Electric vibration dredging hammer for ore dressing raw ore bin
By designing an electric vibration dredging hammer for ore dressing, using impact steel balls or shovel heads to clear the electric vibration funnel under the drive of the electric vibration funnel, the production instability caused by the blockage of the electric vibration funnel is solved, and the dredging time is significantly reduced. The amount of labor improves energy utilization and production efficiency.
Patent Information
- Application Number
- CN202420594234.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-12-10
- Estimated Expiration
- 2034-03-26
AI Technical Summary
The blockage of the electric vibration funnel of the central ore warehouse in the ore production system leads to unstable operation of the crushing system, resulting in insufficient supply of raw ore, affecting the full load operation and energy utilization of subsequent ore systems. The existing dredging methods take a long time, have a high labor intensity and are not efficient enough.
An electric vibration dredging hammer of ore dressing bin including a detachable impact assembly is designed, connected to the casing through a pipe body, equipped with an impact steel ball or shovel head, and the impact steel ball or shovel head is used to impact the blocking ore layer under the drive of an electric actuator. , clean up blockages in the funnel and improve dredging efficiency.
It significantly reduces the time and labor amount of the electric vibration funnel, improves the stability and energy utilization of the crushing system, ensures full load production and reduces safety hazards.
Smart Images

Figure CN222132155U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of mechanical tools and relates to an electric vibration dredging hammer for a raw ore bin of a beneficiation mine. Background Art
[0002] The crushing system is an indispensable link in the mineral processing production system and is also the first step of the procedure. Whether the crushing system runs smoothly directly affects the flow of ore in the upstream mine and the raw material problem of the downstream smelter. Therefore, the stable operation of the crushing system is very important. The electric vibration ore discharge from the raw ore bin is the first step of the crushing system in this workshop. If the electric vibration funnel is blocked, it will lead to insufficient supply of raw ore, the subsequent mineral processing system will not be able to operate at full load, the annual production task cannot be completed, and the energy utilization rate will also be reduced, which is not conducive to reducing costs and increasing efficiency.
[0003] In order to ensure the long-term safe and stable operation of the crushing system, the key is to solve the blockage problem of the electric vibration funnel in the raw ore bin. The blockage of the electric vibration is a common fault of the workshop crushing system. The employees on duty used to use threaded steel to dredge the electric vibration. The field of vision inside the funnel was poor. The location of the funnel blockage could not be observed during the dredging process. They could only rely on experience to operate. The processing time was long and the workload was large. However, the funnel dredging effect was not satisfactory. It often took several hours to dredge the funnel successfully. Occasionally, engineering machinery was needed to dredge the electric vibration funnel. This process consumed a lot of manpower, material resources and financial resources. Utility Model Content
[0004] The utility model aims to provide an electric vibration dredging hammer for ore dressing ore bin in view of the problems existing in the prior art, which solves the problems of high difficulty, long time consumption and high labor intensity of personnel in the existing electric vibration hopper dredging.
[0005] To this end, the utility model adopts the following technical solutions:
[0006] An electric vibration dredging hammer for a mineral processing ore bin comprises a tube body, one end of the tube body is provided with a detachable impact assembly, the other end is provided with a sleeve, the tube body and the sleeve are connected through a first iron plate, the outer wall of the tube body is symmetrically provided with a plurality of second iron plates, the second iron plates are provided with safety rope hanging holes, and the outer wall of the sleeve is symmetrically provided with a plurality of rings.
[0007] Furthermore, the impact component adopts one of an impact steel ball or a shovel head.
[0008] Furthermore, the second iron plate is triangular in shape.
[0009] Furthermore, the first iron plate is circular.
[0010] The beneficial effects of the utility model are:
[0011] The utility model can effectively solve the blockage of ore blocks in the electric vibration funnel, significantly reduce the workload of post personnel, greatly reduce the time consumed in dredging the funnel, reduce the potential safety hazards in the operation process, is conducive to the full load production of the ore crushing system, reduces energy consumption, and creates good conditions for completing the annual production task. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the structure of installing an impact steel ball in the middle tube body of the utility model;
[0013] Figure 2 This is a schematic diagram of the structure of the shovel head installed in the pipe body of the utility model.
[0014] In the figure, 1-impact steel ball, 2-tube body, 3-safety rope hanging hole, 4-second iron plate, 5-first iron plate, 6-ring, 7-casing, 8-shovel head. DETAILED DESCRIPTION
[0015] The technical solution of the utility model is described below in conjunction with the accompanying drawings and implementation methods.
[0016] An electric vibration dredging hammer for a mineral processing ore bin comprises a pipe body 2. The pipe body 2 can be a round pipe of different lengths and models to dredge the blockage layer of the electric vibration funnel of different thicknesses. A detachable impact assembly is provided at one end of the pipe body 2, and a sleeve 7 is provided at the other end. The pipe body 2 and the sleeve 7 are connected by a first iron plate 5. The first iron plate 5 is circular. A plurality of second iron plates 4 are symmetrically provided on the outer wall of the pipe body 2. The second iron plates 4 are triangular. Both the first iron plates 5 and the second iron plates 4 are used to strengthen the rigidity of the pipe body 2.
[0017] In addition, the second iron plate 4 is provided with a safety rope hanging hole 3, which is used to hang a safety rope to prevent the dredging hammer from falling during operation. The outer wall of the sleeve 7 is symmetrically provided with a plurality of rings 6.
[0018] Depending on the type of blockage, the impact component uses one of the impact steel balls 1 or the shovel head 8; Figure 1 As shown, the impact steel ball 1 has a smooth surface, a large impact force, a long service life, is not easy to be damaged, and has a high efficiency in clearing the funnel. Figure 2 As shown, the shovel head 8 is responsible for clearing the compacted ore at the edge of the funnel. The efficiency of the shovel head 8 in processing the compacted ore is much greater than that of the impact steel ball 1.
[0019] During use of the utility model, the electric pick is connected to the dredging hammer through the sleeve 7 and the ring 6, the second iron plate 4 and the first iron plate 5 are used to strengthen the rigidity of the pipe body 2, the safety rope hanging hole 3 is used to hang the safety rope, the impact steel ball 1 is connected to the pipe body 2, and the blocked ore layer is impacted under the drive of the electric actuator to achieve the purpose of dredging the electric vibration funnel; optionally, a shovel head 8 can also be installed at the end of the pipe body 2, and the shovel head 8 is used to clean the compacted mineral powder around the funnel, and the operation method is similar to that of the impact steel ball.
Claims
1. An electric vibration dredging hammer for ore dressing ore bin, characterized in that: The invention comprises a tube body (2), one end of the tube body (2) is provided with a detachable impact assembly, the other end of the tube body (2) is provided with a sleeve (7), the tube body (2) and the sleeve (7) are connected via a first iron plate (5), the outer wall of the tube body (2) is symmetrically provided with a plurality of second iron plates (4), the second iron plates (4) are provided with safety rope hanging holes (3), and the outer wall of the sleeve (7) is symmetrically provided with a plurality of rings (6).
2. The electric vibration dredging hammer for ore dressing ore bin according to claim 1 is characterized in that: The impact component adopts one of an impact steel ball (1) or a shovel head (8).
3. The electric vibration dredging hammer for ore dressing ore bin according to claim 1 is characterized in that: The second iron plate (4) is triangular in shape.
4. The electric vibration dredging hammer for ore dressing ore bin according to claim 1 is characterized in that: The first iron plate (5) is circular.
