Slope embankment pushing type landslide treatment structure

By setting up construction ditches and prefabricated pile plates on the slope of slope embankments and backfilling, the problems of complex construction and high engineering cost of existing slope protection methods are solved, and the slope stability is improved and the construction is simplified.

CN222594907UActive Publication Date: 2025-03-11CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420971505.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-07
Publication Date
2025-03-11
Estimated Expiration
2034-05-07

AI Technical Summary

Technical Problem

The existing slope protection method is complex in construction and high in strength requirements, which leads to excessive cost of construction and disturbs the stability of the original embankment soil, increasing the risk of instability and damage.

Method used

The slope embankment push-through landslide treatment structure is adopted, including setting up construction ditches at the foot of the embankment slope, setting up prefabricated pile plates in the construction ditch, inserting soil at the bottom of the prefabricated pile plates, extending axially along the construction ditch, and backfilling between the construction ditch and the prefabricated pile plates.

Benefits of technology

It reduces the excavation of slopes by construction, avoids disturbances to the stability of the original soil, reduces the cost of the project, simplifies the construction process, and effectively deals with the shear force and bending moment of slope soil.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222594907U_ABST
    Figure CN222594907U_ABST
Patent Text Reader

Abstract

The slope embankment pushing type landslide treatment structure comprises an embankment side slope, a construction ditch is formed in the slope toe of the embankment side slope and located at the bottom of a potential sliding face of the embankment side slope, an assembly type pile plate is arranged in the construction ditch, and the bottom of the assembly type pile plate is inserted into a soil body. The upper portion of the fabricated pile plate extends in the axial direction of the construction ditch, and backfill is arranged between the construction ditch and the fabricated pile plate. According to the treatment structure disclosed by the utility model, large-range excavation on the slope during construction is reduced, so that the stability of an original embankment soil body cannot be further disturbed, the stress balance state of the original soil body cannot be damaged, and the possibility that the original high slope is faced with instability damage is avoided; the construction is simple, the construction period is short, and the construction cost is low.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of slope support, and in particular to a slope embankment push-type landslide control structure. Background Art

[0002] At present, due to the limitation of route selection, some roads and railways often encounter some high slopes that are difficult to cross. At this time, using high fill embankments to solve this problem is a more economical and environmentally friendly treatment method. However, due to the large filling area and earthwork volume, the fill soil is difficult to compact, resulting in a decrease in the overall strength of the entire fill embankment, making it difficult to maintain overall stability. It is usually necessary to set a support structure at the foot of the slope to enhance the stability of the slope.

[0003] There are many existing slope protection methods, including anti-slide piles, stone masonry and retaining walls. Although the above methods can improve the stability of the slope to a certain extent, the construction is complicated and the strength requirements of the slope protection structure are high, which leads to the over-large size of the slope protection structure and excessively high project costs. Utility Model Content

[0004] Based on this, it is necessary to provide a slope embankment push-type landslide control structure to overcome the defects mentioned in the above background technology.

[0005] A slope embankment push-type landslide control structure comprises an embankment slope, a construction ditch is arranged at the foot of the embankment slope, the construction ditch is located at the bottom of the potential sliding surface of the embankment slope, an assembled pile plate is arranged in the construction ditch, the bottom of the assembled pile plate is inserted into the soil, and the upper part thereof extends along the axial direction of the construction ditch, and backfill material is arranged between the construction ditch and the assembled pile plate.

[0006] As a preferred embodiment of the medium-slope embankment push-type landslide control structure of the utility model, the construction ditch is parallel to the extension direction of the bottom of the embankment slope.

[0007] As a preferred embodiment of the medium-slope embankment push-type landslide control structure of the utility model, the depth of the construction ditch is the distance from the slope surface to the potential sliding surface of the embankment slope.

[0008] As a preferred embodiment of the push-type landslide control structure for the slope embankment of the utility model, the assembled pile plates include multiple ones, and adjacent assembled pile plates are plugged into each other, which include inserted piles, vertical plates, horizontal plates and triangular plates. The vertical plates are arranged perpendicular to the ground, and the horizontal plates are fixedly connected to the bottom of the vertical plates away from the slope side of the embankment. The triangular plates are arranged between the vertical plates and the horizontal plates, and the inserted piles are arranged at the bottom of the horizontal plates.

[0009] As a preferred embodiment of the medium-slope embankment push-type landslide control structure of the utility model, expansion joints are provided between adjacent assembled pile plates.

[0010] As a preferred embodiment of the push-type landslide control structure for the medium-slope embankment of the utility model, the inserted pile includes a pile head and a pile body, the bottom of the pile head is conical, and the cross-section of the pile body is rectangular, which is fixedly connected to the top of the pile head.

[0011] As a preferred embodiment of the medium slope embankment push-type landslide control structure of the utility model, the backfill material includes backfill soil and crushed stone, and the crushed stone is laid on the top of the backfill soil.

[0012] Beneficial effects of the utility model:

[0013] 1. The management structure in the utility model reduces the large-scale excavation of the slope during construction, so as not to cause further disturbance to the stability of the original embankment soil, destroy the stress balance state of the original soil, and avoid the possibility of the original high slope facing instability and damage; and the construction is simple, the construction period is short, and the project cost is low.

[0014] 2. The assembled pile plate in the utility model converts the shear force and bending moment generated by the slope soil into pressure on the soil, which effectively handles the shear force and bending moment generated by the slope soil and avoids damage to the structure due to resisting excessive shear force and bending moment. Compared with the existing structure, the structure size is small and the engineering cost is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0016] Figure 1 This is a schematic diagram of the cross-sectional structure of the governance structure in the embodiment of the present application;

[0017] Figure 2 This is a schematic diagram of the connection structure of adjacent assembled pile plates in an embodiment of the present application;

[0018] Figure 3 This is a schematic diagram of the assembled pile plate structure in the embodiment of the present application;

[0019] Description of reference numerals:

[0020] 1. Embankment slope; 2. Construction ditch; 3. Prefabricated pile board; 31. Vertical board; 32. Horizontal board; 33. Triangular board; 34. Pile head; 35. Pile body; 4. Backfill material. DETAILED DESCRIPTION

[0021] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present application. However, the present application can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present application, so the present application is not limited by the specific embodiments disclosed below.

[0022] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0023] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0024] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0025] In the present application, unless otherwise clearly specified and limited, a first feature being “above” or “below” a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being “above”, “above”, and “above” a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being “below”, “below”, and “below” a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0026] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "upper", "lower", "left", "right" and similar expressions used herein are for illustrative purposes only and are not intended to be the only implementation method.

[0027] Example

[0028] This embodiment provides a slope embankment push-type landslide control structure, such as Figure 1 As shown in the figure, the arc dotted line represents the potential sliding surface, and the control structure includes an embankment slope 1. A construction ditch 2 parallel to the extension direction of the bottom slope foot is arranged at the foot of the embankment slope 1. The construction ditch 2 is located at the bottom of the potential sliding surface of the embankment slope 1. An assembled pile plate 3 is arranged in the construction ditch 2. The bottom of the assembled pile plate 3 is inserted into the soil, and the upper part thereof extends along the axial direction of the construction ditch 2. Backfill material 4 is arranged between the construction ditch 2 and the assembled pile plate 3.

[0029] In this embodiment, the depth of the construction trench 2 is the distance from the slope surface to the potential sliding surface of the embankment slope 1, and its width is 2m.

[0030] like Figure 2 and Figure 3 As shown, the assembled pile plate 3 includes multiple, adjacent assembled pile plates 3 are plugged into each other, including inserted piles, vertical plates 31, horizontal plates 32 and triangular plates 33. The height of the vertical plate 31 is 1m, the thickness is 20cm, the length in the horizontal direction is 5m, and it is set perpendicular to the ground. The thickness of the horizontal plate 32 is 20cm, the width is 1.5m, and the length is 5m. It is fixed to the bottom of the vertical plate 31 away from the side of the embankment slope 1. The triangular plate 33 is set between the vertical plate 31 and the horizontal plate 32. The length of the vertical right-angle side is 1m, the horizontal right-angle side is 1.5m, and the thickness is 20cm. The inserted pile is set at the bottom of the horizontal plate 32.

[0031] The inserted pile includes a pile head 34 and a pile body 35. The bottom of the pile head 34 is tapered to facilitate the insertion of the pile head 34 into the soil. The cross section of the pile body 35 is rectangular and fixedly connected to the top of the pile head 34. The rectangular pile body 35 has a side length of 20 cm and a length of 4-6 m. The entire inserted pile is located at the lower part of the entire slope protection structure, passes through the potential sliding surface of the embankment slope 1, and an inserted pile is arranged at intervals of 5 m along the horizontal direction of the foot of the embankment slope 1.

[0032] In this embodiment, the assembled pile plate 3 is a prefabricated component, which is formed by integrally casting concrete in a factory with inserted piles, vertical plates 31, horizontal plates 32 and triangular plates 33.

[0033] like Figure 3 As shown, adjacent assembled pile plates 3 are connected to each other by plugging and inlaying, and adjacent assembled pile plates 3 are provided with expansion joints with a width of 0.5 cm.

[0034] In this embodiment, the backfill material 4 includes backfill soil and crushed stone, and the crushed stone is laid on the top of the backfill soil.

[0035] The construction steps of the governance structure in this embodiment are as follows:

[0036] Step S1, tidy up the foot of the slope, remove the debris on the surface of the foot of the slope, and arrange the road and the machine material storage area;

[0037] Step S2: Materials and machinery are brought in to the construction site. The assembled pile panels 3 are transported from the factory to the construction site. Machinery teams are brought in to the construction site and placed according to the plan layout.

[0038] Step S3, using an excavator to dig at the foot of the slope, digging a construction trench 2 with a width of 2m and a depth equal to the distance from the slope surface to the potential sliding surface of the slope, and placing retaining boards with smooth surfaces on both sides of the construction trench 1 close to the embankment slope 1 for support;

[0039] Step S4, using a total station to lay out the center point of each inserted pile according to the design drawings, laying out the four corner points of each inserted pile, determining the exact position of the pile hole and making positioning marks, after the layout is completed, the mutual positions of the adjacent hole piles are distanced and the pile positions are checked;

[0040] Step S5, the pile driver is in place to lift the assembled pile plate 3 to the position of the inserted pile determined in step S4, and the position is checked, and then the pile is pressed, and the inserted pile is pressed into the designed marked position, and the pile position is checked again;

[0041] Further, the marking line position is to draw a marking line at a depth of 1.5m from the top of the vertical plate 31 on the inserted pile;

[0042] Step S6: Repeat step S5 to press the piles at the position of the pile driver until all the assembled pile plates 3 are pressed into the designed positions according to the design drawings;

[0043] Step S7, pull out the retaining plate placed in step S3, then backfill the construction trench 2 and lay a layer of crushed stone on the surface of the residual soil filled in above.

[0044] Compared with the existing mortar-laid block stone retaining wall and cast-in-place reinforced concrete gravity retaining wall, the management structure in this embodiment reduces the large-scale excavation of the embankment slope 1 during construction, thereby not causing further disturbance to the stability of the original embankment soil, destroying the stress balance state of the original soil, and avoiding the possibility of instability and damage to the original high slope; and the use of prefabricated components for direct on-site hoisting construction is simple, the construction period is short, and the project cost is low.

[0045] The assembled pile plate 3 in this embodiment is provided with a vertical plate 31, a horizontal plate 32 and a triangular plate 33, which can transfer the shear force and bending moment generated by the slope soil to the horizontal plate 32 through the vertical plate 31 and the triangular plate 33, and convert them into pressure on the soil, thereby effectively dealing with the shear force and bending moment generated by the slope soil. At the same time, the assembled pile plate 3 is provided with prestressed steel bars inside, which can effectively resist part of the tensile force caused by the bending moment, thereby avoiding damage to the structure due to resistance to excessive shear force and bending moment. Compared with the existing structure, the structural size is reduced, thereby reducing the project cost.

[0046] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0047] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be construed as limiting the scope of the patent application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent application shall be subject to the attached claims.

Claims

1. A slope embankment push-type landslide control structure, characterized in that: The invention comprises an embankment slope (1), wherein a construction ditch (2) is arranged at the foot of the embankment slope (1), the construction ditch (2) is located at the bottom of the potential sliding surface of the embankment slope (1), an assembled pile plate (3) is arranged in the construction ditch (2), the bottom of the assembled pile plate (3) is inserted into the soil, and the upper part thereof extends along the axial direction of the construction ditch (2), and backfill material (4) is arranged between the construction ditch (2) and the assembled pile plate (3).

2. The slope embankment push-type landslide control structure according to claim 1 is characterized in that: The construction trench (2) is parallel to the extension direction of the bottom of the embankment slope (1).

3. The slope embankment push-type landslide control structure according to claim 1 is characterized in that: The depth of the construction trench (2) is the distance from the slope surface to the potential sliding surface of the embankment slope (1).

4. The slope embankment push-type landslide control structure according to claim 1 is characterized in that: The assembled pile plates (3) include a plurality of adjacent assembled pile plates (3) which are plugged into each other. The assembled pile plates include an insertion pile, a vertical plate (31), a horizontal plate (32) and a triangular plate (33). The vertical plate (31) is arranged perpendicular to the ground. The horizontal plate (32) is fixedly connected to the bottom of the vertical plate (31) away from the embankment slope (1). The triangular plate (33) is arranged between the vertical plate (31) and the horizontal plate (32). The insertion pile is arranged at the bottom of the horizontal plate (32).

5. The slope embankment push-type landslide control structure according to claim 4 is characterized in that: Expansion joints are provided between adjacent assembled pile plates (3).

6. The slope embankment push-type landslide control structure according to claim 4 is characterized in that: The inserted pile comprises a pile head (34) and a pile body (35), the bottom of the pile head (34) is conical, and the cross section of the pile body (35) is rectangular and fixedly connected to the top of the pile head (34).

7. The slope embankment push-type landslide control structure according to claim 1 is characterized in that: The backfill material (4) comprises backfill soil and crushed stone, and the crushed stone is laid on the top of the backfill soil.