A construction method and construction scale for recovering mortar and calibrating the construction standard of plastering layer
A construction method and plastering layer technology, which is applied in the field of building wall decoration, can solve the problems of reducing the occupied area, and achieve the effects of reducing the occupied area, reducing the cleaning workload, and being easy to prepare
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Example 1, see Figure 1 ~ Figure 3 , the mortar recovery provided by the invention and the construction method of demarcating plastering layer construction reference, it comprises the following steps:
[0031] (1) prepare construction ruler, and be used for fixing the anchor of this construction ruler, described construction ruler is provided with plastering layer construction datum part 11, vertical part 12 and mortar recovery part 13; Described plastering layer construction datum part 11, one end is connected to one end of the vertical part 12, and the other end of the vertical part 12 is connected to the mortar recovery part 13; the plastering layer construction reference part 11 is perpendicular to the vertical part 12, and the vertical part 12 The straight portion 12 is perpendicular to the mortar recovery portion 13;
[0032] (2) mark the construction ink line of plastering layer 24 on the metope, be provided with alignment datum point 25 on ground 22, described...
Embodiment 2
[0039] Example 2, see image 3 , Figure 4, the method and structure of this embodiment are basically the same as those of Embodiment 1, the difference being that the included angle 15 between the construction reference part 11 of the plastering layer and the horizontal plane is a demoulding slope of 10-20 degrees, that is, the plastering layer Layer construction datum portion 11 is inclined downwards at plastering layer 24, can like this after plastering layer 24 construction finishes, and the construction ruler 1 of mortar reclaiming and demarcating plastering layer construction datum can take out conveniently. The included angle 15 can be set according to the thickness of the plastering layer 24 to be constructed.
[0040] In the above-mentioned embodiment, the preparation of the construction ruler 1 for mortar recovery and calibration of the plastering layer construction reference is preferably a steel plate with a general specification of about 1900 mm in length and abou...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com