Urban river sludge collecting structure

By introducing lifting plates and extraction tube transmission plates into the urban river silt collection structure, the problems of silt collection position adjustment and river water doping are solved, and the effect of efficient silt collection and prevention of blockage is achieved.

CN222314107UActive Publication Date: 2025-01-07ANHUI QINGHONG MUNICIPAL ENGINEERING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420629123.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-29
Publication Date
2025-01-07
Estimated Expiration
2034-03-29

AI Technical Summary

Technical Problem

The existing urban river silt collection structure cannot adjust and collect fixed-point silt according to the needs of users, and it is easy to be mixed with a large amount of river water when it penetrates deep into the river, which affects efficiency.

Method used

A structure including bottom plate, silt storage box, silt transmission bin, lift plate and silt extraction bin was designed. The flexible collection and extraction of silt was achieved through the lift plate and the extraction pipe transmission plate to avoid river water doping, and the use of a dragon-sharpening motor Efficient storage and discharge of sludge.

Benefits of technology

The sludge collection location is adjusted according to needs, reducing river water doping, improving sludge collection efficiency, and preventing sludge deposition and blockage through the dragon crimp motor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222314107U_ABST
    Figure CN222314107U_ABST
Patent Text Reader

Abstract

The utility model discloses an urban river sludge collecting structure which comprises a bottom plate, the rear side of the bottom plate is fixedly connected with a sludge storage box, the top of the bottom plate is fixedly connected with a sludge conveying bin, and the side, away from the sludge conveying bin, of the top of the bottom plate is fixedly connected with a lifting plate. The device comprises a lifting plate, the inner wall of the front side of the lifting plate is movably connected with a sludge extraction bin, the lifting plate comprises a lifting plate body, the left side of the lifting plate body is fixedly connected with a discharging plate, the top of the discharging plate is provided with a discharging plate feeding port, and the rear side of the discharging plate is fixedly connected with a discharging pipe. By arranging the lifting plate main body, the extraction pipe transmission plate and the sludge extraction bottom block, sludge at a certain fixed point in a river channel can be adjusted and collected according to the requirements of a user, and when the device goes deep into the river channel, due to shielding of the bottom of the sludge extraction bottom block, a large amount of river water cannot be doped firstly, and the sludge can be continuously discharged without discharging a large amount of river water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of sludge collection, in particular to a sludge collection structure for an urban river. Background Art

[0002] Silt is a soft soil with a natural water content greater than the flow limit and a porosity greater than 1.5. It is a modern sediment formed under the conditions of slow water flow in bays, lakes or river bays with the participation of microorganisms. It is rich in organic matter, often gray-black, with low mechanical strength and strong compressibility. If there is silt in the foundation, it is easy to cause the building to sink;

[0003] According to the patent document: CN220202804U, a silt-clearing device for river channel management is disclosed, including a grip and a connecting column, the connecting column is fixedly installed on the top of the grip, and the outer wall of the connecting column is provided with a silt-clearing mechanism and a salvaging mechanism, and the silt-clearing mechanism includes an adjustment unit and a cleaning unit. The silt-clearing device for river channel management can adjust the position of the silt-clearing structure according to the depth of the river channel by setting the silt-clearing mechanism, thereby improving the silt-clearing efficiency of the device, solving the problem that the device proposed in the background technology is not convenient to adjust the silt-clearing structure according to the depth of the river channel, so that the device has certain limitations. By setting the salvaging mechanism, garbage and other debris in the river channel can be salvaged and collected while silting the river channel, thereby improving the overall environment of the river channel and improving the environment of the river channel.

[0004] The water in urban rivers is formed by the confluence of various tributaries, and the water in the tributaries will carry garbage and silt into the river. The garbage floats on the water surface and is cleaned by salvage, while the silt is deposited underwater and is inconvenient to clean. If it is not cleaned for a long time, it will cause blockage in the river. General silt collection structures can only collect silt from a fixed point deep into the river, and cannot be adjusted to collect silt at a fixed point in the river according to the needs of users. When going deep into the river, a large amount of river water may be mixed in first, and a large amount of river water needs to be discharged before the silt can continue to be discharged, which affects efficiency. Utility Model Content

[0005] The purpose of the utility model is to provide a silt collection structure for urban rivers, so as to solve the problem that the silt collection structure proposed in the above-mentioned background technology can only collect silt by going deep into the river at a fixed point, and cannot be adjusted according to the needs of users to collect silt at a fixed point in the river, and when going deep into the river, a large amount of river water may be mixed in first, and a large amount of river water needs to be discharged before the silt can be discharged, which affects the efficiency.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a silt collection structure for an urban river, comprising a bottom plate, a silt storage box is fixedly connected to the rear side of the bottom plate, a silt transmission bin is fixedly connected to the top of the bottom plate, a lifting plate is fixedly connected to the side of the top of the bottom plate away from the silt transmission bin, and a silt extraction bin is movably connected to the front inner wall of the lifting plate;

[0007] The lifting plate comprises a lifting plate main body, a discharge plate is fixedly connected to the left side of the lifting plate main body, a discharge plate inlet is provided at the top of the discharge plate, and a discharge pipe is fixedly connected to the rear side of the discharge plate.

[0008] Preferably, a lifting plate partition is fixedly connected to the upper inner wall of the lifting plate body, a motor is fixedly connected to the top of the lifting plate partition, the output end of the motor passes through the bottom of the lifting plate partition and is fixedly connected to a screw rod, and the bottom of the screw rod is movably connected to the bottom of the inner wall of the lifting plate body.

[0009] Preferably, the outer wall of the screw rod is threadedly connected to a transmission block, the front side of the transmission block is fixedly connected to a transverse transmission plate, the top of the transverse transmission plate is provided with a top groove, the top left side of the transverse transmission plate is fixedly connected to a gear motor placement block, the inner wall of the gear motor placement block is fixedly connected to a gear motor, and the output end of the gear motor is fixedly connected to a gear.

[0010] Preferably, the sludge extraction bin includes an extraction pipe transmission plate, a slide plate is fixedly connected to the rear side of the extraction pipe transmission plate, a rack is fixedly connected to the top of the slide plate, the outer wall of the slide plate is slidably connected to the inner wall of the transverse transmission plate, the top of the rack engages the outer wall of the gear through a top groove, and the bottom of the extraction pipe transmission plate is fixedly connected to the sludge extraction bottom block.

[0011] Preferably, the extraction pipe transmission plate includes a transmission plate main body, a transmission plate partition is fixedly connected to the upper inner wall of the transmission plate main body, the top of the transmission plate partition is fixedly connected to a dual-axis motor, the left and right output ends of the dual-axis motor are respectively fixedly connected with conical teeth, the two conical teeth are meshed with the second conical teeth on the side away from the dual-axis motor, the inner walls of the two second conical teeth are fixedly connected with a second screw rod, the bottoms of the two second screw rods penetrate to the bottom of the transmission plate partition and are movably connected to the bottom of the inner wall of the transmission plate main body, the outer walls of the two second screw rods are threadedly connected with a second transmission block, the opposite surfaces of the two second transmission blocks are fixedly connected with a sludge extraction pipe, the bottom of the sludge extraction pipe extends to the outer wall of the transmission plate main body, the top of the sludge extraction pipe is fixedly connected with a sludge conveying pipe, the end of the sludge conveying pipe away from the sludge extraction pipe extends to the outer wall of the transmission plate main body and is fixedly connected to the top of the feed inlet of the discharge plate.

[0012] Preferably, the sludge extraction bottom block includes an extraction block body, the top of the extraction block body is fixedly connected to the bottom of the sludge extraction pipe, the rear side of the extraction block body is fixedly connected to the extraction block motor placement block, the left and right sides of the lower rear side of the extraction block body are respectively fixedly connected to the rotating rod placement blocks, the inner walls of the two rotating rod placement blocks are rotatably connected to the rotating rods, the inner wall of the extraction block motor placement block is fixedly connected to the second motor, the bottom of the second motor is fixedly connected to the third conical teeth, the bottom of the third conical teeth engages with the fourth conical teeth, the inner wall of the fourth conical teeth is fixedly connected to the outer wall of the rotating rod, the left and right sides of the rotating rod are respectively fixedly connected to the rotating blocks, and the bottom of the two rotating blocks are fixedly connected to the cover plates.

[0013] Preferably, the sludge transfer bin includes a sludge feeding bin, a sludge feeding port is opened at the bottom of the inner wall of the sludge feeding bin, side panels are fixedly connected to the left and right sides of the bottom of the sludge feeding bin respectively, and the opposite surfaces of the two side panels are fixedly connected to sludge transfer plates, the top of the sludge transfer plate is fixedly connected to the bottom of the sludge feeding port, the bottom of the sludge feeding port penetrates to the inner wall of the sludge transfer plate, the front side of the sludge transfer plate is fixedly connected to an auger motor placement block, the top of the auger motor placement block is fixedly connected to an auger motor, the output end of the auger motor penetrates to the inner wall of the sludge transfer plate and is fixedly connected to the auger, and the rear side of the sludge transfer plate is a hollow design.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. By setting up the lifting plate body, the extraction pipe transmission plate and the silt extraction bottom block, the silt at a fixed point in the river channel can be collected according to the needs of the user. When going deep into the river channel, there is a shield at the bottom of the silt extraction bottom block, and a large amount of river water will not be mixed first, and there is no need to discharge a large amount of river water before continuing to discharge silt;

[0016] 2. By setting up the sludge feeding silo, sludge transmission plate, auger and sludge storage box, the collected sludge can be discharged through the auger, which is more convenient and labor-saving, and can also prevent blockage caused by silt deposition. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the main three-dimensional structure of the utility model;

[0018] Figure 2 It is a three-dimensional cross-sectional structural schematic diagram of the lifting plate of the utility model;

[0019] Figure 3 This is a schematic diagram of the three-dimensional structure of the sludge extraction bin of the utility model;

[0020] Figure 4This is a three-dimensional cross-sectional structural diagram of the extraction tube transmission plate of the utility model;

[0021] Figure 5 This is a schematic diagram of the three-dimensional structure of the sludge extraction bottom block of the utility model;

[0022] Figure 6 It is a schematic diagram of the three-dimensional structure of the sludge transmission bin of the utility model.

[0023] In the figure: 1. bottom plate; 2. sludge storage box; 3. sludge transmission bin; 31. sludge feeding bin; 32. sludge feeding port; 33. side plate; 34. sludge transmission plate; 35. auger motor placement block; 36. auger motor; 37. auger; 4. lifting plate; 41. lifting plate body; 42. lifting plate partition; 43. motor; 44. screw rod; 45. transmission block; 46. horizontal transmission plate; 47. top groove; 48. gear motor placement block; 49. gear; 410. gear motor; 411. discharge plate; 412. discharge plate feeding port; 413. discharge pipe; 5. sludge extraction bin ; 51, extraction tube transmission plate; 511, transmission plate body; 512, transmission plate partition; 513, dual-axis motor; 514, conical teeth; 515, second conical teeth; 516, second screw rod; 517, second transmission block; 518, sludge extraction tube; 519, sludge conveying pipe; 52, slide plate; 53, rack; 54, sludge extraction bottom block; 541, extraction block body; 542, extraction block motor placement block; 543, second motor; 544, third conical teeth; 545, fourth conical teeth; 546, rotating rod placement block; 547, rotating block; 548, cover plate; 549, rotating rod. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 and Figure 6The utility model provides a technical solution: a silt collection structure for an urban river, comprising a bottom plate 1, a silt storage box 2 is fixedly connected to the rear side of the bottom plate 1, a silt transmission bin 3 is fixedly connected to the top of the bottom plate 1, a lifting plate 4 is fixedly connected to the side of the top of the bottom plate 1 away from the silt transmission bin 3, and a silt extraction bin 5 is movably connected to the front inner wall of the lifting plate 4. When it is necessary to collect silt, the upper inner wall of the lifting plate 4 is first driven to move the silt extraction bin 5 downward, and then the silt extraction bin 5 is moved downward according to the needs of the user. Start the front top of the lifting plate 4 to drive the sludge extraction bin 5 to move horizontally to the sludge that needs to be collected, and then start the inner wall of the sludge extraction bin 5 to drive the bottom of the sludge extraction bin 5 downward. When the bottom of the sludge extraction bin 5 drops to the sludge, start the rear side to open the bottom of the sludge extraction bin 5 to collect the sludge, and the extracted sludge is discharged into the sludge transmission bin 3 through the left side of the lifting plate 4. Then, the bottom front side of the sludge transmission bin 3 is started to discharge the sludge into the inner wall of the sludge storage box 2 for storage.

[0026] See also Figure 2 , Figure 3 , Figure 4 and Figure 5In order to improve the chain processing efficiency, the lifting plate 4 includes a lifting plate body 41, a discharge plate 411 is fixedly connected to the left side of the lifting plate body 41, a discharge plate inlet 412 is provided on the top of the discharge plate 411, a discharge pipe 413 is fixedly connected to the rear side of the discharge plate 411, a lifting plate partition 42 is fixedly connected to the upper inner wall of the lifting plate body 41, a motor 43 is fixedly connected to the top of the lifting plate partition 42, an output end of the motor 43 passes through the bottom of the lifting plate partition 42 and is fixedly connected to a screw rod 44, the bottom of the screw rod 44 is movably connected to the bottom of the inner wall of the lifting plate body 41, a transmission block 45 is threadedly connected to the outer wall of the screw rod 44, a transverse transmission plate 46 is fixedly connected to the front side of the transmission block 45, and a top groove 4 is provided on the top of the transverse transmission plate 46. 7. A gear motor placement block 48 is fixedly connected to the left side of the top of the transverse transmission plate 46, a gear motor 410 is fixedly connected to the inner wall of the gear motor placement block 48, a gear 49 is fixedly connected to the output end of the gear motor 410, the sludge extraction chamber 5 includes an extraction pipe transmission plate 51, a slide plate 52 is fixedly connected to the rear side of the extraction pipe transmission plate 51, a rack 53 is fixedly connected to the top of the slide plate 52, the outer wall of the slide plate 52 is slidably connected to the inner wall of the transverse transmission plate 46, the top of the rack 53 engages the outer wall of the gear 49 through the top groove 47, the bottom of the extraction pipe transmission plate 51 is fixedly connected to the sludge extraction bottom block 54, the extraction pipe transmission plate 51 includes a transmission plate body 511, and a transmission plate partition 512 is fixedly connected to the upper inner wall of the transmission plate body 511. A dual-axis motor 513 is fixedly connected to the top of the transmission plate partition 512, and conical teeth 514 are fixedly connected to the left and right output ends of the dual-axis motor 513 respectively. The two conical teeth 514 are meshed with second conical teeth 515 on the side away from the dual-axis motor 513. The inner walls of the two second conical teeth 515 are fixedly connected with second screw rods 516. The bottoms of the two second screw rods 516 penetrate to the bottom of the transmission plate partition 512 and are movably connected to the bottom of the inner wall of the transmission plate body 511. The outer walls of the two second screw rods 516 are threadedly connected with second transmission blocks 517. The opposite surfaces of the two second transmission blocks 517 are fixedly connected with sludge suction pipes 518. The bottom of the sludge suction pipes 518 extends to the outer wall of the transmission plate body 511. A sludge conveying pipe 519 is fixedly connected, and one end of the sludge conveying pipe 519 away from the sludge suction pipe 518 extends to the outer wall of the transmission plate body 511 and is fixedly connected to the top of the discharge plate inlet 412. The sludge extraction bottom block 54 includes an extraction block body 541, and the top of the extraction block body 541 is fixedly connected to the bottom of the sludge suction pipe 518. The rear side of the extraction block body 541 is fixedly connected to an extraction block motor placement block 542. The left and right sides of the lower rear side of the extraction block body 541 are respectively fixedly connected to rotating rod placement blocks 546. The inner walls of the two rotating rod placement blocks 546 are rotatably connected to rotating rods 549. The inner wall of the extraction block motor placement block 542 is fixedly connected to a second motor 543, and the bottom of the second motor 543 is fixedly connected to a third conical tooth 544.The bottom of the third conical tooth 544 meshes with the fourth conical tooth 545, the inner wall of the fourth conical tooth 545 is fixedly connected to the outer wall of the rotating rod 549, the left and right sides of the rotating rod 549 are respectively fixedly connected with rotating blocks 547, and the bottoms of the two rotating blocks 547 are fixedly connected with cover plates 548. When it is necessary to collect sludge, firstly, the transmission screw 44 of the starting motor 43 is rotated, so that the transmission block 45 drives the transverse transmission plate 46 to move downward to extend the sludge extraction bottom block 54 at the bottom of the extraction pipe transmission plate 51 into the river water, and then the gear motor 410 is started according to the needs of the user to rotate the transmission gear 49. After the gear 49 rotates, the transmission slide plate 52 is driven by the rack 53 to move forward on the inner wall of the transverse transmission plate 46 to the position where the user needs to collect sludge. The silt is collected at any position in the river, and then the double-axis motor 513 is started to drive the conical teeth 514 at both ends to drive the second conical teeth 515 to rotate the second screw rod 516. After the second screw rod 516 rotates, the second transmission block 517 drives the silt extraction pipe 518 to move downward so that the extraction block body 541 at the bottom of the silt extraction pipe 518 moves downward to the bottom of the river. After the extraction block body 541 moves to the bottom of the river, the second motor 543 is started to drive the rotating rod 549 to rotate the rotating block 547 to flip the cover plate 548 to open the bottom of the extraction block body 541. After that, the silt is extracted through the extraction block body 541 and the silt extraction pipe 518, and then transmitted to the inside of the discharge plate 411 through the silt conveying pipe 519, and then the silt is discharged through the discharge pipe 413.

[0027] See also Figure 6 In order to improve the chain processing efficiency, the sludge transmission bin 3 includes a sludge feeding bin 31, and a sludge feeding port 32 is opened at the bottom of the inner wall of the sludge feeding bin 31. The left and right sides of the bottom of the sludge feeding bin 31 are fixedly connected with side panels 33 respectively, and the opposite sides of the two side panels 33 are fixedly connected with sludge transmission plates 34. The top of the sludge transmission plate 34 is fixedly connected to the bottom of the sludge feeding port 32, and the bottom of the sludge feeding port 32 penetrates to the inner wall of the sludge transmission plate 34. The front side of the sludge transmission plate 34 is fixedly connected with The auger motor is placed on a block 35, and an auger motor 36 is fixedly connected to the top of the auger motor placement block 35. The output end of the auger motor 36 passes through the inner wall of the sludge transfer plate 34 and is fixedly connected to the auger 37. The rear side of the sludge transfer plate 34 is hollowed out. The sludge is transported to the inner wall of the sludge feed bin 31, flows into the interior of the sludge transfer plate 34 through the sludge feed port 32, and then the auger motor 36 is started to drive the auger 37. After the auger 37 rotates, the sludge is transported to the interior of the sludge storage box 2 for collection.

[0028] Working principle: When the device is used, when it is necessary to collect silt, firstly, the transmission screw 44 is rotated by starting the motor 43, so that the transmission block 45 drives the transverse transmission plate 46 to move downward to extend the silt extraction bottom block 54 at the bottom of the extraction tube transmission plate 51 into the river water, and then the gear motor 410 is started to drive the gear 49 to rotate according to the needs of the user. After the gear 49 rotates, the gear plate 52 is driven by the rack 53 to move forward on the inner wall of the transverse transmission plate 46 to any position of the river where the user needs to collect silt, and then the double-axis motor 513 is started to drive the conical teeth 514 at both ends to drive the second The conical gear 515 rotates the second screw rod 516. After the second screw rod 516 rotates, the second transmission block 517 drives the sludge extraction pipe 518 to move downward so that the extraction block body 541 at the bottom of the sludge extraction pipe 518 moves downward to the bottom of the river. After the extraction block body 541 moves to the bottom of the river, the second motor 543 is started to drive the rotating rod 549 to rotate the rotating block 547 to flip the cover plate 548 to open the bottom of the extraction block body 541. Then, the sludge is extracted through the extraction block body 541 and the sludge extraction pipe 518 and transmitted to the inside of the discharge plate 411 through the sludge conveying pipe 519, and then the sludge is discharged through the discharge pipe 413.

[0029] The sludge is transported to the inner wall of the sludge feeding bin 31 and flows into the interior of the sludge transmission plate 34 through the sludge feeding port 32. Then, the auger motor 36 is started to drive the auger 37. After the auger 37 rotates, the sludge is transported to the interior of the sludge storage box 2 for collection.

[0030] The above is the working process of the entire device, and the contents not described in detail in this specification belong to the existing technology known to professional and technical personnel in this field.

[0031] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A silt collection structure for an urban river, comprising a bottom plate (1), characterized in that: The rear side of the bottom plate (1) is fixedly connected to a sludge storage box (2), the top of the bottom plate (1) is fixedly connected to a sludge transmission bin (3), the top of the bottom plate (1) is fixedly connected to a lifting plate (4) on a side away from the sludge transmission bin (3), and the front inner wall of the lifting plate (4) is movably connected to a sludge extraction bin (5); The lifting plate (4) comprises a lifting plate body (41), a discharge plate (411) is fixedly connected to the left side of the lifting plate body (41), a discharge plate inlet (412) is provided at the top of the discharge plate (411), and a discharge pipe (413) is fixedly connected to the rear side of the discharge plate (411).

2. The silt collection structure for an urban river according to claim 1, characterized in that: A lifting plate partition (42) is fixedly connected to the upper inner wall of the lifting plate body (41), a motor (43) is fixedly connected to the top of the lifting plate partition (42), an output end of the motor (43) passes through the bottom of the lifting plate partition (42) and is fixedly connected to a screw rod (44), and the bottom of the screw rod (44) is movably connected to the bottom of the inner wall of the lifting plate body (41).

3. A silt collection structure for an urban river according to claim 2, characterized in that: The outer wall of the screw rod (44) is threadedly connected to a transmission block (45); the front side of the transmission block (45) is fixedly connected to a transverse transmission plate (46); a top groove (47) is provided on the top of the transverse transmission plate (46); a gear motor placement block (48) is fixedly connected to the left side of the top of the transverse transmission plate (46); a gear motor (410) is fixedly connected to the inner wall of the gear motor placement block (48); and a gear (49) is fixedly connected to the output end of the gear motor (410).

4. The silt collection structure for an urban river according to claim 1, characterized in that: The sludge extraction bin (5) comprises an extraction pipe transmission plate (51), a slide plate (52) is fixedly connected to the rear side of the extraction pipe transmission plate (51), a rack (53) is fixedly connected to the top of the slide plate (52), the outer wall of the slide plate (52) is slidably connected to the inner wall of the transverse transmission plate (46), the top of the rack (53) is engaged with the outer wall of the gear (49) through the top groove (47), and the bottom of the extraction pipe transmission plate (51) is fixedly connected to the sludge extraction bottom block (54).

5. The silt collection structure for urban rivers according to claim 4, characterized in that: The extraction tube transmission plate (51) comprises a transmission plate body (511), a transmission plate partition (512) is fixedly connected to the upper inner wall of the transmission plate body (511), a dual-axis motor (513) is fixedly connected to the top of the transmission plate partition (512), left and right output ends of the dual-axis motor (513) are respectively fixedly connected to conical teeth (514), the two sides of the conical teeth (514) away from the dual-axis motor (513) are meshed with second conical teeth (515), the inner walls of the two second conical teeth (515) are fixedly connected to second screw rods (516), the bottoms of the two second screw rods (516) are penetrated to the transmission plate partition. The bottom of the plate (512) is movably connected to the bottom of the inner wall of the transmission plate body (511), the outer walls of the two second screw rods (516) are threadedly connected to the second transmission blocks (517), and the opposite surfaces of the two second transmission blocks (517) are fixedly connected to the sludge suction pipe (518), the bottom of the sludge suction pipe (518) extends to the outer wall of the transmission plate body (511), and the top of the sludge suction pipe (518) is fixedly connected to the sludge conveying pipe (519), and the end of the sludge conveying pipe (519) away from the sludge suction pipe (518) extends to the outer wall of the transmission plate body (511) and is fixedly connected to the top of the discharge plate inlet (412).

6. The silt collection structure for urban rivers according to claim 4, characterized in that: The sludge extraction bottom block (54) comprises an extraction block body (541), the top of the extraction block body (541) is fixedly connected to the bottom of the sludge extraction pipe (518), the rear side of the extraction block body (541) is fixedly connected to an extraction block motor placement block (542), the left and right sides of the lower rear side of the extraction block body (541) are respectively fixedly connected to rotating rod placement blocks (546), the inner walls of the two rotating rod placement blocks (546) are rotatably connected to rotating rods (549), and the extraction block motor placement blocks (542) are fixedly connected to the bottom of the sludge extraction pipe (518), and the extraction block motor placement blocks (542) are fixedly connected to the bottom of the sludge extraction pipe (518), and the extraction block motor placement blocks (542) are fixedly connected to the left and right sides of the lower rear side of the extraction block body (541). The inner wall of the placement block (542) is fixedly connected to a second motor (543), the bottom of the second motor (543) is fixedly connected to a third conical tooth (544), the bottom of the third conical tooth (544) engages with a fourth conical tooth (545), the inner wall of the fourth conical tooth (545) is fixedly connected to the outer wall of the rotating rod (549), the left and right sides of the rotating rod (549) are respectively fixedly connected to rotating blocks (547), and the bottoms of the two rotating blocks (547) are fixedly connected to a cover plate (548).

7. The silt collection structure for an urban river according to claim 1, characterized in that: The sludge transmission bin (3) comprises a sludge feeding bin (31), a sludge feeding port (32) is provided at the bottom of the inner wall of the sludge feeding bin (31), side panels (33) are fixedly connected to the left and right sides of the bottom of the sludge feeding bin (31), and sludge transmission plates (34) are fixedly connected to the opposite sides of the two side panels (33). The top of the sludge transmission plate (34) is fixedly connected to the bottom of the sludge feeding port (32), and the bottom of the sludge feeding port (32) penetrates to the inner wall of the sludge transmission plate (34). The front side of the sludge transmission plate (34) is fixedly connected to an auger motor placement block (35), and the top of the auger motor placement block (35) is fixedly connected to an auger motor (36), and the output end of the auger motor (36) penetrates to the inner wall of the sludge transmission plate (34) and is fixedly connected to an auger (37). The rear side of the sludge transmission plate (34) is hollowed out.

Citation Information

Patent Citations

  • Anti-blocking riverway desilting device for riverway treatment

    CN220202804U