Frequency domain resource scheduling method and device
A frequency-domain resource scheduling and frequency-domain resource technology, applied in the field of frequency-domain resource scheduling methods and devices, can solve the problems of slow processing speed and low efficiency, and achieve the effect of improving scheduling speed and efficiency and reducing time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0090] Example 1: The scheduling parameter values corresponding to the scheduling function are: resource allocation type 0, newly transmitted packet, single codeword, codeword has not been scheduled; at this time, the implementation process of frequency domain resource scheduling for the UE described in this step Such as Image 6 Shown, including:
[0091] Step 601: Obtain the first subband in the set of subbands with the largest CQI value;
[0092] Step 602: Determine whether the two RBGs of the current subband are both occupied, if yes, obtain the next subband, and perform the determination in step 602; otherwise, perform step 604.
[0093] Wherein, the acquisition of the next subband has different processing in different situations:
[0094] Wherein, when the current subband is the last subband in the subband set, acquiring the next subband is acquiring the first subband in the subband set corresponding to (current CQI value -1);
[0095] However, when the current subband is not t...
example 2
[0112] Example 2: The scheduling function is: resource allocation type 1, new transmission packet, single codeword, and the codeword has not been scheduled before; at this time, the implementation process of frequency domain resource scheduling for the UE described in this step is as follows: Figure 7 Shown, including:
[0113] Step 701: Obtain the first subband in the set of subbands with the largest CQI value;
[0114] Step 702: Determine whether there is an idle PRB in the current subband, if yes, perform step 703; otherwise, obtain the next subband, and perform the determination of step 702.
[0115] Wherein, the acquisition of the next subband has different processing in different situations:
[0116] Wherein, when the current subband is the last subband in the subband set, acquiring the next subband is acquiring the first subband in the subband set corresponding to (current CQI value -1);
[0117] However, when the current subband is not the last subband in the subband set, the n...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com