Method and system for controlling changing of software project test requirements

A technology for testing requirements and software projects, which is applied in the field of controlling changes in testing requirements of software projects, can solve problems such as lack of comprehensive coverage of new requirements testing, difficulty in control, project delays, etc., to improve test coverage and efficiency, simplify testing work, and accurately The effect of control

Active Publication Date: 2012-03-07
刘成
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In response to this situation, the current solution is as follows: First, most project leaders now also require corresponding personnel to add requirements change documents to manage requirements changes, so that test requirements are updated accordingly, but this method The efficiency is low, and it is difficult to control; second, although the test requirements can be updated, there is no clear document description for which module functions are added for the update of the requirements, and often test executives who do not understand the business will miss the test functions, resulting in The testing of new requirements does not cover comprehensively, which will take more time to find, waste time, and even lead to project delays in severe cases

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and system for controlling changing of software project test requirements
  • Method and system for controlling changing of software project test requirements
  • Method and system for controlling changing of software project test requirements

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] Below in conjunction with accompanying drawing and specific embodiment, further illustrate the present invention, should be understood that these embodiments are only for illustrating the present invention and are not intended to limit the scope of the present invention, after having read the present invention, those skilled in the art will understand various aspects of the present invention Modifications in equivalent forms all fall within the scope defined by the appended claims of this application.

[0018] Such as figure 1 As shown, the method for controlling changes in software project testing requirements includes the following steps:

[0019] (1) Define the fields of the software project test requirements before and after the change in the form of Microsoft Office Excel files, where the software project test requirements before and after the change include requirement ID, requirement description, requirement name, requirement creation date, requirement time, requ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method and system for controlling the changing of software project test requirements. By the method, requirement IDs (identifiers) of the software project test requirements before and after the changing are compared one by one, and then requirement descriptions and requirement names of the software project test requirements before and after the changing are compared one by one to identify functions of changed requirement names, so that a tester can comprehensively control the whole test process and know fairly well, test coverage can be widened and test efficiency can be improved. The system associates the software project test requirements in form of Microsoft Office Excel file before and after the changing by an association module, identifies each field of the software project test requirements and the requirement IDs of the software project test requirements before and after the changing by a requirement ID identification module, and automatically displays the functions of the changed requirement names to the tester by a requirement description comparison module, a requirement name extraction module and a display module. The test work of the tester is simplified, and simultaneously, the tester can comprehensively and accurately control the changing of the software project test requirements.

Description

technical field [0001] The invention relates to a method and system for controlling changes in testing requirements of software items, belonging to the field of computer software testing. Background technique [0002] In the process of software project testing, especially in the Internet field, whether it is the early stage or the late stage of the software project testing process, there will always be the problem of requirement changes. Once the software project testing requirements change and modify, the corresponding project testing during the testing process Requirements have changed accordingly. Since most of the company's internal product demand changes are only notified verbally or by email, there is no internal review and records of related demand changes, resulting in increased demand for some subsequent products, and some did not increase . This will lead to incomplete information obtained from the test and difficulties in maintaining subsequent products. The tw...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F11/36
Inventor 于建珠艾顺刚姚进德
Owner 刘成
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products