Method for flexibly scheduling passenger trains in high-speed rail network under random demand conditions

A technology for high-speed railways and trains, applied in the field of flexible scheduling of passenger trains, can solve the problems that the rules are not necessarily reliable, can not fully meet the passenger demand, the passenger flow changes and the required transportation capacity are quite different, etc. Low cost and wide application range

Inactive Publication Date: 2013-08-14
BEIJING JIAOTONG UNIV
View PDF3 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, at present, the preparation of train operation plans in my country's high-speed rail network mainly depends on the fixed passenger flow, and the daily passenger capacity is fixed.
In the actual scheduling work, although the change of passenger flow has a certain pattern in a large range, this pattern is not necessarily reliable in certain periods of time, and ther

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for flexibly scheduling passenger trains in high-speed rail network under random demand conditions
  • Method for flexibly scheduling passenger trains in high-speed rail network under random demand conditions
  • Method for flexibly scheduling passenger trains in high-speed rail network under random demand conditions

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The flexible passenger train scheduling in the high-speed railway network under stochastic demand conditions is based on the passenger demand in the future to conduct train scheduling, so that the trains in the road network can be utilized to the greatest extent. The establishment of this dispatching method model starts from the perspective of the railway operation department, and takes the maximum benefit of the operation department as the objective function. It consists of two parts: one is the operating income. When the road network system cannot meet the needs of passengers, the Penalty value; the second is operating costs, including fixed costs and variable costs. Among them, fixed costs are mainly the depreciation and maintenance costs of fixed assets such as railway lines and trains, and variable costs are mainly the kilometers of high-speed rail trains, train stops, passenger transfer organization fees, and train unit kilometers. consumption etc.

[0039] Attac...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a method for flexibly scheduling passenger trains in a high-speed rail network under random demand conditions. The method is built on the basis of optimizing a daily road section passenger capacity supply model, takes random variation conditions of passenger flow, limitation of quantity of motor train units put in the high-speed rail network, seating capacity of trains, passenger stranding conditions in stations and the like into consideration and takes the passenger capacity of road sections put into use as a decision variable and the quantity of passengers as a random variable to build a model for flexibly scheduling the passenger trains in the high-speed rail network under the random demand conditions. A flexible passenger train scheduling scheme meeting different passenger demands is obtained by solving the model, thus providing a theoretical reference for a decision maker to schedulethe passenger trains in the high-speed rail network.

Description

technical field [0001] The invention relates to a method for flexible scheduling of passenger trains in a high-speed railway network under random demand conditions. Background technique [0002] The train operation in the high-speed rail network has the requirements of high speed, high density, high punctuality rate and high safety. Since Japan built the world's first high-speed rail, the Tokaido Shinkansen, in 1964 and put it into operation successfully, high-speed rail has grown rapidly around the world due to its high-efficiency economic and social benefits. my country's high-speed rail is also in a stage of rapid growth. According to the requirements of my country's "Medium and Long-term Railway Network Planning", by 2020, more than 16,000 kilometers of high-speed lines will be built to form the basic framework of my country's high-speed rail network to solve the transportation of my country's main railways. capacity tension. [0003] For high-speed rail network operato...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/00
Inventor 曹成铉许琰李克平杨立兴李想
Owner BEIJING JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products