Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork

A technology of reinforced concrete and construction methods, which is applied in the direction of bridges, bridge construction, erection/assembly of bridges, etc., which can solve the problems of support affecting traffic, short construction period, and restrictions, and achieve beautiful site environment, beautiful structure, and satisfactory lifting capacity Effect

Active Publication Date: 2014-04-16
CHINA RAILWAY 11TH BUREAU GRP +1
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This construction method solves the traffic problem caused by the land occupation of the bracket, the construction period is short, and the impact on the site environment is also small. Although the hoisting after the overall prefabrication can well ensure the appearance and the site environment, it is greatly affected by the hoisting capacity
In some cities, the cover beams of multi-lane elevated roads need to be set to more than 30 meters across the bridge to meet the needs of the lanes, and the width along the bridge is only about 1 / 10 of the length of the transverse bridge. The structure is generally prestressed steel Concrete, with a weight of about 1000t, and a large aspect ratio of the structure, makes hoisting more difficult. This construction method is increasingly limited by transportation facilities and hoisting space, and its applicability is limited

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
  • Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork
  • Construction method for huge capping beam utilizing reinforced concrete thin wall as permanent formwork

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0023] The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention.

[0024] One embodiment of the construction method of the giant cap beam using reinforced concrete thin walls as permanent formwork of the present invention includes the following steps:

[0025] Step 1: Divide the cover beam template into center block thin wall 1, left block thin wall 2 and right block thin wall 3 (such as figure 1 As shown), prefabricated in the prefabricated yard. The cover beam formwork is a reinforced concrete thin-walled structure, that is, the center block thin wall 1, the left block thin wall 2 and the right block thin wall 3 are all made of reinforced concrete, and various requirements for hoisting are pre-embedded member. The thickness of the thin-walled prefabrication is between 25-50cm. The specific thickness is determined according to the lifting capacity to ensure that the total...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A construction method for a huge capping beam utilizing a reinforced concrete thin wall as a permanent formwork comprises the following steps: (1), prefabricating and forming a center block thin wall, a left block thin wall and a right block thin wall in a prefabricating field; (2) conveying the prefabricated thin walls to a construction field; and (3), performing hoisting, fitting installation and internal concrete pouring in the field. The step (3) particularly comprises the following steps of (A) hoisting the center block thin wall to the position of a pier top; (B) binding reinforcing steel bars in the center block thin wall and then pouring concrete; (C) hoisting the left block thin wall and the right block thin wall, aligning the left block thin wall and the right block thin wall with the center block thin wall, then smearing epoxy resin on abutted surfaces, respectively arranging temporary prestressed tendons and oppositely pulled prestressed tendons on the outer sides and the tops of the thin walls and tensioning the oppositely pulled prestressed tendons; and (D) tensioning the temporary prestressed tendons, then binding reinforcing steel bars in the left block thin wall and the right block thin wall, and performing concrete pouring. The construction method can simultaneously guarantee hoisting ability, little influence on field environments and structural attractiveness.

Description

Technical field [0001] The invention relates to the technical field of bridge construction, in particular to a construction method of a giant cap beam using a reinforced concrete thin wall as a permanent template. Background technique [0002] Most of the bridges built in our country are simply supported beam bridges. Simply supported beam bridges generally have cap beams on the top of the piers and use cap beams as the supporting platform for the beam slab. Therefore, the cap beam is the main force-bearing component of the simply supported beam bridge. . Generally, the construction of the cap beam is generally realized by the construction method of pouring concrete on site or hoisting in place after the whole prefabrication. [0003] With the increasing requirements of urban construction, the appearance of the cast-in-place structure itself cannot meet people's visual requirements, and the on-site casting still has the problems of large area, high risk and serious on-site polluti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
Inventor 王鹏唐达昆张旭东刘国雄周劲松王更峰胡小银赛铁兵汪婧
Owner CHINA RAILWAY 11TH BUREAU GRP