layer, 33 is the nitrification sludge layer, 4 is the mine waste layer, 5 is the top cover layer, 51 is the covering layer, 52 is the protective layer, and 53 is the vegetation soil layer. DETAILED DESCRIPTION
[0050] The technical solution of the utility model will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0051] Example 1
[0052] This embodiment provides a mine pit repair structure with a one-stage side wall sludge lining structure.
[0053] like Figure 1 As shown, the mine pit repair structure includes spreading fly ash-lime stabilized residual sludge on the natural base layer 1 at the bottom of the mine pit, and compacting it to form a fly ash-lime stabilized residual sludge layer 2 at the bottom, i.e., a bottom sludge lining 21; and stacking fly ash-lime stabilized residual sludge along the side wall of the mine pit, and compacting it to form a one-section fly ash-lime stabilized residual sludge layer 2 on the side wall, i.e., a side wall sludge lining 22.
[0054] The thickness of the bottom sludge lining formed after compaction is 0.75m, and the permeability coefficient is 1×10 -7 cm·s -1 The thickness of the side wall sludge lining formed after compaction is 0.75m, and the permeability coefficient is 1×10 -7 cm·s -1 .
[0055] like Figure 1 As shown, three layers of composite sludge layer 3 and mine waste layer 4 are arranged in sequence above the bottom sludge lining layer 21; and finally a top cover layer 5 is arranged.
[0056] like Figure 3 As shown, the three-layer composite sludge layer includes, from bottom to top, a residual sludge layer 31, an anaerobic ammonium oxidation sludge layer 32, and a nitrification sludge layer 33.
[0057] The thickness of the residual sludge layer is 0.5 m, and the permeability coefficient is 1.0×10 -12 cm·s -1 ; The thickness ratio of the anaerobic ammonium oxidation sludge layer and the nitrification sludge layer is 1:1.
[0058] like Figure 4 As shown, the top cover layer includes a covering layer 51, a protective layer 52, and a vegetation soil layer 53 from bottom to top; and the vegetation soil layer 53 is planted with restorative plants.
[0059] The total soil thickness of the top cover layer is 80 cm; the thickness of the cover layer is 25 cm, and the permeability coefficient of the cover layer is 1.0×10 -12 cm / s, the thickness of the protective layer is 25 cm, and the thickness of the vegetation soil layer is 30 cm.
[0060] Example 2
[0061] This embodiment provides a mine pit repair structure with a segmented side wall sludge lining structure.
[0062] like Figure 2As shown, it is Figure 1 The difference is that the fly ash-lime stabilized residual sludge is filled into the side wall of the mine pit in three sections and compacted to form a complete side wall fly ash-lime stabilized residual sludge layer 2, i.e., a side wall sludge lining 22; and three composite sludge layers 3 and mine waste layers 4 are arranged in sequence at each section.
[0063] The thickness of the bottom sludge lining 21 formed after compaction is 0.78 m, and the permeability coefficient is 1×10 - 12 cm·s -1 The thickness of the side wall sludge lining 22 formed after compaction is 0.85m, and the permeability coefficient is 1×10 -12 cm·s -1 .
[0064] like Figure 3 As shown, the three-layer composite sludge layer includes, from bottom to top, a residual sludge layer 31, an anaerobic ammonium oxidation sludge layer 32, and a nitrification sludge layer 33.
[0065] The thickness of the residual sludge layer is 0.6 m, and the permeability coefficient is 1.0×10 -12 cm·s -1 ; The thickness ratio of the anaerobic ammonium oxidation sludge layer and the nitrification sludge layer is 1:3.
[0066] like Figure 4 As shown, the top cover layer includes a covering layer 51, a protective layer 52, and a vegetation soil layer 53 from bottom to top; and the vegetation soil layer 53 is planted with restorative plants.
[0067] The total soil thickness of the top cover layer is 100 cm; the thickness of the cover layer is 30 cm, and the permeability coefficient of the cover layer is 1.0×10 -13 cm / s, the thickness of the protective layer is 30 cm, and the thickness of the vegetation soil layer is 40 cm.
[0068] Example 3
[0069] This embodiment provides a mine pit repair method combining mine waste backfilling and excess sludge encapsulation. The difference from the embodiment 1 is that in the setting of the top cover layer S5: a geomembrane layer, a protective layer and a vegetation soil layer are sequentially arranged above the mine waste layer to form a top cover layer; the thickness of the geomembrane layer is 1.5 mm, and the permeability coefficient is 1.0×10 -12 cm / s; other steps are exactly the same as those in Example 1.
[0070] Comparative Example 1
[0071] This comparative example provides a mine pit repair structure, which is different from Example 1 only in that no bottom sludge lining is provided above the natural foundation layer at the bottom of the mine pit, and the other steps are exactly the same as Example 1.
[0072] Comparative Example 2
[0073] This comparative example provides a mine pit repair structure, which is different from Example 1 only in that the side walls of the mine pit are not provided with side wall sludge linings, and the other steps are exactly the same as Example 1.
[0074] Comparative Example 3
[0075] This comparative example provides a mine pit repair structure, which is different from Example 1 only in that the residual sludge is not backfilled in S3, and the backfilling amount of anaerobic ammonium oxidation sludge and nitrification sludge is ensured to be consistent with the backfilling amount of anaerobic ammonium oxidation sludge and nitrification sludge in Example 1, respectively, and the other steps are completely consistent with Example 1.
[0076] Comparative Example 4
[0077] This comparative example provides a mine pit repair structure, which differs from Example 1 only in that anaerobic ammonia oxidation sludge is not backfilled, and the backfilling amounts of residual sludge and nitrification sludge are ensured to be consistent with the backfilling amounts of residual sludge and nitrification sludge in Example 1, respectively. The other steps are completely consistent with Example 1.
[0078] Comparative Example 5
[0079] This comparative example provides a mine pit repair structure, which differs from Example 1 only in that nitrification sludge is not backfilled, and the backfilling amounts of residual sludge and anaerobic ammonium oxidation sludge are ensured to be consistent with the backfilling amounts of residual sludge and anaerobic ammonium oxidation sludge in Example 1, respectively, and the other steps are completely consistent with Example 1.
[0080] Test Example 1
[0081] The service performance of the above-mentioned embodiments and comparative examples and the generation trend of acid mine drainage during the service period are investigated. The specific test results are shown in Table 1 below:
[0082] Table 1
[0083]
[0084] As shown in Table 1, the mine pit repair structure provided by the utility model can restore the land function of open-pit mines and low-lying areas, prevent the collapse of underground goaf areas, and realize the ecological restoration and vegetation restoration of abandoned mines; and the mine pit repair structure is both an excellent hydraulic barrier and a green and environmentally friendly ecological barrier, which can not only meet the technical requirements for encapsulating mine waste, but also realize the resource utilization of solid waste, and ultimately achieve the purpose of treating waste with waste.
[0085] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, ordinary technicians in this field should understand that they can still modify the technical solutions recorded in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solution deviate from the scope of the technical solution of the embodiments of the utility model.
Claims
1. A mine pit repair structure, characterized in that: The natural foundation layer and side walls of the mine pit are provided with a sludge lining; The coating area of the sludge lining is provided with three layers of composite sludge layer, mine waste layer and top cover layer in sequence from the pit bottom to the pit top.
2. The mine pit repair structure according to claim 1, characterized in that: The bottom sludge lining provided on the natural foundation layer is a fly ash-lime stabilized excess sludge lining; The thickness of the bottom sludge lining is more than 0.75 m, and the permeability coefficient of the bottom sludge lining is 1.0×10 -7 cm·s -1 the following.
3. The mine pit repair structure according to claim 1, characterized in that: The side wall sludge lining provided on the side wall is a fly ash-lime stabilized excess sludge lining; The thickness of the side wall sludge lining is more than 0.75 m, and the permeability coefficient of the side wall sludge lining is 1.0×10 -7 cm·s -1 the following.
4. The mine pit repair structure according to claim 1, characterized in that: The three-stage composite sludge layer includes, from the bottom of the pit to the top of the pit, a residual sludge layer, an anaerobic ammonium oxidation sludge layer and a nitrification sludge layer.
5. The mine pit repair structure according to claim 4, characterized in that: The thickness of the residual sludge layer is 0.3-0.8 m, and the permeability coefficient of the residual sludge layer is 1.0×10 -7 cm·s -1 the following.
6. The mine pit repair structure according to claim 4, characterized in that: The thickness ratio of the anaerobic ammonium oxidation sludge layer to the nitrification sludge layer is (1-2):(1-3).
7. The mine pit repair structure according to claim 1, characterized in that: The top cover layer includes, from the bottom of the pit to the top of the pit, a covering layer, a protective layer and a vegetation soil layer.
8. The mine pit repair structure according to claim 7, characterized in that: The total soil covering thickness of the top cover layer is above 80 cm.
9. The mine pit repair structure according to claim 7 or 8, characterized in that: The thickness of the covering layer is 20 to 30 cm, and the permeability coefficient of the covering layer is 1.0×10 -7 cm / s or less; the thickness of the protective layer is 20 to 30 cm; the thickness of the vegetation soil layer is more than 20 cm.
10. The mine pit repair structure according to claim 1, characterized in that: The top cover layer includes, from the bottom of the pit to the top of the pit, a geomembrane layer, a protective layer and a vegetation soil layer.