Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum

A construction method and plastering layer technology are applied in the field of building wall decoration, which can solve problems such as reducing the occupied area, and achieve the effects of reducing the occupied area, convenient and quick construction, and reducing the workload of cleaning.

Active Publication Date: 2014-07-02
DONGGUAN JIANZHIDU CONSTR ENG +1
View PDF7 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] This invention is aimed at the deficiencies of the current technology, and provides a construction method for recycling mortar and calibrating the construction reference of the plastering layer. By setting the construction ruler on the ground and the wall, the construction reference surface of the plastering layer is calibrated, and at the same time, it is effectively solved. Solved the problem of inlaying the anchor bricks, the inlaid anchor bricks will not cause the common problem of empty shells, the brick surface of the anchor bricks is flush with the surface of the plastering layer, which can reduce the occupied area and is not easy to accumulate dust

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum
  • Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum
  • Construction ruler and construction method for recycling mortar and calibrating plaster layer construction datum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] Example 1, see Figure 1 ~ Figure 3 , the mortar recovery provided by the invention and the construction method of demarcating plastering layer construction reference, it comprises the following steps:

[0031] (1) prepare construction ruler, and be used for fixing the anchor of this construction ruler, described construction ruler is provided with plastering layer construction datum part 11, vertical part 12 and mortar recovery part 13; Described plastering layer construction datum part 11, one end is connected to one end of the vertical part 12, and the other end of the vertical part 12 is connected to the mortar recovery part 13; the plastering layer construction reference part 11 is perpendicular to the vertical part 12, and the vertical part 12 The straight portion 12 is perpendicular to the mortar recovery portion 13;

[0032] (2) mark the construction ink line of plastering layer 24 on the metope, be provided with alignment datum point 25 on ground 22, described...

Embodiment 2

[0039] Example 2, see image 3 , Figure 4, the method and structure of this embodiment are basically the same as those of Embodiment 1, the difference being that the included angle 15 between the construction reference part 11 of the plastering layer and the horizontal plane is a demoulding slope of 10-20 degrees, that is, the plastering layer Layer construction datum portion 11 is inclined downwards at plastering layer 24, can like this after plastering layer 24 construction finishes, and the construction ruler 1 of mortar reclaiming and demarcating plastering layer construction datum can take out conveniently. The included angle 15 can be set according to the thickness of the plastering layer 24 to be constructed.

[0040] In the above-mentioned embodiment, the preparation of the construction ruler 1 for mortar recovery and calibration of the plastering layer construction reference is preferably a steel plate with a general specification of about 1900 mm in length and abou...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for recycling mortar and calibrating a plaster layer construction datum. The construction method includes: (1) manufacturing a construction ruler and anchor nails, wherein the construction ruler is provided with a plaster layer construction datum portion, a vertical portion and a mortar recycling portion; (2) fixing the construction ruler at a preset position via the anchor nails, wherein the plane of the vertical portion is a construction datum face of a plaster layer, and the sectional width of the construction datum face of the plaster layer is the construction datum width of the plaster layer; (3) constructing the plaster layer, and recycling mortar falling onto the mortar recycling portion effectively within an effective period of plaster construction until construction for the whole plaster layer of a wall is finished. The invention further discloses the construction ruler for implementing the construction method. According to the construction method, the construction datum face of the plaster layer is calibrated by the construction ruler, and the problem of paneling of anchor bricks is solved effectively.

Description

technical field [0001] The invention relates to the technical field of building wall surface decoration, in particular to a construction method and a construction ruler for recovering mortar and calibrating the construction reference of a plastering layer. Background technique [0002] Wall plastering in construction needs to rely on the reference points marked on the wall for construction. The conventional method is to make ash cakes every 1.6-1.8 meters on the wall, and after the ash cake mortar is collected, wipe out a 2.5-3 cm wide bar between the upper and lower ash cakes as a wall. The thickness of the bottom ash on the surface is standard. After the water is collected from the marked bars, put a mortar pad between the marked bars to level the marked bars and slightly higher than the marked bars, and then scrape the mortar according to the marked bars. [0003] In order to make the plastering of the wall more effective by mechanical spraying construction or manual con...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04F21/04
Inventor 黎磊落邝成子
Owner DONGGUAN JIANZHIDU CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products