Slope structure suitable for installing booster station in new energy project

By adopting horizontal foundation and multi-stage slope protection structures in steep mountains, combined with the design of retaining walls, foot protection walls and sluice ditches, the installation and slope stability of mountain booster stations are solved, and preventing precipitation and water accumulation are achieved. and stability of slope protection structure.

CN222065508UActive Publication Date: 2024-11-26SHENZHEN ENERGY NORTH ENERGY HLDG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420671339.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-11-26
Estimated Expiration
2034-04-02

AI Technical Summary

Technical Problem

How to build a boost station for new energy projects in areas with steep mountains and limited ground space, and keep the slopes solid and stable to prevent the mountain from accumulated precipitation on the ground of the boost station.

Method used

Adopt horizontal foundation and multi-stage slope protection structure, including retaining walls, foot protection walls, slopes, horse paths and gutters. The retaining walls and foot protection walls are set on the outside of the horizontal foundation, and multiple constructions are built in sequence on the outside of the mountain. The slope protection of each level of slope protection is connected to the horse path, and the interceptor ditches extend along the inner edge of the horse path to collect precipitation and prevent water accumulation.

Benefits of technology

The stability and safety of installing boost stations in mountainous areas with large slopes is achieved, and the erosion and damage of precipitation to the slope protection and the accumulation of water on the foundation is avoided, providing convenient conditions for construction and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222065508U_ABST
    Figure CN222065508U_ABST
Patent Text Reader

Abstract

The utility model provides a slope structure suitable for installing a booster station in a new energy project, a horizontal foundation is built at the set height of the outer side of a mountain, the booster station is installed on the horizontal foundation, a retaining wall is built between the outer edge of the horizontal foundation and the mountain below the horizontal foundation, and a foot protection wall is built between the inner edge of the horizontal foundation and the bottom of a multi-stage protection slope. The multi-stage slope protection is sequentially built along the mountain, each stage of slope protection comprises a slope body, a riding track and an intercepting ditch, the slope bodies are obliquely arranged along the mountain, the riding tracks are horizontally arranged, the outer edges of the riding tracks are connected with the tops of the adjacent slope bodies, and the bottoms of the slope bodies of all stages of slope protection are connected with the inner edges of the riding tracks of the adjacent next stage of slope protection. The intercepting ditches are dug in the riding tracks of all levels and extend along the inner edges. The provided slope structure can solve the problem that a new energy project booster station cannot be built in a mountain with steep terrain and limited ground space, the firmness and stability of the slope after the booster station is built are kept, and rainfall of the mountain is prevented from accumulating on the ground of the booster station.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of booster station engineering for new energy projects, and in particular provides a slope structure suitable for installing a booster station for new energy projects. Background Art

[0002] In recent years, my country's new energy industry has developed rapidly. As the number of photovoltaic and wind power stations increases year by year, the flat land resources such as Gobi Desert, desert and grassland are decreasing. It has become a trend to build photovoltaic and wind power stations in mountainous areas, and each project requires a different number of booster stations.

[0003] Mountainous terrain has high altitude, high wind speed, abundant wind resources, clean air and less dust. In response to the national call, various power generation companies have built more and more mountain wind farms and mountain photovoltaic power plants. During the construction of the booster station for new energy projects, in areas with gentler mountains, part of the mountain is excavated to form a flat area for the layout of the booster station. After excavation, the upright mountain is supported by retaining walls to avoid landslides. However, in areas with steep mountains, the above retaining wall support technology cannot be applied.

[0004] There is an urgent need to solve the technical problem of how to build a booster station for a new energy project on a mountain with steep terrain and limited ground space, keep the slope solid and stable after the booster station is built, and prevent mountain precipitation from accumulating on the ground of the booster station. Utility Model Content

[0005] Based on this, the utility model provides a slope structure suitable for the installation of a booster station for a new energy project, so as to solve the problem of building a booster station for a new energy project on a mountain with steep terrain and limited ground space, and to maintain the firmness and stability of the slope after the booster station is built, thereby preventing mountain precipitation from accumulating on the ground of the booster station.

[0006] In order to achieve the above-mentioned purpose, the technical solution of the utility model is: a slope structure suitable for the installation of a booster station for a new energy project, comprising a horizontal foundation and a multi-level slope protection; the horizontal foundation is built at a set height outside the mountain, the booster station is installed on the horizontal foundation, a retaining wall is built between the outer edge of the horizontal foundation and the mountain below, and a footing wall is built between the inner edge and the bottom of the multi-level slope protection; the multi-level slope protection is built in sequence along the mountain, and each level of slope protection includes a slope body, a horse path and a drainage ditch, the slope body is arranged obliquely along the mountain body, the horse path is arranged horizontally and the outer edge is connected to the top of the adjacent slope body, the bottom of the slope body of each level of slope protection is connected to the inner edge of the horse path of the adjacent next level of slope protection, and the drainage ditch is dug on the surface of the horse path at each level and extends along the inner edge.

[0007] Furthermore, the retaining wall is constructed between the slope of the first level of the bottom slope protection and the horizontal foundation, the foot of the retaining wall is buried in the inner edge of the horizontal foundation, and the top of the wall is not set lower than the horizontal foundation.

[0008] Furthermore, vegetation is planted and / or mortar-stone structures are laid on the surface of the slopes at each level.

[0009] Furthermore, the inner edge of the horse path is arranged lower than the outer edge, and the intercepting ditch is dug at the inner edge of the horse path and the ditch edge is lower than the inner edge.

[0010] Furthermore, the slope of the first level slope protection at the top is directly connected to the upper mountain without a horse path, and the intercepting ditch extends along the connection between the top of the slope and the upper mountain.

[0011] Furthermore, the intercepting ditch extends along the inner edge of the horse path to near the two ends of the multi-level slope protection, and drainage ditches descending along the mountain are arranged at the two end edges of the slope protection, and each of the intercepting ditches is connected to the drainage ditch respectively.

[0012] Furthermore, the foot of the retaining wall is buried in the mountain below, and the top of the wall is not lower than the horizontal foundation.

[0013] Furthermore, the end portions of the footing wall and the retaining wall are connected end to end to form an annular mortar-stone structure surrounding the horizontal foundation.

[0014] Furthermore, the horizontal foundation is located in the annular mortar-stone structure and a foundation trench is dug, and a concrete layer and a crushed stone layer are laid from bottom to top in the foundation trench, and the surface of the crushed stone layer is flush with the top of the annular mortar-stone structure.

[0015] Furthermore, the intercepting ditch extends along the inner edge of the horse path to near the two ends of the multi-level slope protection, and drainage ditches descending along the mountain are arranged at the two end edges of the slope protection, and each of the intercepting ditches is connected to the drainage ditch respectively.

[0016] The beneficial effects of the slope structure provided for the installation of booster stations in new energy projects are mainly reflected in:

[0017] 1. The outer edge of the horizontal foundation built on the outside of the mountain is supported by a retaining wall, and the inner edge is protected by a toe wall. The booster station is installed on the horizontal foundation, and the structure is solid and stable, which solves the problem that the booster station cannot be installed in the mountainous area with a large slope and limited ground space;

[0018] 2. By sequentially building multiple levels of slope protection on the mountain above the horizontal foundation, the horse paths of each level of slope protection are connected with the obliquely arranged slope body up and down, which is not only conducive to the structural stability of the slope protection structure, but also provides a working surface for the construction of the upper slope body, which is convenient for construction and later maintenance;

[0019] 3. By constructing a ditches on the inner edge of the horse trail to collect precipitation from the upper slope, it can not only prevent precipitation from flowing down layer by layer and eroding the slope, but also prevent it from flowing into the horizontal foundation and causing water accumulation. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings, which constitute a part of the specification, illustrate embodiments of the present disclosure and, together with the description, serve to explain the principles of the present disclosure.

[0021] The present disclosure may be more clearly understood from the following detailed description with reference to the accompanying drawings, in which:

[0022] Figure 1 It is a structural schematic diagram of a slope structure suitable for installation of a booster station for a new energy project provided according to an embodiment of the utility model;

[0023] Figure 2 It is a schematic diagram of the original topographic structure of the mountain before the slope structure is built;

[0024] Figure 3 It is a horizontal foundation cross-sectional view of a slope structure provided according to an embodiment of the utility model;

[0025] Figure 4 It is a structural schematic diagram of the connection between the intercepting ditch and the drainage ditch of the slope structure provided according to an embodiment of the utility model;

[0026] Figure 5 It is a construction flow chart of a slope structure provided according to an embodiment of the utility model;

[0027] Description of the accompanying drawings:

[0028] In the figure, 1- footing wall, 2- slope, 3- horse path, 4- intercepting ditch, 5- retaining wall, 6- horizontal foundation, 7- concrete layer, 8- gravel layer, 9- mountain, 10- drainage structure, 11- original mountain terrain.

[0029] Various exemplary embodiments of the present disclosure will now be described in detail with reference to the accompanying drawings. The description of the exemplary embodiments is merely illustrative and is by no means intended to limit the present disclosure and its application or use. The present disclosure can be implemented in many different forms, not limited to the embodiments herein. DETAILED DESCRIPTION

[0030] Various exemplary embodiments of the present disclosure will now be described in detail with reference to the accompanying drawings. The description of the exemplary embodiments is merely illustrative and is by no means intended to limit the present disclosure and its application or use. The present disclosure can be implemented in many different forms, not limited to the embodiments herein.

[0031] Example 1

[0032] like Figure 1 As shown, the utility model provides a slope structure suitable for the installation of a booster station for a new energy project, comprising a horizontal foundation 6 and a multi-level slope protection; the horizontal foundation 6 is constructed at a set height outside a mountain 9, the booster station is installed on the horizontal foundation 6, a retaining wall 5 is constructed between the outer edge of the horizontal foundation 6 and the mountain 9 below, and a footing wall 1 is constructed between the inner edge and the bottom of the multi-level slope protection; the multi-level slope protection is constructed in sequence along the mountain 9, and each level of slope protection comprises a slope body 2, a horseway 3 and a drainage ditch 4, respectively, the slope body 2 is arranged obliquely along the mountain 9, the horseway 3 is arranged horizontally and the outer edge is connected to the top of the adjacent slope body 2, the bottom of the slope body 2 of each level of slope protection is connected to the inner edge of the horseway 3 of the adjacent next level of slope protection, and the drainage ditch 4 is dug on the surface of the horseway 3 at each level and extends along the inner edge.

[0033] Among them, the footing wall 1 supports the slope 2 and stabilizes the entire slope protection; the slope 2 has a slope of 1:n, which is determined according to the soil quality and the height to be treated, with widths of B1 and B3, and heights of H1 and H2. The horseway 3 is used for construction and maintenance, and also plays a role in supporting the slope 2, with a width of B2; the intercepting ditch 4 is used for drainage to increase the stability and durability of the slope protection structure; the retaining wall 5 is used to support and enclose the foundation and structures in the booster station.

[0034] Based on the above embodiment, a horizontal foundation is constructed on the outside of the mountain and protected by a retaining wall 5 and a toe wall 1, and the booster station is installed on the horizontal foundation 6, thereby realizing the installation of the booster station in a mountain with a large slope and limited ground space. By successively constructing multiple levels of slope protection on the mountain above the horizontal foundation 6, the structure of the entire slope structure is kept solid and stable. The horse paths 3 of each level of slope protection are connected to the obliquely arranged slope 2 up and down, which not only provides a working surface for the construction of the upper slope 2, but also prevents precipitation from flowing down layer by layer and eroding and damaging the slope 2, and also prevents water from flowing into the horizontal foundation to cause accumulation.

[0035] During the construction process, vegetation is planted and / or mortar-stone structures are laid on the surface of the slope 2 at each level.

[0036] Furthermore, the inner edge of the horseway 3 is arranged lower than the outer edge, and the intercepting ditch 4 is dug at the inner edge of the horseway 3 and the ditch edge is lower than the inner edge.

[0037] Furthermore, the slope 2 of the first level slope protection at the top is directly connected to the upper mountain 9 without a horse path 3, and the intercepting ditch 4 extends along the connection between the top of the slope 2 and the upper mountain 9.

[0038] like Figure 5 As shown, during the implementation process, the principle of first measuring the topographic map of the booster station area and exploring the soil conditions should be followed, then digging out a flat area according to the booster station range line and constructing a retaining wall, and finally constructing the slope protection structure should be followed. The construction sequence and method are as follows:

[0039] S10. Accurately measure the topography in the booster station area and identify soil characteristics, such as Figure 2 As shown, the planning and design of the land for the booster station foundation is carried out on the original mountain terrain;

[0040] S20. Level the site outside the upper body according to the booster station design, excavate the level area as a horizontal foundation 6, and construct the retaining wall 5. The height and type of the retaining wall 5 are determined according to the site topography;

[0041] S30. Determine the height and range to be processed according to the height, slope and soil quality of the mountain 9, and determine B1, B2, B3, H1 and H2. Usually, the width of the B2 bridleway is 3m, which can also be adjusted according to actual conditions. B1 and H1, B3 and H2 are converted by the slope 1:n, B1 = nH1, B3 = nH2;

[0042] S40. According to the above slope protection parameters, the mountain is cut so that the slope reaches the design value of 1:n, and the slope protection is constructed step by step from the bottom to the top;

[0043] S50. After the first level of slope protection at the bottom is completed, the bottom footing wall 1 is built, and then the horse path 3 is built;

[0044] S60. Then construct the second level of slope protection, and then construct the horse trail 3, and then advance to the top of the mountain in sequence until the top of the mountain;

[0045] S70. After the slope and the bridleway are constructed, a drainage ditch 4 is constructed. The size is usually 400mmx400mm, and can also be adjusted according to the regional precipitation and slope protection size to ensure smooth drainage in the rainy season;

[0046] S80. After the construction of the main structures such as the slope 2, the horse path 3, and the intercepting ditch 4 is completed, plants can be planted on the slope or mortar masonry can be laid to maintain the slope.

[0047] Example 2

[0048] like Figure 3 As shown, based on Example 1, further optimization is performed. Specifically, the footing wall 1 is constructed between the slope 2 of the first level slope protection at the bottom and the horizontal foundation 6. The foot of the footing wall 1 is buried in the inner edge of the horizontal foundation 6, and the top of the wall is not lower than the horizontal foundation 6. In addition, the foot of the retaining wall 5 is buried in the lower mountain 9, and the top of the wall is not lower than the horizontal foundation 6. The end of the footing wall 1 is connected end to end with the end of the retaining wall 5 to form an annular mortar-stone structure surrounding the horizontal foundation 6.

[0049] Furthermore, the horizontal foundation 6 is located in the annular mortar-stone structure and a foundation trench is dug. A concrete layer 7 and a crushed stone layer 8 are laid from bottom to top in the foundation trench. The surface of the crushed stone layer 8 is flush with the top of the annular mortar-stone structure.

[0050] Based on this embodiment, the footing wall 1 and the retaining wall 5 form an annular mortar-stone structure surrounding the horizontal foundation 6, and a concrete layer 7 and a crushed stone layer are laid in the horizontal foundation 6, thereby improving the structural strength and the characteristics of preventing water accumulation.

[0051] Example 3

[0052] like Figure 4 As shown, it is further optimized on the basis of Example 1 or Example 2. Specifically, the intercepting ditch 4 extends along the inner edge of the horseway 3 to the vicinity of the two ends of the multi-level slope protection. The two end edges of the slope protection are provided with drainage ditches 10 that descend along the mountain 9, and each of the intercepting ditches 4 is respectively connected to the drainage ditch 10. The drainage ditch 10 includes a horizontal ditch section dug on the surface of each of the horseways 3 and an oblique ditch section dug on the surface of each of the slopes 2. The horizontal ditch section is connected with the oblique ditch section in sequence and a continuous mortar masonry structure is laid on the bottom of the ditch. The intercepting ditch 4 is connected with the horizontal ditch section, and the depth of the horizontal ditch section is greater than the depth of the intercepting ditch 4 connected thereto.

[0053] Based on this embodiment, the intercepting ditch 4 collects the precipitation from the upper slope, and the drainage ditch 10 discharges the water in the intercepting ditch in time to prevent the precipitation from flowing down layer by layer and eroding and destroying the slope protection structure, and avoids the accumulation of slope precipitation in the horizontal foundation below.

[0054] The slope structure provided makes full use of the stability of the soil itself, plans different slopes and heights according to different soil types, and forms a multi-level slope protection in combination with the construction of horse trails. It makes full use of the stability of the slope protection surface soil itself and builds a footing wall at the bottom, and forms a multi-level slope protection in combination with the construction of horse trails; combined with the arrangement of intercepting ditches, the slope protection structure is more stable and durable, which solves the technical problem that booster stations cannot be built in high and steep mountainous areas.

[0055] Although some specific embodiments of the present disclosure have been described in detail by way of examples, it should be understood by those skilled in the art that the above examples are for illustration only and are not intended to limit the scope of the present disclosure. It should be understood by those skilled in the art that the above embodiments may be modified or some technical features may be replaced by equivalents without departing from the scope and spirit of the present disclosure. The scope of the present disclosure is defined by the appended claims.

Claims

1. A slope structure suitable for the installation of a booster station for a new energy project, characterized in that: It includes a horizontal foundation (6) and multiple levels of slope protection; The horizontal foundation (6) is constructed at a set height outside the mountain (9), the booster station is installed on the horizontal foundation (6), a retaining wall (5) is constructed between the outer edge of the horizontal foundation (6) and the mountain (9) below, and a footing wall (1) is constructed between the inner edge and the bottom of the multi-level slope protection; The multi-level slope protection is constructed along the mountain (9), and each level of the slope protection comprises a slope body (2), a horse path (3) and a ditches (4). The slope body (2) is arranged obliquely, the horse path (3) is arranged horizontally and its outer edge is connected to the top of the adjacent slope body (2), the bottom of the slope body (2) of each level of the slope protection is connected to the inner edge of the horse path (3) of the adjacent next level of the slope protection, and the ditches (4) are dug on the surface of each level of the horse path (3) and extend along the inner edge.

2. The slope structure suitable for installation of a booster station for a new energy project according to claim 1 is characterized in that: The footing wall (1) is constructed between the slope (2) of the first level of slope protection at the bottom and the horizontal foundation (6); the foot of the footing wall (1) is buried in the inner edge of the horizontal foundation (6), and the top of the wall is not lower than the horizontal foundation (6).

3. The slope structure suitable for installation of a booster station for a new energy project according to claim 1 is characterized in that: Vegetation is planted and / or mortar-stone structures are laid on the surface of the slopes at each level.

4. The slope structure suitable for installation of a booster station for a new energy project according to claim 1 is characterized in that: The inner edge of the horse path (3) is arranged lower than the outer edge, and the intercepting ditch (4) is dug at the inner edge of the horse path (3) and the ditch edge is lower than the inner edge.

5. The slope structure suitable for installation of a booster station for a new energy project according to claim 1 is characterized in that: The slope body (2) of the first level slope protection at the top is not provided with a horse path (3) but is directly connected to the upper mountain body (9), and the intercepting ditch (4) extends along the connection between the top of the slope body (2) and the upper mountain body (9).

6. The slope structure suitable for installation of a booster station for a new energy project according to claim 5 is characterized in that: The width of the horseway (3) is 3m, and the cross-sectional dimensions of the intercepting ditch (4) are 400mm x 400mm.

7. The slope structure suitable for installation of a booster station for a new energy project according to claim 1 is characterized in that: The foot of the retaining wall (5) is buried in the mountain (9) below, and the top of the wall is set not lower than the horizontal foundation (6).

8. The slope structure suitable for installation of a booster station for a new energy project according to claim 1, 2 or 7, characterized in that: The footing wall (1) and the end of the retaining wall (5) are connected end to end to form an annular mortar-stone structure surrounding the horizontal foundation (6).

9. The slope structure suitable for installation of a booster station for a new energy project according to claim 8 is characterized in that: The horizontal foundation (6) is located in a foundation trench dug in the annular mortar-stone structure, and a concrete layer (7) and a crushed stone layer (8) are laid from bottom to top in the foundation trench, and the surface of the crushed stone layer (8) is flush with the top of the annular mortar-stone structure.

10. The slope structure suitable for installation of a booster station for a new energy project according to claim 1, characterized in that: The intercepting ditch (4) extends along the inner edge of the bridleway (3) to the vicinity of both ends of the multi-level slope protection, and drainage ditches (10) are arranged at both end edges of the slope protection and run down along the mountain (9), and each of the intercepting ditches (4) is connected to the drainage ditch (10) respectively.