Pile plate type mounting structure of brim type pile splicing steel pipe
Through the pile plate-type installation structure of the brim-type pile-connected steel pipe, the welding fixing structure of the pile cap and stiffened steel plate and the steel cage in the prefabricated piles, the problem of slow turnover speed of temporary steel hoops and temporary steel beams is solved, achieving more efficient bridge erection and construction progress.
Patent Information
- Application Number
- CN202420550949.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Priority Date
- 2023-08-17
- Filing Date
- 2024-03-21
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2034-03-21
AI Technical Summary
In the construction of assembled bridges, the turnover speed of temporary steel hoops and temporary steel beams is too slow and the turnover is small, which cannot effectively save materials and speed up construction progress.
The pile plate-type installation structure adopts a brim-type pile-connected steel pipe, including prefabricated piles and pile caps. The pile cap is composed of end columns, brim boards, reinforced ribs and stiffened steel plates. It forms a fixed structure through welding to improve the load-bearing capacity, and prefabricated piles. A reinforced cage is installed in the middle to enhance stability and strength.
Through the fixed connection of the brim pile cap and the welding of stiffened steel plates, the load-bearing capacity and construction efficiency are improved, and the erection speed and construction progress of prefabricated plate bridges are significantly accelerated.
Smart Images

Figure CN222100826U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a pile-plate type installation structure of a brim type pile-connected steel pipe. Background Art
[0002] During the construction of assembled bridges, prefabricated pipe piles can be used as the lower structure to directly bear the load of the upper beam. When the lower structure (prefabricated pipe piles) is completed, the next step is to set up the working platform, install temporary steel hoops and temporary steel beams, and then erect the beams and slabs, cast the middle beams and wet joints.
[0003] In the existing prefabricated bridge construction, after the construction of the lower structure (prefabricated pipe piles) is completed, it is necessary to set up a working platform for the next step. After installing temporary steel hoops and temporary steel beams, the beam slab is erected, and the middle beam and wet joint are cast. This method requires the construction of a working platform, and the turnover rate of temporary steel hoops and temporary steel beams is too slow, and the turnover rate is small, generally twenty times, which cannot achieve the purpose of saving materials and speeding up the construction progress. For this reason, a pile-plate installation structure of a brim-type pile-connected steel pipe is proposed. Utility Model Content
[0004] The utility model aims to solve the problems of slow turnover and few turnover times of temporary steel clamps and temporary steel beams in the prior art, and proposes a pile-plate type installation structure of a brim type pile-connected steel pipe.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A pile-plate installation structure for a brim-type pile-connected steel pipe comprises a prefabricated pile and a pile cap, wherein the pile cap is arranged on the top of the prefabricated pile, the pile cap comprises an end column and a brim plate, the end column and the brim plate are an integrated connection structure, first reinforcing ribs are arranged at the four corners of the bottom of the brim plate, second reinforcing ribs are symmetrically arranged on the top of the end column, and a stiffening steel plate is arranged on the inner wall of the end column.
[0007] Preferably, the pile cap is connected to the top end plate of the precast pile, and a limiting structure is formed between the stiffening steel plate and the precast pile.
[0008] Preferably, the stiffening steel plates are provided in four groups and are evenly distributed on the inner wall of the end column in a centrally symmetrical manner, and the stiffening steel plates are welded and fixed to the inner wall of the end column to form fillet welds.
[0009] Preferably, the first reinforcing rib and the second reinforcing rib are both connected to the lower edge of the pile cap by welding, a fillet weld is formed between the first reinforcing rib and the pile cap, and a fillet weld is formed between the second reinforcing rib and the pile cap.
[0010] Preferably, a steel cage is provided inside the precast pile, and the steel cage is cast and fixed on the inner wall of the precast pile.
[0011] Preferably, prefabricated beams and slabs are arranged between the prefabricated piles, the prefabricated beams and slabs are connected by wet joints, and the prefabricated beams and slabs and the wet joints constitute a guardrail structure.
[0012] Compared with the prior art, the utility model provides a pile-plate type installation structure of a brim type pile-connected steel pipe, which has the following beneficial effects:
[0013] 1. The brim type pile cap is fixedly connected with the precast pile. The inside of the pile cap is welded with the end plate of the precast pile by full weld fillet weld to form a fixed structure, and the precast pile is welded with a stiffening steel plate to improve the bearing capacity of the brim type pile cap. The brim type pile cap can bear the pressure of the upper precast beam plate, and the beam can be erected normally to improve the construction efficiency;
[0014] 2. By setting a steel cage structure in the precast pile, the stability and strength of the precast pile after forming are effectively improved. The brim-type pile cap structure is set on the end plate of the precast pile to effectively improve the load-bearing effect, thereby speeding up the erection speed of the precast board bridge and improving the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the installation structure of a pile-plate type installation structure of a brim type pile-connected steel pipe of the utility model;
[0016] Figure 2 It is a schematic diagram of a pile cap structure of a pile plate type installation structure of a brim type pile-connected steel pipe of the utility model;
[0017] Figure 3 It is a schematic diagram of the top view of the pile cap structure of the pile plate type installation structure of the brim type pile-connected steel pipe of the utility model;
[0018] Figure 4 The utility model is a pile plate type installation structure of a hat-shaped pile steel pipe Figure 3 Schematic diagram of the middle AA section;
[0019] Figure 5 The utility model is a pile plate type installation structure of a hat-shaped pile steel pipe Figure 3 Schematic diagram of the middle BB section;
[0020] Figure 6 It is a schematic diagram of the beam-slab erection structure of a pile-slab installation structure of a hat-shaped pile-connected steel pipe of the utility model;
[0021] Figure 7 It is a schematic diagram of the wet joint structure of a pile-plate type installation structure of a brim type pile-connected steel pipe of the utility model.
[0022] In the figure:
[0023] 1. Precast piles; 2. Pile caps; 3. Steel cages; 4. End columns; 5. Eaves plates; 6. First reinforcing ribs; 7. Second reinforcing ribs; 8. Fillet welds; 9. Reinforcing steel plates; 10. Precast beams and slabs; 11. Wet joints. DETAILED DESCRIPTION
[0024] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0025] Reference Figure 1-7 A pile-plate installation structure of a brim-type pile-connected steel pipe comprises a prefabricated pile 1 and a pile cap 2. The pile cap 2 is arranged on the top of the prefabricated pile 1. The pile cap 2 comprises an end column 4 and a brim plate 5. The end column 4 and the brim plate 5 are an integrated connection structure. The first reinforcing ribs 6 are arranged at the four corners of the bottom of the brim plate 5. The second reinforcing ribs 7 are symmetrically arranged on the top of the end column 4. The inner wall of the end column 4 is provided with a stiffening steel plate 9. There are four groups of stiffening steel plates 9, which are evenly distributed on the inner wall of the end column 4 in a centrally symmetrical manner, and the stiffening steel plates 9 are welded and fixed to the inner wall of the end column 4 to form a fillet weld 8.
[0026] In this embodiment, the precast pile 1 is first constructed and installed (the plane center error is ≤1.5cm), the pile cap 2 is installed at the end plate position of the continuous precast pile 1, and then the pipe wall of the pile cap 2 is welded to the end plate of the precast pile 1, and the continuous pier core filling steel bars and prestressed steel bars are fixed, and the continuous pier pipe pile core filling concrete and the transverse wet joint 11 concrete between the precast beam slab 10 are cast in a hanging mold. After the core filling concrete and the transverse wet joint 11 concrete reach the preset strength, the pier top pile slab is tensioned to connect the prestress, and the UHPC ultra-high performance concrete is poured, and the brim pile The cap 2 is fixedly connected to the precast pile 1. The interior of the pile cap 2 is welded to the end plate of the precast pile 1 by a full-welded fillet weld 8 to form a fixed structure, and a stiffening steel plate 9 is welded to the precast pile 1 to improve the bearing capacity of the brim type pile cap 2. The brim type pile cap 2 can bear the pressure of the upper precast beam slab 10. Four groups of first reinforcing ribs 6 are welded to the inside of the steel pipe to improve the bearing capacity. In actual applications, the arrangement mode and quantity of the second reinforcing ribs 7 and the stiffening steel plates 9 can also be changed according to actual needs, and no specific limitation is made here.
[0027] Reference Figure 2-Figure 5On the basis of the above embodiment, the pile cap 2 is connected to the top end plate of the precast pile 1, and a limiting structure is formed between the stiffening steel plate 9 and the precast pile 1. The pile cap 2 and the precast pile 1 are installed by setting them. The brim type pile cap 2 as a supporting structure can rely on the structure of the end column 4 to bear the upper precast beam plate 10 to achieve the normal beam erection construction effect and effectively improve the construction efficiency. The structural installation between the stiffening steel plate 9 and the precast pile 1 further improves the firmness of the pile cap 2 and improves the practicality of the device.
[0028] Reference Figure 3 There are four groups of stiffening steel plates 9 which are evenly distributed on the inner wall of the end column 4 in a centrally symmetrical manner, and the stiffening steel plates 9 are welded and fixed to the inner wall of the end column 4 to form a fillet weld 8. Four M4 reinforcing ribs are welded to the inside of the steel pipe to effectively improve the bearing effect inside the installation structure.
[0029] Reference Figure 3-Figure 5 The first reinforcing rib 6 and the second reinforcing rib 7 are both connected to the lower edge of the pile cap 2 by welding. A fillet weld 8 is formed between the first reinforcing rib 6 and the pile cap 2, and a fillet weld 8 is formed between the second reinforcing rib 7 and the pile cap 2. The inside of the outer sleeve steel pipe is welded to the end plate of the prefabricated pile 1 with a full weld fillet weld 8, which effectively improves the bearing capacity of the installation structure.
[0030] Reference Figure 1 A steel cage 3 is arranged inside the precast pile 1, and the steel cage 3 is cast and fixed on the inner wall of the precast pile 1. The steel cage 3 structure is arranged in the precast pile 1, which effectively improves the stability and strength of the precast pile 1 after forming.
[0031] Reference Figure 6-Figure 7 Precast beams and slabs 10 are arranged between the precast piles 1, and the precast beams and slabs 10 are connected by wet joints 11. The precast beams and slabs 10 and the wet joints 11 constitute a guardrail structure. By calculating the load borne by the upper part of the precast pile 1, a "brim" type pile cap 2 is made. The upper precast beams and slabs 10 can be borne only by the structure at the installation place of the pile cap 2, and normal beam erection can be carried out, which greatly improves the construction efficiency.
[0032] Working principle: First, the precast pile 1 is constructed and installed (the plane center error is ≤1.5cm), and the pile cap 2 is installed at the end plate position of the continuous precast pile 1. Then, the pipe wall of the pile cap 2 is welded to the end plate of the precast pile 1, and the continuous pier core filling steel bars and prestressed steel bars are fixed. The continuous pier pipe pile core filling concrete and the transverse wet joint 11 concrete between the precast beam slab 10 are cast in a hanging formwork. After the core filling concrete and the transverse wet joint 11 concrete reach the preset strength, the pier top pile slab connection prestressing is tensioned, and UHPC ultra-high performance concrete is poured. The brim type pile cap 2 is fixedly connected to the precast pile 1. The inside of the pile cap 2 is welded to the end plate of the precast pile 1 with a full weld fillet weld 8 to form a fixed structure, and a stiffening steel plate 9 is used to weld to the precast pile 1 to improve the bearing capacity of the brim type pile cap 2. The brim type pile cap 2 can rely on the pressure of the upper precast beam slab 10. Four groups of first reinforcing ribs 6 are welded to the inside of the steel pipe to improve the bearing capacity.
[0033] The pile cap 2 is set and connected to the top end plate of the precast pile 1, and a limiting structure is formed between the stiffening steel plate 9 and the precast pile 1. The pile cap 2 and the precast pile 1 are installed. The brim type pile cap 2 as a supporting structure can rely on the structure at the end column 4 to bear the upper precast beam slab 10, so as to achieve the normal beam erection construction effect and effectively improve the construction efficiency. The structural installation between the stiffening steel plate 9 and the precast pile 1 further improves the firmness of the pile cap 2 and the practicality of the device. The precast beam slabs 10 are connected by wet joints 11, and the precast beam slabs 10 and the wet joints 11 form a guardrail structure. The "brim" type pile cap 2 is made by calculating the load-bearing force on the upper part of the precast pile 1. The upper precast beam slab 10 can be borne by the structure at the installation position of the pile cap 2 alone, and normal beam erection can be carried out, greatly improving the construction efficiency.
[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
[0035] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0036] Although the embodiments of the present invention have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations of the present invention. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A pile-plate installation structure for a cap-shaped pile-connected steel pipe, comprising a prefabricated pile (1) and a pile cap (2), It is characterized in that A pile cap (2) is arranged on the top of the prefabricated pile (1), and the pile cap (2) comprises an end column (4) and a brim plate (5), the end column (4) and the brim plate (5) are an integrally connected structure, first reinforcing ribs (6) are arranged at the four corners of the bottom of the brim plate (5), second reinforcing ribs (7) are symmetrically arranged on the top of the end column (4), and a reinforcing steel plate (9) is arranged on the inner wall of the end column (4).
2. A pile-plate type installation structure for a brim-type pile-connected steel pipe according to claim 1, It is characterized in that The pile cap (2) is sleeve-connected to the top end plate of the prefabricated pile (1), and a limiting structure is formed between the stiffening steel plate (9) and the prefabricated pile (1).
3. A pile-plate type installation structure for a brim type pile-connected steel pipe according to claim 2, It is characterized in that The reinforcing steel plates (9) are provided in four groups and are evenly distributed on the inner wall of the end column (4) in a centrally symmetrical manner. The reinforcing steel plates (9) are welded and fixed to the inner wall of the end column (4) to form a fillet weld (8).
4. The pile-plate type installation structure of the brim type pile-connected steel pipe according to claim 1, It is characterized in that The first reinforcing rib (6) and the second reinforcing rib (7) are both connected to the lower edge of the pile cap (2) by welding, a fillet weld (8) is formed between the first reinforcing rib (6) and the pile cap (2), and a fillet weld (8) is formed between the second reinforcing rib (7) and the pile cap (2).
5. The pile-plate type installation structure of the brim type pile-connected steel pipe according to claim 1, It is characterized in that A steel cage (3) is arranged inside the precast pile (1), and the steel cage (3) is cast and fixed on the inner wall of the precast pile (1).
6. The pile-plate type installation structure of the brim type pile-connected steel pipe according to claim 1, It is characterized in that Prefabricated beams and slabs (10) are arranged between the prefabricated piles (1), the prefabricated beams and slabs (10) are connected by wet joints (11), and the prefabricated beams and slabs (10) and the wet joints (11) form a guardrail structure.
Citation Information
Cited By
Pile cap of prefabricated tubular pile with pile-slab structure for expressway
CN116876471A
