Construction method of using down-top method for excavating earthworks in top-down construction
A construction method and earthwork technology, which is applied in excavation, infrastructure engineering, construction, etc., can solve the problems of site pollution and low excavation rate, and achieve the effect of saving construction costs, saving costs, and widely promoting application prospects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0016] This example takes the R&F Yingkai Plaza project located in the core business district of Zhujiang New Town in Guangzhou as an example. The land area of the project is 7942m2, with a total construction area of 184204 m2, including 151573 m2 above ground, 32631 m2 underground, 65 floors above ground, 5 floors underground, skirting The depth of the foundation pit of the house is 24.45m, the depth of the foundation pit in the core tube is 30.9m, and the total height of the tower is 296.5m. The main structure is a frame-core tube structure, the core tube is a reinforced concrete structure, and the outer tube structure is a vertical support system composed of 16 steel tube concrete columns in the basement and 20 steel tube concrete columns on the ground; the horizontal structure of the outer frame basement adopts a reinforced concrete structure, and the outer frame The horizontal structure on the ground adopts the steel girder profiled steel structure. The basement ado...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com