Ground source heat pump deep foundation pit horizontal pipe climbing device

By designing a deep foundation pit horizontal pipe climbing device of ground source heat pump with pulleys and rope systems, the problems of low efficiency of manual improvement, friction damage and safety risks in the prior art are solved, and efficient and safe horizontal pipe lifting and protection are achieved.

CN222630924UActive Publication Date: 2025-03-18BGI ENG CONSULTANTS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421385151.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-03-18
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

In the prior art, the horizontal pipe is raised along the side wall of the foundation pit to above the foundation pit by manually pulling the rope, which has problems such as low working efficiency, long working time, pipeline friction damage and operational safety risks.

Method used

A ground source heat pump deep foundation pit horizontal pipe climbing device is designed, and the pulley and rope system are used instead of manpower to lift the horizontal pipe. The side wall of the foundation pit is probed out through the main body of the device to avoid pipe friction, and the horizontal pipe is fixed on the cross beam to prevent falling.

Benefits of technology

It improves construction efficiency, protects pipes and insulation layers, reduces construction difficulty and safety risks, and improves construction quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222630924U_ABST
    Figure CN222630924U_ABST
Patent Text Reader

Abstract

The utility model discloses a ground source heat pump deep foundation pit horizontal pipe climbing device, which belongs to the technical field of horizontal pipe climbing, and comprises a device main body, a pulley is fixed on the end point of one side of the device main body, the pulley is positioned at the upper part in a foundation pit, and a rope lowered to the bottom of the foundation pit is wound on the pulley. According to the ground source heat pump deep foundation pit horizontal pipe climbing device, in the lifting process of the horizontal pipe section, due to the fact that the device body extends out of the side wall of the foundation pit by a certain distance, friction between the horizontal pipe section and the side wall of the foundation pit and between the horizontal pipe section and a coping beam is effectively avoided, so that the pipe and a heat preservation layer are protected, and the construction quality is improved; the horizontal pipe section is fixed to the cross beam, the horizontal pipe is effectively prevented from falling, the construction quality is improved, the pulley is used for replacing manpower to lift the horizontal pipe section, and therefore the construction process is simplified, the construction efficiency is improved, the construction difficulty is reduced, and the construction safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of horizontal pipe climbing, in particular to a horizontal pipe climbing device for a deep foundation pit of a ground source heat pump. Background Art

[0002] In the process of climbing the horizontal pipe of the ground source heat pump system in a deep foundation pit, the horizontal pipe head is often connected to a rope, and then the horizontal pipe is lifted to the top of the foundation pit along the side wall of the foundation pit by manually pulling the rope. This method has the problems of low work efficiency and long operation time. In the process of manually lifting the horizontal pipe, friction between the pipe and the top beam of the foundation pit will be caused, which will damage the insulation layer and the horizontal pipe itself. In the edge working environment, the operator also faces certain safety risks. There is currently no solution to this problem. In order to solve the above problems, the utility model proposes a climbing device for the horizontal pipe of a deep foundation pit of a ground source heat pump. Summary of the invention

[0003] 1. Technical issues to be resolved

[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a horizontal pipe climbing device for a deep foundation pit of a ground source heat pump, which solves the problem of lifting the horizontal pipe along the side wall of the foundation pit to the top of the foundation pit by manually pulling the rope. This method has the problems of low work efficiency and long operation time; and in the process of manually lifting the horizontal pipe, friction between the pipe and the top beam of the foundation pit will be caused, which will cause damage to the insulation layer and the horizontal pipe itself; in the edge working environment, the operator also faces certain safety risks.

[0005] (II) Technical solution

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a ground source heat pump deep foundation pit horizontal pipe climbing device, comprising a device body, a pulley is fixed on the end point of the device body on the side close to the foundation pit, the pulley is located above the inside of the foundation pit, and a rope is wound around the pulley and lowered to the bottom of the foundation pit, and a weight is fixed to one end of the rope extending into the bottom of the foundation pit.

[0007] As a further solution of the utility model: the device body is arranged on the surface of the horizontal section beam and is detachably connected thereto, and the horizontal section beam is arranged on a plurality of longitudinal supports on the hardened ground.

[0008] As a further solution of the utility model: a device bracket is arranged below the device body at a side close to the foundation pit, and the device bracket is placed above the retaining wall or hardened ground.

[0009] As a further solution of the utility model: one end of the rope connected to the weight is connected to the horizontal tube.

[0010] (III) Beneficial effects

[0011] Compared with the prior art, the beneficial effects of the utility model are:

[0012] The ground source heat pump deep foundation pit horizontal pipe climbing device effectively avoids the friction between the horizontal pipe section and the side wall of the foundation pit and the top beam by protruding the main body of the device for a certain distance during the lifting process of the horizontal pipe section, thereby protecting the pipe material and the insulation layer and improving the construction quality. After the horizontal pipe section is lifted to the top of the foundation pit, the horizontal pipe section is fixed to the cross beam to effectively prevent the horizontal pipe from falling and improve the construction quality. Secondly, the pulley is used to replace manpower to lift the horizontal pipe section, thereby simplifying the construction process, improving construction efficiency, reducing construction difficulty and improving construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the structure of the plane of the utility model;

[0014] Figure 2 This is a structural schematic diagram of the process of lifting a horizontal pipe with a rope according to the utility model;

[0015] Figure 3 This is a structural schematic diagram of the utility model lifting device connected to a foundation pit with a retaining wall;

[0016] Figure 4 This is a structural schematic diagram of the utility model lifting device connected to a foundation pit without a retaining wall;

[0017] Figure 5 This is a schematic diagram of the structure of the utility model after multiple horizontal pipes are laid;

[0018] Figure 6 A schematic diagram of the structure of a temporary material yard built for the utility model;

[0019] In the figure: 1. device body; 2. pulley; 3. rope; 4. horizontal section beam; 5. device bracket. DETAILED DESCRIPTION

[0020] The technical solution of this patent is further described in detail below in conjunction with specific implementation methods. Example

[0021] like Figure 1-3As shown, a ground source heat pump deep foundation pit horizontal pipe climbing device includes a device body 1. The end point of the device body 1 protruding from the edge of the foundation pit should be between the vertical plane where the crown beam is located and the vertical plane where the vertical section beam is located. The device body 1 is arranged on the surface of the horizontal section beam 4 and is detachably connected thereto. In order to be able to move to the corresponding position when hoisting horizontal pipes in different positions, the horizontal section beam 4 is arranged on multiple longitudinal supports. The longitudinal supports can play the role of erecting and fixing the horizontal section beam 4 to maintain the stability of the horizontal section beam 4, and multiple longitudinal supports are installed on the hardened ground for erecting the horizontal section beam 4 It is assumed that a capping beam is arranged above the retaining wall, and a crown beam is arranged between the retaining wall and the ground-connected wall. Multiple groups of cross arms are arranged on the ground-connected wall and the retaining wall. A vertical cross beam is fixedly installed on each group of cross arms. The length of the cross arm above the crown beam should be equal to the sum of the length of the cross arm below the crown beam and the width of the crown beam. The cross arm can play a role in erecting and fixing the vertical cross beam, and each diagonal arm can support the cross arm to improve the supporting strength of the cross arm. Secondly, the cross arm, the diagonal arm and the wall form a triangular structure, which can improve the strength. The end point of the cross arm above the crown beam should be at the same position as the end point of the cross arm below the crown beam. Vertical plane, the number of each group of cross arms is multiple, the end points of the cross arms located on the side walls of the foundation pit should all be in the same vertical plane, and an inclined arm is fixedly installed below the cross arm, the inclined arm located at the retaining wall is installed on the retaining wall, and the inclined arm located on the ground-connected wall is installed on the ground-connected wall. A pulley 2 is fixed on the end point on one side of the device body 1, and the pulley 2 is used to replace manpower to lift the horizontal pipe section, thereby simplifying the construction process and improving construction efficiency. The pulley 2 is located above the inside of the foundation pit, and a rope 3 lowered to the bottom of the foundation pit is wound around the pulley 2, one end of the rope 3 connected to the weight is connected to the horizontal pipe, and one end of the horizontal pipe is bent and passed through It is fixed by a fixing piece. At this time, the bending point of the horizontal pipe can be used as the lifting point of the rope 3 for lifting the horizontal pipe. The length of the rope 3 should be greater than the depth of the foundation pit. An insulation layer is arranged outside the horizontal pipe for protection. A weight is fixed at one end of the rope 3 extending into the bottom of the foundation pit. The weight can facilitate the rope to be lowered to the bottom of the foundation pit. A device bracket 5 is arranged below the device body 1. The device bracket 5 is placed above the retaining wall or hardened ground. The device body 1 can be supported by the device bracket 5, so as to maintain the stability of the device body 1. The height of the device bracket 5 should be equal to the sum of the longitudinal support height and the height of the horizontal section beam 4. Example

[0022] On the basis of Example 1, Figure 4As shown, the device body 1 is arranged on the surface of the horizontal section beam 4 and is detachably connected thereto, so that it can be moved to the corresponding position when hoisting horizontal pipes in different positions; the horizontal section beam 4 is arranged on multiple longitudinal supports, and multiple longitudinal supports are installed on the hardened ground for erecting the horizontal section beam 4, and a top beam is also arranged above the ground-connected wall, and the ground-connected wall is provided with multiple groups of cross arms, each group of cross arms is fixedly installed with a vertical section beam, and the number of each group of cross arms is multiple, and an oblique arm is fixedly installed under the cross arm, and the oblique arm is installed on the ground-connected wall, and the end point on one side of the device body 1 A pulley 2 is fixed on it, and the pulley 2 is located above the inside of the foundation pit, and a rope 3 is wound on the pulley 2 and lowered to the bottom of the foundation pit. One end of the rope 3 connected to the weight is connected to the horizontal pipe, and one end of the horizontal pipe is bent and fixed by a fixing piece. At this time, the bending point of the horizontal pipe can be used as a lifting point of the rope 3 for lifting the horizontal pipe. An insulation layer is arranged outside the horizontal pipe for protection. A weight is fixed on one end of the rope 3 extending into the bottom of the foundation pit, and a device bracket 5 is arranged below the device body 1 near one side of the foundation pit, and the device bracket 5 is placed above the retaining wall or hardened ground.

[0023] The working principle of the utility model is as follows: before using the horizontal pipe climbing device of the deep foundation pit ground source heat pump system to lift the horizontal pipe, a horizontal pipe section used to climb the side wall of the foundation pit should be covered with an insulation layer. After covering the horizontal pipe section with the insulation layer, the horizontal pipe section is ready to be lifted to one end of the edge of the foundation pit and folded back to a certain length, fixed with a fixing piece, and after folding back to a certain length and fixing at the end point of the horizontal pipe, the pulley 2 located above the foundation pit lowers the rope 3 through the gaps between each vertical section beam and the side wall of the foundation pit to the bottom of the foundation pit under the action of a heavy object, and then connects with the horizontal pipe head. After the rope 3 is connected with the horizontal pipe head, the horizontal pipe is lifted to the top of the foundation pit by pulling the rope 3 in a horizontal state above the foundation pit. After the horizontal pipe section is lifted to the top of the foundation pit by the rope 3, the horizontal pipe section is fixed to the horizontal section beam 4. When lifting horizontal pipes at different positions, the device should be moved to the corresponding position in advance.

[0024] After all horizontal pipes are lifted, people are then lifted to the height of the vertical beams on the side walls of the foundation pit by means of a crane or other means, and the horizontal pipe sections are further fixed. After all horizontal pipe sections are lifted to the top of the foundation pit and fixed to the horizontal beams 4 (such as Figure 5 ), trim and organize all pipe sections, and build a temporary material yard (such as Figure 6 ) is used for finished product protection of horizontal pipe sections and is removed after the horizontal pipe sections are connected to the manifold.

[0025] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0026] The above describes in detail the preferred implementation of this patent, but this patent is not limited to the above implementation. Various changes can be made within the knowledge scope of ordinary technicians in this field without departing from the purpose of this patent.

Claims

1. A ground source heat pump deep foundation pit horizontal pipe climbing device, comprising a device body (1), characterized in that: A pulley (2) is fixed at an end point on one side of the device body (1), the pulley (2) is located above the inside of the foundation pit, and a rope (3) is wound around the pulley (2) and lowered to the bottom of the foundation pit, and a weight is fixed to one end of the rope (3) extending into the bottom of the foundation pit.

2. A ground source heat pump deep foundation pit horizontal pipe climbing device according to claim 1, characterized in that: The device body (1) is arranged on the surface of a horizontal section crossbeam (4) and is detachably connected thereto; the horizontal section crossbeam (4) is arranged on a plurality of longitudinal supports on a hardened ground.

3. A ground source heat pump deep foundation pit horizontal pipe climbing device according to claim 2, characterized in that: A device bracket (5) is provided below the device body (1) and close to one side of the foundation pit, and the device bracket (5) is placed above the retaining wall or hardened ground.

4. A ground source heat pump deep foundation pit horizontal pipe climbing device according to claim 1, characterized in that: One end of the rope (3) connected to the weight is connected to the horizontal tube.