Multipurpose smokeless boiler

By setting up metal hoses and multi-stage backhaul structures in the boiler body, the problems of single boiler function and single fuel selection are solved, and heating and hot water supply for multi-purpose smokeless boilers are realized, which improves fuel utilization and applicability. And reduce environmental pollution.

CN222165145UActive Publication Date: 2024-12-13LINSHU COUNTY HENGTAI THERMAL ENERGY TECHNOLOGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420727119.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-10
Publication Date
2024-12-13
Estimated Expiration
2034-04-10

AI Technical Summary

Technical Problem

The existing boiler has a single function, cannot provide heating and hot water at the same time, and the fuel selection is single, so the applicability is poor.

Method used

Metal hoses are installed in the boiler furnace and connected to the combustion machine or biomass feeder to realize a multi-purpose smokeless boiler, and heat conversion is carried out through a multi-stage backhaul structure to improve fuel utilization and diversity in fuel selection.

Benefits of technology

It realizes simultaneous heating and hot water supply of boilers, improves fuel thermal energy utilization and applicability, and reduces environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222165145U_ABST
    Figure CN222165145U_ABST
Patent Text Reader

Abstract

The utility model discloses a multipurpose smokeless boiler, and belongs to the field of boilers. A cavity is formed in a furnace body; the inner furnace is arranged in the cavity; the return stroke structure is arranged on one side of the inner furnace, and one end is connected with the inner furnace; the metal hose is arranged in the cavity and is adjacent to the inner furnace and / or the return stroke structure; the cavity and the metal hose are filled with flowing water. The metal hose used for supplying hot water is laid in the boiler, the metal hose and heating water can be heated at the same time in the operation process of the boiler, heating and water supplying can be carried out synchronously, the functionality of the boiler is improved, and the use efficiency of fuel is also improved; and meanwhile, the boiler can be connected with a combustion engine or a biomass lifting machine, so that the boiler can select different fuels according to different use requirements, and the applicability of the boiler is effectively improved. The utility model is mainly used for hot water supply and heat supply under different installation environments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of boilers, and in particular relates to a multi-purpose smokeless boiler. Background Art

[0002] Boilers are essential devices in industrial production or daily life. They can convert the chemical energy or electrical energy of fuel into steam, high-temperature water or organic heat carriers with a certain amount of thermal energy, providing the required thermal energy for industrial production or residents' lives. They can also be converted into mechanical energy through steam power devices, or mechanical energy can be converted into electrical energy through generators. Among them, existing boilers can only be used for water supply or heating, resulting in a relatively single function and inability to effectively utilize the thermal energy generated by the fuel. At the same time, the fuels used by existing boilers are also relatively single, and it is impossible to make diversified choices according to needs, resulting in poor applicability of existing boilers. Utility Model Content

[0003] The technical problem to be solved by the utility model is: to overcome the shortcomings of the prior art and provide a multi-purpose smokeless boiler, which realizes the method of adding a metal hose in the furnace body so that the boiler can simultaneously provide heating and hot water, thereby improving the utilization rate of the thermal energy generated by the fuel; and by connecting with a burner or a biomass lifting machine, the boiler fuel is diversified, thereby improving the applicability of the boiler.

[0004] The multi-purpose smokeless boiler includes a furnace body with a cavity inside; an inner furnace arranged in the cavity; a return structure arranged on one side of the inner furnace, one end of which is connected to the inner furnace; a metal hose arranged in the cavity, adjacent to the inner furnace and / or the return structure; wherein the cavity and the metal hose are filled with flowing water.

[0005] Preferably, the inner furnace includes a first combustion chamber, a second combustion chamber, and a ash cleaning chamber, wherein the interior of the first combustion chamber defines a combustion cavity; the second combustion chamber is arranged on one side of the first combustion chamber and is connected to the combustion cavity; the ash cleaning chamber is arranged on the side of the second combustion chamber away from the first combustion chamber and is connected to the second combustion chamber, wherein the first combustion chamber, the second combustion chamber, and the ash cleaning chamber are all connected to multiple side walls of the furnace body and communicate with the external space.

[0006] Preferably, a grate is provided between the first combustion chamber and the second combustion chamber.

[0007] Preferably, at least two tempering tubes are provided on the outer side wall between the second combustion chamber and the ash cleaning chamber, and one end of the tempering tube is connected to the second combustion chamber, and the other end is connected to the ash cleaning chamber.

[0008] Preferably, the return structure includes a first return section, a second return section, and a fire separation package. A first fire collection package is provided at one end of the first return section, and the first fire collection package is connected to the cleaning chamber; the second return section is arranged on one side of the first return section, and a second fire collection package is provided at one end; the fire separation package is connected to an end of the first return section away from the first fire collection package and an end of the second return section away from the second fire collection package.

[0009] Preferably, a cleaning pipe is provided on the outer wall of the first fire collection package and / or the second fire collection package, and one end of the cleaning pipe is connected to the inner wall of the first fire collection package and / or the second fire collection package, and the other end is connected to the outer wall of the furnace body.

[0010] Preferably, the furnace body further comprises a closed door, which is arranged on the outer side wall of the furnace body and is adapted to the first combustion chamber, the second combustion chamber and the ash cleaning chamber.

[0011] Preferably, a detachable flange connection seat is provided on the outer side wall of the furnace body.

[0012] Preferably, it also includes a burner, whose fire output end is adaptably connected to the flange connection seat.

[0013] Preferably, a biomass feeding device is further included, and the feeding port included in the biomass feeding device is adaptably connected to the flange connection seat.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. By arranging a metal hose in the cavity of the furnace body, the boiler can provide heating and hot water at the same time, which not only improves the functionality of the boiler, but also improves the utilization rate of the heat energy generated by the fuel.

[0016] 2. By connecting with the burner or biomass feeder, the boiler can select different fuels according to different usage environments, thereby meeting different usage requirements and improving the applicability of the boiler.

[0017] 3. The flame and high-temperature flue gas of the boiler are fully cooled during the heat conversion process in the return structure with multi-stage return, effectively reducing the pollution to the surrounding environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is the front view of the utility model;

[0019] Figure 2 It is a schematic diagram of the internal structure of the utility model;

[0020] Figure 3 It is a front view of the inner furnace and return structure of the utility model;

[0021] Figure 4 This is a front view of the inner furnace of the utility model;

[0022] Figure 5 It is a rear view of the inner furnace of the utility model;

[0023] Figure 6 It is a front view of the return structure of the utility model;

[0024] Figure 7 It is a rear view of the return structure of the utility model;

[0025] Figure 8 It is a schematic diagram of the assembly of the furnace body of the utility model;

[0026] Fig. 9 It is a schematic diagram of the assembly of the furnace body of the utility model;

[0027] Fig.10 This is a schematic diagram of the installation of the flange connection seat of the utility model.

[0028] In the figure, 100, furnace body; 110, closed door; 120, water outlet pipe for heating; 121, water return pipe for heating; 130, water inlet pipe for water supply; 131, water outlet pipe for water supply; 132, reserved mounting seat; 140, water level gauge; 150, top water inlet pipe for water supply; 151, top water outlet pipe for water supply; 160, closed door; 170, sewage outlet; 200, inner furnace; 210, first combustion chamber; 220, second combustion chamber; 230, ash cleaning chamber; 240, tempering pipe; 250, fire insulation layer; 260, grate; 300, return structure; 310, first return section; 311, first fire collection package; 320, fire tube; 330, fire distribution package; 340, second return section; 341, second fire collection package; 350, ash cleaning pipe; 351, closing cap; 400, metal hose; 500, flange connection seat. DETAILED DESCRIPTION

[0029] The utility model is further described below in conjunction with the accompanying drawings:

[0030] The directional nouns involved in the detailed description paragraphs are only for the convenience of those skilled in the art to understand the technical solutions described in this application according to the visual orientation shown in the accompanying drawings. Unless otherwise clearly specified and limited, the terms "setting", "installation", "connection", etc. should be understood in a broad sense. For ordinary technicians in this field, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0031] like Figures 1 to 5The multi-purpose smokeless boiler shown includes a furnace body 100 with a cavity inside; an inner furnace 200 is arranged in the cavity; a return structure 300 is arranged on one side of the inner furnace 200, and one end is connected to the inner furnace 200; a metal hose 400 is arranged in the cavity, adjacent to the inner furnace 200 and / or the return structure 300; wherein the cavity and the metal hose 400 are filled with flowing water.

[0032] Optionally, a plurality of support members are provided on the outer side walls of the inner furnace 200 and the return structure 300, and the support members are connected to the inner side walls of the furnace body 100. In this way, the inner furnace 200 and the return structure 300 can be suspended in the furnace body 100 through the support members, so that the inner furnace 200 and the return structure 300 are wrapped in the water in the cavity, thereby increasing the heat conversion area with the water and improving the heat conversion efficiency.

[0033] like Figures 2 to 5 As shown, the inner furnace includes a first combustion chamber 210, a second combustion chamber 220, and a ash cleaning chamber 230. The interior of the first combustion chamber 210 defines a combustion chamber; the second combustion chamber 220 is disposed on one side of the first combustion chamber 210 and communicates with the combustion chamber; the ash cleaning chamber 230 is disposed on a side of the second combustion chamber 220 away from the first combustion chamber 210 and communicates with the second combustion chamber 220, wherein the first combustion chamber 210, the second combustion chamber 220, and the ash cleaning chamber 230 are all connected to multiple side walls of the furnace body 100 and communicate with the external space. In this way, there are multiple communication channels between the first combustion chamber 210, the second combustion chamber 220, the ash cleaning chamber 230 and the furnace body 100, so that the boiler can select and enable appropriate communication channels according to the installation environment, effectively improving the applicability of the boiler.

[0034] Optionally, a fire insulation layer 250 is provided between the second combustion chamber 220 and the ash cleaning chamber 230. In this way, the second combustion chamber 220 and the ash cleaning chamber 230 can be isolated by the fire insulation layer 250, so that the ash cleaning chamber 230 is prevented from being disturbed by the heat generated during the fuel combustion process of the second combustion chamber 220, and the stability of the working state of the ash cleaning chamber 230 is improved, thereby ensuring that the boiler can operate stably.

[0035] Optionally, a support structure is provided between the second combustion chamber 220 and the ash cleaning chamber 230. In this way, the second combustion chamber 220 and the ash cleaning chamber 230 are spaced apart, and the space between the two can be filled with water in the cavity, thereby reducing the interference of the ash cleaning chamber 230 with the heat generated during the fuel combustion process of the second combustion chamber 220, while increasing the heat conversion contact area between the second combustion chamber 220 and the water, thereby improving the heating efficiency of the water.

[0036] Optionally, the thermal insulation material includes but is not limited to cement fire insulation board and fire insulation brick.

[0037] like Figure 2 and Figure 4 As shown, a grate 260 is provided between the first combustion chamber 210 and the second combustion chamber 220. In this way, the fuel can be stacked in the second combustion chamber 220 through the grate 260 for combustion, and the flame and high-temperature flue gas generated by the combustion of the fuel can enter the first combustion chamber 210 through the grate 260, effectively improving the utilization efficiency of the fuel.

[0038] Optionally, a tubular structure with a through cavity is provided inside the grate 260, and is arranged in an interval arrangement between the first combustion chamber 210 and the second combustion chamber 220. In this way, the water in the cavity can flow in the through cavity inside the grate 260, so that the indirect contact area between the fuel and the water is increased during the combustion process, thereby improving the thermal conversion efficiency of the fuel.

[0039] like Figure 4 and Figure 5 As shown, at least two tempering tubes 240 are provided on the outer wall between the first combustion chamber 210 and the ash cleaning chamber 230, and one end of the tempering tube 240 is connected to the first combustion chamber 210, and the other end is connected to the ash cleaning chamber 230. In this way, the flame and high-temperature flue gas in the first combustion chamber 210 can enter the ash cleaning chamber 230 through the tempering tube 240, which not only increases the heat exchange area with water and improves the heat exchange efficiency, but also increases the combustion stroke, so that the fuel burns more fully and improves the fuel utilization rate.

[0040] Optionally, more than two tempering tubes 240 are provided on multiple outer side walls of the first combustion chamber 210 and the ash cleaning chamber 230. In this way, the flame and high-temperature flue gas in the first combustion chamber 210 can enter the ash cleaning chamber 230 from different directions through the tempering tubes 240 provided on different side walls of the first combustion chamber 210, thereby increasing the flow of the flame and high-temperature flue gas and improving the use efficiency of the fuel.

[0041] like Figure 6 and Figure 7As shown, the return structure 300 includes a first return section 310, a second return section 340, and a fire separation bag 330. A first fire collection bag 311 is provided at one end of the first return section 310, and the first fire collection bag 311 is connected to the ash cleaning chamber 230; the second return section 340 is arranged at one side of the first return section 310, and a second fire collection bag 341 is provided at one end; the fire separation bag 330 is connected to an end of the first return section 310 away from the first fire collection bag 311 and an end of the second return section 340 away from the second fire collection bag 341. In this way, the flame and high-temperature flue gas in the ash cleaning chamber 230 can enter the first return section 310, the fire separation bag 330 and the second return section 340 in sequence, which increases the heat conversion area of ​​the flame and the high-temperature flue gas and improves the heat conversion efficiency. At the same time, while the flame and high-temperature flue gas flow in the first return section 310, the fire distribution bag 330 and the second return section 340, they can be sufficiently cooled, so that the smoke can be deposited in the first return section 310 and / or the fire distribution bag 330 and / or the second return section 340, effectively reducing the amount of smoke discharged.

[0042] Optionally, a plurality of fire tubes 320 are provided between the first fire collection package 311 and the fire distribution package 330. In this way, there are a plurality of connecting channels between the first fire collection package 311 and the fire distribution package 330, thereby improving the passing efficiency of the flame and high-temperature smoke, and also increasing the heat conversion contact area between the first fire collection package 311 and the fire distribution package 330, thereby improving the heat conversion efficiency.

[0043] Optionally, a plurality of fire tubes 320 are provided between the fire distribution package 330 and the second fire collection package 341, and the number of the fire tubes 320 is at least twice the number of the fire tubes 320 in the first return section 310. In this way, most of the flame and high-temperature flue gas entering the fire distribution package 330 from the first return section 310 enter the second fire collection package 341 from the upper fire tubes 320 in the second return section 340, and the flame and high-temperature flue gas entering the second fire collection package 341 flow back to the fire distribution package 330 from the lower fire tubes 320 in the second return section 340 under the action of the temperature difference, wherein the flame and high-temperature flue gas flowing back to the fire distribution package 330 partially remain in the fire distribution package 330, and partially flow back to the second fire collection package 341 following the flame and high-temperature flue gas newly entering the fire distribution package 330, and the cycle is repeated until the self-heat is consumed through heat conversion. This design not only improves the efficiency of fuel use, but also improves the heat conversion efficiency.

[0044] It can be understood that the fuel is accumulated on the surface of the grate 260 and burns through the second combustion chamber 220. The flame and high-temperature flue gas generated during the combustion of the fuel enter the first combustion chamber 210, the tempering tube 240, the cleaning chamber 230, the first return section 310, the fire distribution bag 330, and the second return section 340 in sequence from the second combustion chamber 220. While the fuel can be fully burned, the heat conversion journey of the flame and high-temperature flue gas is increased, effectively improving the heat conversion efficiency.

[0045] like Figure 6 and Figure 7 As shown, a cleaning pipe 350 is provided on the outer wall of the first fire collection package 311 and / or the second fire collection package 341, and one end of the cleaning pipe 350 is connected to the inner wall of the first fire collection package 311 and / or the second fire collection package 341, and the other end is connected to the outer wall of the furnace body 100. In this way, during the maintenance of the boiler, the staff can clean the dust deposited in the first fire collection package 311 and the second fire collection package 341 in time through the cleaning pipe 350, so as to avoid the accumulation of smoke and dust in the first fire collection package 311 and / or the second fire collection package 341 affecting the operation of the boiler, and effectively improve the stability of the boiler operation.

[0046] Optionally, a plurality of side walls of the first fire collection package 311 and / or the second fire collection package 341 are provided with ash cleaning pipes 350. In this way, appropriate ash cleaning pipes 350 can be selected and activated to perform corresponding ash cleaning work according to the installation environment and position of the boiler, thereby improving the overall applicability of the boiler.

[0047] Optionally, the ash cleaning pipe 350 can be used to install a smoke exhaust pipe. In this way, the smoke exhaust pipe can be selectively installed according to actual installation conditions and work requirements, so as to further improve the working efficiency of the boiler.

[0048] Optionally, a detachable closing cap 351 is provided on one side of the ash cleaning pipe 350 facing the outer wall of the furnace body 100. In this way, during the operation of the boiler or when the ash cleaning pipe 350 is not activated, the ash cleaning pipe 350 can be blocked by the closing cap so that the furnace body 100 remains closed, effectively preventing foreign matter from entering or other unexpected safety accidents.

[0049] Optionally, a fireproof material is provided on the side of the sealing cap facing the first fire collection package 311 and / or the second fire collection package 341. In this way, the fireproof material effectively isolates the temperature of the flame and high-temperature smoke in the first fire collection package 311 and / or the second fire collection package 341, reduces the temperature of the side of the sealing cap away from the first fire collection package 311 and / or the second fire collection package 341, and reduces the possibility of accidental burns.

[0050] like Figures 8 to 9 As shown, the furnace body 100 further includes a closed door 110 , which is disposed on the outer side wall of the furnace body 100 and is adapted to the first combustion chamber 210 , the second combustion chamber 220 , and the ash cleaning chamber 230 .

[0051] Optionally, the closed door 110 is rotatably arranged on the side wall of the furnace body 100, and a fireproof material is arranged on the side of the closed door 110 facing the first combustion chamber 210, the second combustion chamber 220 or the ash cleaning chamber 230. In this way, the closed door 110 is effectively isolated from the temperature of the combustion chamber side by the fireproof material.

[0052] It can be understood that when the boiler is in working state, the closure adapted to the first combustion chamber 210 is in an open state, while the second combustion chamber 220 and the cleaning chamber 230 are adapted so that the closure door 110 is in a closed state, so that the fuel in the first combustion chamber 210 can obtain sufficient oxygen during combustion.

[0053] like Figure 8 and Fig. 9 As shown, the furnace body 100 also includes a heating water outlet pipe 120, a heating water return pipe 121, a water supply water inlet pipe 130, a water supply water outlet pipe 131, a water level gauge 140, a closed door 160, and a sewage outlet 170. The closed door 160 is arranged on one side of the furnace body 100 and is adapted to the fire distribution package 330; the heating water outlet pipe 120 and the heating water return pipe 121 are arranged on multiple side walls of the furnace body 100; the water supply water inlet pipe 130 and the water supply water outlet pipe 131 are also arranged on multiple side walls of the furnace body 100; the water level gauge 140 is arranged on one side of the heating water outlet pipe 120; the sewage outlet is arranged on one side of the heating water return pipe 121 and is connected to the cavity.

[0054] Optionally, the water supply inlet pipe 130 is connected to one end of the metal hose 400, and the water supply outlet pipe 131 is connected to the other end of the metal hose, and the water supply inlet pipe 130 and the water supply outlet pipe 131 can be arranged on different outer side walls of the furnace body 100. In this way, when the boiler is installed, the water supply inlet pipe 130 and the water supply outlet pipe 131 on different side walls can be selected and activated according to the installation position, thereby improving the applicability of the boiler.

[0055] Optionally, a reserved mounting seat 132 connected to the metal hose 400 is provided on the side wall of the furnace body 100 for installing the water supply inlet pipe 130 and the water supply outlet pipe 131, and a plug is provided in the reserved mounting seat 132. In this way, the water supply inlet pipe 130 at different positions can be activated or deactivated at any time through the reserved mounting seat 132, and the reserved mounting seat 132 is blocked by the plug when not activated, thereby preventing leakage of the reserved mounting seat 132 when not activated.

[0056] Optionally, a top water inlet pipe 150 and a top water outlet pipe 151 for water supply are further provided on the top of the furnace body 100 , both of which are connected to the metal hose 400 .

[0057] It can be understood that the water supply inlet pipe 130 and / or the top water supply inlet pipe 150 are connected to the external water network, so that the cold water in the water network enters the metal hose 400 through the water supply inlet pipe 130 and / or the top water supply inlet pipe 150, and the cold water is gradually heated during the flow in the metal hose, and is finally discharged from the water supply outlet pipe 131 and / or the top water supply outlet pipe 151.

[0058] Optionally, the sealed door 160 is arranged on the furnace body 100 in a rotating and closed manner. In this way, during the operation of the boiler, the sealed door 160 is closed to prevent the flame and high-temperature flue gas in the fire-distributing bag 330 from leaking. When the boiler is under maintenance, the inside of the fire-distributing bag 330 and the fire tube 320 can be cleaned by opening the sealed door 160 to prevent dust from accumulating in the fire-distributing bag 330 and the fire tube 320, thereby improving the stability of the boiler operation.

[0059] like Fig.10 As shown, a detachable flange connection seat 500 is provided on the outer side wall of the furnace body 100. In this way, the boiler can be connected with other equipment through the detachable flange connection seat 500 according to actual needs, thereby effectively improving the applicability of the boiler.

[0060] Optionally, the flange connection seat 500 is arranged at the edge of the second combustion chamber 220 .

[0061] Optionally, a burner is also included, and its fire output end is adapted to be connected with the flange connection seat 500. In this way, after the burner is connected with the boiler through the flange, gas is used as the fuel supply for the boiler operation, thereby improving the diversity of the boiler's fuel selection.

[0062] Optionally, a biomass feeding device is further included, and the feeding port included in the biomass feeding device is adapted to be connected with the flange connection seat 500. In this way, after the biomass feeding device is connected to the boiler through the flange, biomass is used as the fuel supply for the boiler operation, which improves the diversity of the boiler's fuel selection.

[0063] Finally, although this specification is described according to implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.

Claims

1. A multi-purpose smokeless boiler, It is characterized in that include: A furnace body (100) having a cavity therein; An inner furnace (200) is disposed in the cavity; A return structure (300) is arranged on one side of the inner furnace (200), and one end of the return structure is connected to the inner furnace (200); A metal hose (400) is disposed in the cavity and is adjacent to the inner furnace (200) and / or the return structure (300); The cavity and the metal hose (400) are filled with flowing water.

2. The multi-purpose smokeless boiler according to claim 1, It is characterized in that The inner furnace (200) comprises: A first combustion chamber (210), wherein a combustion cavity is defined therein; A second combustion chamber (220) is disposed on one side of the first combustion chamber (210) and is in communication with the combustion chamber; A dust cleaning chamber (230) is arranged on a side of the second combustion chamber (220) away from the first combustion chamber (210) and is in communication with the second combustion chamber (220); The first combustion chamber (210), the second combustion chamber (220), and the ash cleaning chamber (230) are all connected to a plurality of side walls of the furnace body (100), and are in communication with the external space.

3. The multi-purpose smokeless boiler according to claim 2, It is characterized in that At least two tempering tubes (240) are provided on the outer side wall between the second combustion chamber (220) and the ash cleaning chamber (230), and one end of the tempering tube (240) is in communication with the second combustion chamber (220), and the other end is in communication with the ash cleaning chamber (230).

4. The multi-purpose smokeless boiler according to claim 2, It is characterized in that A grate is provided between the first combustion chamber (210) and the second combustion chamber (220).

5. The multi-purpose smokeless boiler according to claim 1, It is characterized in that The backhaul structure (300) includes: A first return section (310) is provided with a first fire collection bag (311) at one end, and the first fire collection bag (311) is connected to the dust cleaning chamber (230); A second return section (340) is arranged on one side of the first return section (310), and a second fire collection bag (341) is provided at one end; The fire distribution package (330) is connected to an end of the first return segment (310) away from the first fire collection package (311) and an end of the second return segment (340) away from the second fire collection package (341).

6. The multi-purpose smokeless boiler according to claim 5, It is characterized in that A ash cleaning pipe (350) is provided on the outer side wall of the first fire collection package (311) and / or the second fire collection package (341), and one end of the ash cleaning pipe (350) is connected to the inner side wall of the first fire collection package (311) and / or the second fire collection package (341), and the other end is connected to the outer side wall of the furnace body (100).

7. The multi-purpose smokeless boiler according to claim 1, It is characterized in that The furnace body (100) further comprises: The closed door (110) is arranged on the outer wall of the furnace body (100) and is compatible with the first combustion chamber (210), the second combustion chamber (220), and the ash cleaning chamber (230).

8. The multi-purpose smokeless boiler according to claim 1, It is characterized in that A detachable flange connection seat (500) is provided on the outer side wall of the furnace body (100).

9. The multi-purpose smokeless boiler according to any one of claims 1 to 8, It is characterized in that It also includes a burner, whose fire output end is adaptably connected to the flange connection seat (500).

10. The multi-purpose smokeless boiler according to any one of claims 1 to 8, It is characterized in that A biomass feeding device is also included, and a feeding port included in the biomass feeding device is adaptably connected to the flange connection seat (500).