Impact-rotary excavating combined pore-forming cast-in-place pile construction system

Through the impact-rotating excavation combination, the construction system of the hole-filled piles is used to use technologies such as steel casing guide frames, positioning pipe piles and lower mud boxes to solve the accuracy and efficiency of the drilling hole-filled pile construction under complex geological conditions, and improve the Pile foundation bearing capacity and construction quality.

CN222100819UActive Publication Date: 2024-12-03HUBEI ROAD & BRIDGE GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420748960.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2024-12-03
Estimated Expiration
2034-04-12

AI Technical Summary

Technical Problem

Under complex geological conditions, the construction quality of drilled cast-injected piles is difficult to control, resulting in a decrease in the bearing capacity of the pile foundation, and there are accuracy and efficiency problems in hole-forming construction in underwater environments.

Method used

The impact-rotary excavation combination hole-filled pile construction system is adopted, including steel casing guide frame, winch, positioning pipe pile, lower mud box and flexible rope series ring. The sinking accuracy and welding efficiency are improved through the steel casing guide frame. , positioning pipe piles to reinforce the gravel pebbles, the lower mud box solves the problem of restricted construction sites, and the flexible rope controls the lowering accuracy of the probe.

Benefits of technology

The precision of sinking and welding of steel casing is improved, the quality and efficiency of pile foundation hole formation is enhanced, the accuracy of probe drop is ensured, the problem of mud box installation is solved, and the efficiency of steel cage installation and steel casing removal is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100819U_ABST
    Figure CN222100819U_ABST
Patent Text Reader

Abstract

The utility model relates to an impact-rotary excavating combined pore-forming cast-in-place pile construction system which comprises a construction platform, a steel casing, a steel casing guide frame and a winch, the steel casing guide frame is used for lowering the steel casing and comprises a first guide frame and a second guide frame, the first guide frame is arranged above the construction platform, and the second guide frame is arranged below the construction platform. The steel casing guide frame has the advantages that the steel casing guide frame is used as an adjustable support for sinking the reinforcement cage, so that the placement accuracy of the reinforcement cage is improved; the steel casing guide frame is adopted as a pulling guide bracket additionally arranged outside the steel casing, so that the pulling efficiency and precision of the steel casing are improved; the steel casing guide frame is suitable for sinking, lengthening and pulling out the steel casing and placing a reinforcement cage, and can be repeatedly used; the hanging type underneath slurry box is arranged, the hanging type underneath slurry box is installed on a bailey beam of a bridge in a hanging mode, and the problem that the slurry box is difficult to place under the working condition that a construction site is limited is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of cast-in-place pile construction, in particular to an impact-rotary drilling combined hole-forming cast-in-place pile construction system. Background Art

[0002] Bored cast-in-place pile group foundations are widely used in the construction of highways, railways and bridges across rivers, lakes and other water bodies. In view of the complex and diverse geological conditions, bored cast-in-place piles are extremely difficult to control in terms of quality due to their large pile diameters, deep penetration into the soil, and the completion of hole construction in complex environments such as underground and underwater. Complex geological conditions or incorrect construction operations may affect the quality of pile foundation construction and cause a decrease in pile foundation bearing capacity.

[0003] Based on this, there is an urgent need for a bored pile construction system that aims to improve the construction quality and efficiency of bored piles under complex strata conditions, so that it can be applied to a wide range of strata, have good hole quality, and high pile foundation bearing capacity, and can be applied in actual projects to achieve better technical and economic benefits. Utility Model Content

[0004] The utility model aims to overcome the deficiencies in the prior art and provide an impact-rotary drilling combined hole-forming cast-in-place pile construction system.

[0005] The impact-rotary drilling combined bored pile construction system comprises a construction platform, a steel casing, a steel casing guide frame and a winch. The steel casing guide frame is used for lowering the steel casing and comprises a first guide frame and a second guide frame. The first guide frame is arranged above the construction platform, and the second guide frame is arranged below the construction platform.

[0006] Several sections of steel casings are spliced ​​vertically, and the bottom end of the lowest steel casing is inserted into the riverbed. The winch is used to lower the probe into the steel casing. After a hole is formed in the steel casing, a steel cage is placed under the first guide frame. After the steel casing is poured, a sealing cover is provided on the top, and an air inlet and an air outlet are opened on the upper part of the sealing cover.

[0007] Preferably, bolt holes are reserved in the bottom cross beams of the first guide frame and the second guide frame; the second guide frame is a bottom-hanging water surface limiting guide frame, and a vertical suspension rod is fixed in the reserved bolt hole of the second guide frame, and the top of the vertical suspension rod is fixed to the bottom cross beam of the first guide frame with high-strength bolts.

[0008] Preferably, the guide frame of the steel casing guide frame is welded from double-jointed I-beams, and jacks, steel rollers and arc supports are respectively arranged on the inner sides of the four corners of the guide frame; a hanging corbel is arranged on the top of the steel casing.

[0009] Preferably, positioning pipe piles are driven into the riverbed to control the accuracy of steel casing sinking, and mountain limiting I-beams are driven on the water side of the mountain to prevent the mountain from sliding and squeezing the steel casing; the positioning pipe piles are driven below the inclined rock surface at the bottom of the riverbed, and the positioning pipe piles surround the outside of the steel casing.

[0010] Preferably, when the stratum is a gravel and pebble stratum, a grouting pipe is sunk inside the steel casing to consolidate and harden the gravel and pebble stratum.

[0011] Preferably, when a hole is formed in the steel casing, a lower mud box is also connected, and the upper part of the lower mud box is suspended to the lower part of the Bailey beam of the bridge through a vertical hanger, and the upper and lower parts of the vertical hanger are fixed with high-strength bolts; the steel pipe piles of the bridge are provided with corbels, and the corbels are rested with steel beams, and the bottom of the lower mud box is supported by the steel beams resting on the steel pipe pile corbels; the upper part of the Bailey beam is provided with a distribution beam and a bridge deck in sequence.

[0012] Preferably, a serial ring is provided on the top of the probe, and the edge of the serial ring fits the inner wall of the steel casing to control the verticality of the probe; the serial ring includes a circular ring and radial supports, and a flexible rope serial port is provided at the intersection of the radial supports, a flexible rope is passed through the flexible rope serial port, and the probe is hung at the bottom end of the flexible rope.

[0013] The beneficial effects of the utility model are:

[0014] 1) The utility model is provided with a steel casing guide frame for sinking the steel casing. The adjustable standardized guide frame is installed on the underwater steel casing, which improves the sinking accuracy of the steel casing. The steel casing extension guide operation platform is adopted to improve the welding accuracy and efficiency of the steel casing.

[0015] 2) The utility model adds positioning pipe piles outside the steel casing to ensure the sinking accuracy of the steel casing on the steep inclined rock surface; and mountain limiting I-beams are installed on the water side of the mountain to prevent the mountain from sliding and squeezing the steel casing; the utility model reinforces the gravel and pebble strata, and improves the quality and efficiency of pile foundation drilling.

[0016] 3) The utility model is provided with a hanging lower mud box, which is hung and installed on the Bailey beam of the bridge, solving the problem of placing the mud box under the condition of limited construction site.

[0017] 4) The utility model utilizes a flexible rope to connect the ring probe in series, and sets a connecting ring to ensure the lowering accuracy of the probe.

[0018] 5) The utility model adopts a steel casing guide frame as an adjustable bracket for sinking the steel cage, which improves the placement accuracy of the steel cage; adopts a steel casing guide frame as an additional removal guide bracket outside the steel casing, which improves the efficiency and accuracy of steel casing removal; the steel casing guide frame is suitable for sinking, extending, removing and placing steel cages, and can be used repeatedly. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of steel casing sinking;

[0020] Figure 2 yes Figure 1 Middle AA section;

[0021] Figure 3 yes Figure 1 Middle BB section;

[0022] Figure 4 This is a schematic diagram of steel casing extension;

[0023] Figure 5 yes Figure 4 Middle CC section;

[0024] Figure 6 It is a schematic diagram of the steel casing construction on the steep rock surface of the riverbed;

[0025] Figure 7 It is a schematic diagram of the consolidation of gravel and pebble strata;

[0026] Figure 8 It is a schematic diagram of a suspended bottom-mounted mud box;

[0027] Fig. 9 It is a schematic diagram of ultrasonic drilling detection;

[0028] Fig.10 It is a schematic diagram of the serial ring structure;

[0029] Fig.11 This is a schematic diagram of the steel cage sinking;

[0030] Fig.12 yes Fig.11 Middle DD section;

[0031] Fig.13 This is a schematic diagram of steel casing removal by gas cap-vibration hammer;

[0032] Fig.14 yes Fig.13 Middle EE section view.

[0033] In the figure: 1-construction platform; 2-first guide frame; 3-steel casing; 4-corbel; 5-high-definition bolt; 6-second guide frame; 7-vertical hanger; 8-double-jointed I-beam; 9-jack; 10-arc support; 11-steel roller; 12-bolt hole; 13-extended steel casing; 14-lower steel casing; 15-positioning pipe pile; 16-inclined rock surface; 17-mountain; 18-mountain limit I-beam; 19-grouting pipe; 20-gravel and pebble stratum; 21-silty clay layer; 22-plain fill layer; 23-steel pipe piles; 24-distribution beam; 25-bridge deck; 26-Bailey beam; 27-undermounted mud box; 28-steel beam; 29-serial ring; 30-stiffening plate; 31-sealing cover; 32-winch; 33-flexible rope; 34-probe; 35-circular ring; 36-radial support; 37-flexible rope string hole; 38-steel cage; 39-compressed air machine; 40-air guide pipe; 41-vibration hammer; 42-air inlet; 43-air outlet. DETAILED DESCRIPTION

[0034] The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.

[0035] As an example, Figures 1 to 14 As shown, the impact-rotary drilling combined bored pile construction system comprises a construction platform 1, a steel casing 3, a steel casing guide frame and a winch 32. The steel casing guide frame is used for lowering the steel casing 3, and comprises a first guide frame 2 and a second guide frame 6. The first guide frame 2 is arranged above the construction platform 1, and the second guide frame 6 is arranged below the construction platform 1.

[0036] The bottom cross beams of the first guide frame 2 and the second guide frame 6 are both provided with bolt holes 12; the second guide frame 6 is a bottom-hanging water surface limiting guide frame, and a vertical suspension rod 7 is fixed in the reserved bolt hole 12 of the second guide frame 6, and the top of the vertical suspension rod 7 is fixed to the bottom cross beam of the first guide frame 2 with a high-strength bolt 5.

[0037] like Figure 2 As shown, the guide frame of the steel casing guide frame is welded by double-jointed I-beams 8, and jacks 9, steel rollers 11 and arc supports 10 are respectively arranged on the inner sides of the four corners of the guide frame; a hanging bracket 4 is arranged on the top of the steel casing 3.

[0038] Several sections of steel casing 3 are vertically spliced, and the bottom end of the lowest steel casing 3 is inserted into the riverbed. After a hole is formed in the steel casing 3, a steel cage 38 is placed under the first guide frame 2. After the steel casing 3 is poured, a sealing cover 31 is provided on the top, and an air inlet 42 and an air outlet 43 are opened on the upper part of the sealing cover 31.

[0039] like Figure 8 As shown, when a hole is formed in the steel casing 3, a lower mud box 27 is also connected. The upper part of the lower mud box 27 is suspended on the lower part of the Bailey beam 26 of the bridge through a vertical hanger 7, and the upper and lower parts of the vertical hanger 7 are fixed with high-strength bolts 5; a corbel 4 is provided on the steel pipe pile 23 of the bridge, and a steel beam 28 is placed on the corbel 4. The bottom of the lower mud box 27 is supported by the steel beam 28 placed on the corbel 4 of the steel pipe pile 23; a distribution beam 24 and a bridge deck 25 are provided in sequence on the upper part of the Bailey beam 26.

[0040] like Fig. 9 and Fig.10 As shown, the winch 32 is used to lower the probe 34 into the steel casing 3; a serial ring 29 is provided on the top of the probe 34, and the edge of the serial ring 29 fits the inner wall of the steel casing 3 to control the verticality of the probe 34; the serial ring 29 includes a circular ring 35 and a radial support 36, and a flexible rope serial port 37 is provided at the intersection of the radial support 36, and a flexible rope 33 is passed through the flexible rope serial port 37, and the probe 34 is hung at the bottom end of the flexible rope 33.

[0041] Embodiment 2

[0042] As another embodiment, this embodiment 2 proposes a more specific impact-rotary drilling combined hole-forming cast-in-place pile construction system based on the embodiment 1.

[0043] like Figure 6 As shown, positioning pipe piles 15 are inserted into the riverbed to control the sinking accuracy of the steel casing 3, and mountain limiting I-beams 18 are installed on the water side of the mountain 17 to prevent the mountain from sliding and squeezing the steel casing 3; the positioning pipe piles 15 are inserted below the inclined rock surface 16 at the bottom of the riverbed, and the positioning pipe piles 15 surround the outside of the steel casing 3.

[0044] like Figure 7 As shown, when the stratum is a gravel and pebble stratum 20 , a grouting pipe 19 is sunk inside the steel casing 3 to consolidate and harden the gravel and pebble stratum 20 .

Claims

1. An impact-rotary drilling combined hole-forming cast-in-place pile construction system, characterized in that: It includes a construction platform, a steel casing, a steel casing guide frame and a winch. The steel casing guide frame is used for lowering the steel casing, and includes a first guide frame and a second guide frame. The first guide frame is arranged above the construction platform, and the second guide frame is arranged below the construction platform. Several sections of steel casings are spliced ​​vertically, and the bottom end of the lowest steel casing is inserted into the riverbed. The winch is used to lower the probe into the steel casing. After a hole is formed in the steel casing, a steel cage is placed under the first guide frame. After the steel casing is poured, a sealing cover is provided on the top, and an air inlet and an air outlet are opened on the upper part of the sealing cover.

2. The impact-rotary drilling combined hole-forming cast-in-place pile construction system according to claim 1 is characterized in that: The bottom cross beams of the first guide frame and the second guide frame are both reserved with bolt holes; the second guide frame is a bottom-hanging water surface limiting guide frame, and a vertical suspension rod is fixed in the reserved bolt hole of the second guide frame, and the top of the vertical suspension rod is fixed to the bottom cross beam of the first guide frame with high-strength bolts.

3. The impact-rotary drilling combined hole-forming cast-in-place pile construction system according to claim 1 is characterized in that: The guide frame of the steel casing guide frame is welded from double-jointed I-beams, and jacks, steel rollers and arc supports are respectively arranged on the inner sides of the four corners of the guide frame; a hanging corbel is arranged on the top of the steel casing.

4. The impact-rotary drilling combined hole-forming cast-in-place pile construction system according to claim 1 is characterized in that: Positioning pipe piles are inserted into the riverbed to control the accuracy of steel casing sinking. Mountain limiting I-beams are installed on the water side of the mountain to prevent the mountain from sliding and squeezing the steel casing. The positioning pipe piles are inserted below the inclined rock surface at the bottom of the riverbed, and the positioning pipe piles surround the outside of the steel casing.

5. The impact-rotary drilling combined hole-forming cast-in-place pile construction system according to claim 1 is characterized in that: When the stratum is a gravel and pebble stratum, a grouting pipe is sunk inside the steel casing to consolidate and harden the gravel and pebble stratum.

6. The impact-rotary drilling combined hole-forming cast-in-place pile construction system according to claim 1 is characterized in that: When a hole is formed in the steel casing, a lower mud box is also connected. The upper part of the lower mud box is suspended on the lower part of the Bailey beam of the bridge through a vertical hanger, and the upper and lower parts of the vertical hanger are fixed with high-strength bolts; a corbel is provided on the steel pipe piles of the bridge, and a steel beam is placed on the corbel. The bottom of the lower mud box is supported by a steel beam placed on the corbel of the steel pipe pile; a distribution beam and a bridge deck are provided in sequence on the upper part of the Bailey beam.

7. The impact-rotary drilling combined hole-forming cast-in-place pile construction system according to claim 1 is characterized in that: A serial connection ring is arranged on the top of the probe, and the edge of the serial connection ring fits the inner wall of the steel casing to control the verticality of the probe; the serial connection ring includes a circular ring and radial supports, and a flexible rope serial port is arranged at the intersection of the radial supports, a flexible rope is passed through the flexible rope serial port, and the probe is hung at the bottom end of the flexible rope.