Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

5results about How to "Reduce perfusion" patented technology

A grouting repair device and method for defects in brick coal gas ducts

This invention discloses a grouting repair device and method for defects in brick gas ducts. The repair device includes a tee pipe, a grouting pipeline, a grouting mechanism, a drain valve, and a grouting connector. The grouting connector has an internal connecting pipe, which is connected to a long grouting pipe. This grouting repair device can repair defects such as fractures, cracks, and breaks in brick gas ducts, especially defects whose specific locations cannot be determined. During use, this grouting repair device does not require prior detection of the defect location, allowing for direct blind repair without worrying about missing any defects. It is not limited by the number and size of defects in the brick gas duct, resulting in high repair efficiency and good effect.
Owner:WUHAN IRON & STEEL GRP ECHENG IRON & STEEL CO LTD

Method for determining the charge of a refrigerant for a refrigerator refrigeration system and controller

ActiveCN117663656Boptimal perfusion volumereduce opening
The application provides a refrigerant filling quantity determination method and a controller for a refrigerator refrigerating system, and belongs to the technical field of refrigerator refrigerant filling. The method comprises the following steps: adjusting the opening degree of a first electronic expansion valve to the maximum, and controlling the compressor to continuously and uninterruptedly refrigerate; collecting the refrigeration chamber temperature and the freezing chamber temperature of the refrigerator, determining the refrigeration chamber temperature and the freezing chamber temperature when the refrigeration chamber temperature and the freezing chamber temperature are stable, recording the refrigeration chamber temperature and the freezing chamber temperature, and collecting the inlet temperature and the outlet temperature of a first evaporator; determining the optimal opening degree of the first electronic expansion valve according to the recorded refrigeration chamber temperature and freezing chamber temperature; controlling the opening degree of the first electronic expansion valve to remain at the optimal opening degree; and determining the optimal filling quantity of the refrigerant according to the temperature difference between the outlet temperature and the inlet temperature of the first evaporator. The method can make the refrigerator refrigerating system have the optimal refrigerant filling quantity.
Owner:CHONGQING HAIER REFRIGERATION ELECTRIC APPLIANCE CO LTD +2

A two-stage condensation evaporation heat exchange system used in a cascade refrigeration system / phase change heat transfer cooling system

The present invention provides a two-stage condensation evaporation heat exchange system applied in a cascade refrigeration system / phase change heat transfer system, specifically relating to the field of refrigeration technology, wherein the condensation evaporation heat exchange system is provided with a first heat exchanger, a second heat exchanger, and a throttling expansion component, and when applied in a cascade refrigeration system or a phase change heat transfer system, the refrigerant in the condensed state in the high-temperature refrigeration system is supercooled inside the second heat exchanger, and enters the first heat exchanger for evaporation refrigeration after throttling expansion by the throttling expansion component, and exchanges heat with the opposite low-temperature refrigeration system or the phase change heat transfer system, and the return air containing the unevaporated refrigerant enters the second heat exchanger, and enters the high-temperature refrigeration cycle after obtaining a certain degree of superheat in the second heat exchanger. The system reduces the heat exchange temperature difference at the condensation end and simplifies the high-temperature refrigeration system, while solving the technical problem of large and unstable heat exchange temperature difference caused by the required superheat at the end of the heat exchanger.
Owner:马进 +1

Grouting repair device and grouting repair method for defect position of brick gas passage

The invention discloses a brick gas passage defect position grouting repair device and method, the repair device comprises a three-way pipe, a grouting pipeline, a grouting mechanism, a discharge valve and a grouting butt joint pipe, the grouting butt joint pipe is internally provided with a connecting pipe, and the connecting pipe is connected with a long grout overflowing pipe; according to the grouting repairing device for the defect position of the brick gas channel, the defects such as fracture, cracks and damage in the brick gas channel can be repaired, and particularly, the defects of which the specific positions cannot be determined are perfectly repaired; in the using process of the grouting repairing device, defect positions do not need to be detected in advance, direct blind repairing is achieved without worrying about missing of the defect positions, the grouting repairing device is not limited by the number and size of defects in the brick gas channel, repairing efficiency is high, and the effect is good.
Owner:WUHAN IRON & STEEL GRP ECHENG IRON & STEEL CO LTD

Large-span photovoltaic support arranged on steep collapsible loess slope

The application discloses a large-span photovoltaic support arranged on a steep collapsible loess mountain slope, and solves the problem of how to construct a support pile foundation system suitable for the collapsible loess mountain slope; a slope bottom PVC corrugated pipe pile is arranged at the slope bottom of the collapsible loess mountain slope (1), and a truss is hoisted on the slope bottom corrugated pipe pile, a middle pile foundation and the slope top corrugated pipe pile; the lower end of the truss is connected to a first triangular connecting piece (9), the upper end of the truss is connected to a second triangular connecting piece (16), and a middle triangular connecting piece (22) is connected to a large-span photovoltaic support body (24) through two clamping plates (23); X-shaped arrangement of a cable-stayed anchor cable is arranged between two adjacent trusses, and an inclined cable-stayed anchor cable is arranged between each pile foundation and the top end of the truss opposite to the foundation; and the X-shaped arrangement of the cable-stayed anchor cable and the inclined cable-stayed anchor cable enable the whole large-width support to form a stable box frame structure.
Owner:SHANXI ELECTRIC POWER CONSTR CO LTD (CEEC)