Technique for quickly reinforcing soft soil foundation
A soft soil foundation and technical technology, applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of time-consuming and high cost, and achieve the effects of shortening the construction period, lowering the groundwater level, and saving costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0013] Such as figure 1 As shown, the construction process of the air-permeable layer without sand inclusions on the soft soil foundation:
[0014] ①Clear and level the surface of the soft soil foundation.
[0015] ② Arrange horizontal and vertical drainage facilities on the reinforced site to form a three-dimensional drainage system, arrange sealing membranes, use pumps and vacuum pumps to pump water along the drainage system, and carry out vacuum preloading for about 30 days to promote the soft soil foundation to partially consolidate. Consolidation degree reaches more than 70%.
[0016] ③ Unloading, peel off the vacuum preloaded sealing film.
[0017] ④ Carry out strong compaction, heavy compaction or compaction construction.
[0018] Before dynamic compaction, heavy compaction or compaction reinforcement, a representative site should be selected for trial compaction to determine the construction technology and construction parameters of dynamic compaction, heavy compact...
Embodiment 2
[0021] Such as figure 2 As shown, the construction process of the air-permeable layer with sand inclusions on the soft soil foundation:
[0022] ①Clear and level the surface of the soft soil foundation.
[0023] ②At the boundary of the reinforced site, for the sections with permeable and air layers within 10 meters underground, continuously lap the silt mixing piles and insert plastic sealing films to form a sealing wall for sealing.
[0024] ③ Arrange horizontal and vertical drainage facilities to form a three-dimensional drainage system, arrange sealing membranes, use pumps and vacuum pumps to pump water along the drainage system, and carry out vacuum preloading for about 30 days to promote the soft soil foundation to achieve partial consolidation. The degree reaches more than 70%.
[0025] ④ Unloading, peel off the vacuum preloaded sealing film.
[0026] ⑤ In order to ensure that the groundwater level will not rise during the process of dynamic compaction, heavy compact...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com