Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37results about How to "Solve narrow problems" patented technology

Power generation and power consumption organizing method and device based on peak regulation assistance service market

ActiveCN106844916ASolve the lack of user side parametersSolve peak shaving assistanceEnergy industrySingle network parallel feeding arrangementsElectricity marketPower grid
The invention discloses a power generation and power consumption organizing method and device based on a peak regulation assistance service market. According to a daily delivery curve and peak regulation power consumption curves of a C-G direct trading contract submitted by a power consumer and declarations of wind power enterprises and thermal power generating units, a market clearing model containing power consumer peak regulation assistance is built, and after market clearing is conducted, the peak regulation power consumption curve of each low-ebb peak regulation period is obtained; finally, according to potential adjustable peak electric quantity of the thermal power generating units with the potential adjustable peak electric quantity and reduced abandoned wind electric quantity of the wind power generating units with the abandoned wind electric quantity being reduced, the problems that in an existing power consumer and electric generator set direct dealing mode, the customer lacks of participation in peak regulation assistance and the load peak regulation interruption involved range is narrow are solved. According to the method and the device, on the basis of conventional electricity market dealing, the power consumer can directly participate in the peak regulation assistance service market, the peak regulation potential of the consumer is stimulated, and the abandoned wind electric quantity of the whole power grid is reduced.
Owner:BEIJING TSINTERGY TECH CO LTD +4

Receiving method for pipe pusher obliquely entering narrow receiving well in underground pipe pushing construction

The invention relates to a receiving method for a pipe pusher obliquely entering a narrow receiving well in underground pipe pushing construction, which is characterized by comprising the following steps: after the pipe pusher is close to the receiving well, digging a hole door on the receiving well; making the front end of the pipe pusher partially enter the narrow receiving well by means of a power device at the rear end; and properly reinforcing an outer steel shell at the front end of the pipe pusher, detaching pipe pusher components connected with the steel shell of the pipe pusher and transporting the pipe pusher components away the receiving well; cutting off the outer steel shell of the pipe pusher in the receiving well, and hoisting the outer steel shell away the receiving well; and later, continuing the operations till the rest part of the pipe pusher fully enters the receiving well so as to finish the entering and receiving operation of the pipe pusher in the narrow receiving well. The receiving method has the advantage of solving the problem of narrow construction field; and meanwhile, only the steel shell of the pipe pusher is cut off section by section, but the core components inside the pipe pusher are completely reserved, and the components are reassembled after the steel shell is manufactured later to form the complete pipe pusher, so the method is economic.
Owner:SHANGHAI MECHANIZED CONSTR GRP

Image neighbor optimization method of improving large-scale three-dimensional reconstruction efficiency

The invention discloses an image neighbor optimization method of improving large-scale three-dimensional reconstruction efficiency. The image neighbor optimization method comprises steps that neighbor matching image pairs are acquired, and then the characteristic point matching of the image pairs is carried out; a fundamental matrix is used for geometric verification to eliminate error matching incapable of satisfying an epipolar constraint to acquire an interior point number, and a homography conversion rate is acquired by calculating a homography matrix; the changes of the directions and the dimensions of the matching characteristic points are counted to acquire a corresponding histogram; the similarity of the images is measured by three constraints, namely, the interior point number, the homography conversion rate, and the direction and dimension histogram, and redundant images are marked; the image pairs comprising the redundant images are eliminated, and narrow baseline image pairs are eliminated by the interior points and the homography conversion rate; and finally, image pair matching information after filtering is stored, and because the redundant image pairs and the narrow baseline image pairs are eliminated, the precision and the efficiency of the subsequent three-dimensional reconstruction are further improved.
Owner:HUAZHONG UNIV OF SCI & TECH

Novel high-speed steel structure material and preparation process thereof

InactiveCN106756473AImprove yieldImprovement hard to breakCrystalliteThermal treatment
The invention relates to the technical field of high-speed steel structure materials, in particular to a novel high-speed steel structure material and a preparation process thereof. Chemical components of the novel high-speed steel structure material are composed of, by weight, 0.15%-0.45% of Si, not larger than 0.03% of P, not larger than 0.03% of S, 1.15%-1.45% of W, 1.05%-1.15% of C, 8.90%-9.50% of Mo, 3.80%-4.25% of Cr, 1.25%-1.55% of V, 0.15%-0.40% of Mn, 2.75%-3.75% of Co, not larger than 0.25% of Ni, not larger than 0.30% of Cu and the balance Fe. The invention aims at providing the novel high-speed steel structure material and the preparation process of the novel high-speed steel structure material, the performance of the novel high-speed steel structure material can be equivalent to that of M42 steel, and the novel high-speed steel structure material can comprehensively replace imported M35 and domestic M42. Meanwhile, the problems that the traditional M42 steel needs a large quantity of the element Co and the thermal treatment temperature interval is narrow are solved, the yield in forging and thermal treatment production is increased, the content of the element Co is decreased to 3% from 8%, and in other words, protection of the state for precious metal resources is facilitated while cost is reduced. By means of the novel high-speed steel structure material and the preparation process, the defects that it is difficult to smash traditional M42 carbide particles and the grain size number is likely to be large are overcome, and grains and carbide are also refined.
Owner:DONGTAI YINXIN STEEL STRUCTURE ENG CO LTD

Combined revetment combined with near-term plan and long-term plan

The invention discloses a combined revetment combined with a near-term plan and a long-term plan. The combined revetment comprises a primary revetment body and a prefabricated secondary L-shaped revetment body, the prefabricated secondary L-shaped revetment body is formed by splicing a plurality of concrete prefabricated revetment sections, the two ends of the concrete prefabricated revetment sections are correspondingly provided with connecting convex teeth and connecting concave teeth which cooperate with each other, every two adjacent concrete prefabricated revetment sections of the prefabricated secondary L-shaped revetment body are connected through the corresponding connecting convex tooth and connecting concave tooth, the connecting convex teeth and the connecting concave teeth areconnected through bolts, rubber water stopping grooves are formed between the connecting convex teeth and the connecting concave teeth, water swelling rubber strips are arranged in groove openings, the joints between the connecting convex teeth and the connecting concave teeth are filled with low-foaming polyethylene plates, and single-component polyurethane sealants are adopted for sealing on theperipheral surfaces of deformation joints. The combined revetment can be implemented according to a planned watercourse blue line in the later period, or when the hydrophilicity requirement for a landscape needs to be improved, the secondary revetment body can be disassembled and reused, so that waste engineering is reduced, the construction difficulty is reduced, and the influence of construction on the surrounding environment is reduced.
Owner:SHANGHAI MUNICIPAL ENG DESIGN INST GRP

High-voltage power-frequency AC voltage-withstanding system mobile measurement device and alignment control method thereof

The invention discloses a high-voltage power-frequency AC voltage-withstanding system mobile measurement device, which comprises a current-limiting resistor and a measurement mechanism, wherein one end of the current-limiting resistor is provided with a conductive column contacted with a test transformer and the other end is provided with a connection seat; the top end of the measurement mechanism is provided with a contact seat in contact conduction with the connection seat; the current-limiting resistor is supported by a supporting table; the supporting table is fixed on a mobile base via a lifting mechanism; and the bottom end of the measurement mechanism is fixed on a lateral movement mechanism, and the lateral movement mechanism is arranged on the mobile base. The current-limiting resistor and a capacitive voltage divider of the system are arranged on an electric vehicle frame to form a platform, the height of the platform is adjustable, electric movement can be realized conveniently and quickly, forward and backward operation is simple and convenient, the system is movable, and hall space is optimized to the largest degree; and the platform can realize quick and accurate positioning of the current-limiting resistor connection part and the test transformer connection part, and a large amount of manpower is saved.
Owner:WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1

Method of determining homogenization/solid solution heat treatment institution of nickel-base monocrystal high temperature alloy

The invention belongs to the technical field of nickel-base monocrystal high temperature alloy preparation, and relates to a method of determining a homogenization/solid solution heat treatment institution of nickel-base monocrystal high temperature alloy. The method comprises the steps that the first-stage homogenization/solid solution heat treatment temperature is determined; the highest-stage homogenization/solid solution heat treatment temperature is determined; the intermediate-stage homogenization/solid solution heat treatment temperature is determined; and the homogenization/solid solution heat treatment institution is determined. When the method is used, the alloy can be subjected to homogenization/solid solution heat treatment at the temperature higher than the cast-state initialmelting temperature, and no initial melting defect is generated. Meanwhile, due to the fact that the higher homogenization/solid solution heat treatment temperature is adopted, the better homogenization effect can be obtained in the short homogenization/solid solution heat treatment period, no initial melting defect is generated, and then the problems that due to the fact that the contents of high-melting-point elements are high, dendritic segregation of the elements is serious, a homogenization/solid solution heat treatment window is small, and the homogenization difficulty is high are effectively solved.
Owner:AVIC BEIJING INST OF AERONAUTICAL MATERIALS

Broadband circular-polarized microstrip antenna

ActiveCN106229686ABroadened operating frequency bandwidthIncreased operating frequency bandwidthSimultaneous aerial operationsRadiating elements structural formsPhase differenceDielectric substrate
The invention discloses a broadband circular-polarized microstrip antenna and relates to the technical field of antennas. The broadband circular-polarized microstrip antenna comprises first and second radiation units, first and second H-shaped grooves, first and second feeding units, a 90-degree phase-shift power-division network, a load, a grounding through hole, a welding pad, first, second and third dielectric substrates, and an air dielectric layer, wherein the first and second radiation units are respectively attached to the upper surfaces of the first and second dielectric substrates, the air dielectric layer is arranged between the first and second dielectric substrates which are support by gaskets, a ground layer is attached between the second and third dielectric substrates, the first and second feeding units are attached to the lower surface of the third dielectric substrate, the first and second H-shaped grooves are arranged in the ground layer, the input port of the 90-degree phase-shift power-division network is an antenna port, the output port of the 90-degree phase-shift power-division network is respectively connected with the first and second feeding units and the load, the load is connected with the ground layer via the welding pad and the grounding through hole, and the 90-degree phase-shift power-division network divides one path of signals into two paths of signals with equal amplitude and 90-degree phase difference.
Owner:上海捷士太通讯技术有限公司

High-voltage power-frequency AC voltage-withstanding system measuring platform

The invention discloses a high-voltage power-frequency AC voltage-withstanding system measuring platform comprising a current-limiting resistor and a measuring mechanism. One end of the current-limiting resistor is equipped with a conductive pole in contact with a test transformer. The other end of the current-limiting resistor is equipped with a connecting seat. The top of the measuring mechanism is equipped with a contact seat in contact and conductive with the connecting seat. The current-limiting resistor is supported by a support table. The support table is fixed to a mobile pedestal through an elevating mechanism. The bottom of the elevating mechanism is fixed to a lateral movement mechanism installed on the mobile pedestal. The current-limiting resistor and a capacitive voltage divider are installed on an electric vehicle frame to form a platform. The platform is adjustable in height, can be conveniently, rapidly, and electrically moved, is simple and convenient in forward and backward operation, achieves the mobility of the system, and optimizes the hall space to the utmost extent. Further, the platform may fast and accurately position a current-limiting resistor connecting part and a test transformer connecting part and saves a plenty of manpower.
Owner:WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1

Method for rapidly breeding three-line rice maintainer line and sterile line by using rice genome analysis technology

The invention belongs to the technical field of rice breeding, and particularly relates to a method for rapidly breeding the three-line rice maintainer line and sterile line by using a rice genome analysis technology. According to the method, the maintainer line and the sterile line are synchronously improved, and the breeding age limit is fundamentally shortened; by taking the sterile plants of the offspring in the same combination as a contrast, comparing maintainer plants with fertile offspring in the same combination through a whole genome, and quickly removing maintainer plants carrying a minor restorer gene, conventional rice, a restorer line or a local variety with favorable characters can be taken as a donor male parent, and the problem of narrow hereditary basis of the existing maintainer line is solved; the linkage burdens for breaking bad alleles are screened by using large-group markers, and sterile plants and maintainer plants with similar genetic backgrounds are selected for pairwise hybridization through clustering analysis of whole-genome SNP marker genotypes, so that the problem of difficulty in polymerization of excellent characters is solved, and the method has important popularization and application values in breeding of hybrid rice.
Owner:RICE RES INST GUANGDONG ACADEMY OF AGRI SCI

Ultralarge section inclined single-pile foundation construction process based on vertical lifting system

The invention discloses a ultralarge section inclined single-pile foundation construction process based on a vertical lifting system. A constructed ultralarge section inclined single-pile foundation is a reinforced concrete pile, and is provided with a reinforcement cage inside; the ultralarge section inclined single-pile foundation is constructed by the following steps: (1) the advance support construction is performed for a pipe roof; (2) hole opening protection: a hole opening support structure is constructed in a hole opening of a pile hole; (3) the vertical lifting system is installed; (4) the excavation, the slag discharge and the support construction are performed for the pile hole. The pile hole is excavated by multiple construction sections from top to bottom through a full-section excavation method; the slag discharge is synchronized in the excavation process; and the wall protection construction is respectively performed for pile hole sections excavated by all the construction sections; and (5) pile body construction: the reinforcement cage is bound and concrete is filled. The process is simple in steps, reasonable in design, low in investment cost, convenient for construction and excellent in use effect, can simply and quickly finish the construction process of the ultralarge section inclined single-pile foundation, and is easy to control the construction process.
Owner:CHINA RAILWAY FIRST GRP CO LTD +1

Mobile measuring device and alignment control method for high-voltage power-frequency AC withstand voltage system

The invention discloses that the invention discloses a mobile measuring device for a high-voltage power frequency AC withstand voltage system, which includes a current-limiting resistor and a measuring mechanism. One end of the current-limiting resistor is provided with a conductive column in contact with the test transformer, and the other end is provided with a connecting seat. , the top of the measuring mechanism is provided with a conductive contact seat in contact with the connecting seat, the current limiting resistor is supported by a supporting platform, and the supporting platform is fixed on the mobile base through a lifting mechanism, and the bottom of the measuring mechanism is The end is fixed on the lateral movement mechanism, and the lateral movement mechanism is installed on the mobile base. The current-limiting resistor and capacitor voltage divider of the system are installed on the electric vehicle frame to form a platform. The height of the platform can be adjusted, which can realize electric movement conveniently and quickly. The forward and backward operation is simple and convenient, realizing the mobility of the system. The space has been optimized to the greatest extent; at the same time, the platform can realize the fast and accurate positioning of the connection part of the current limiting resistor and the connection part of the test transformer, saving a lot of manpower.
Owner:WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1

An Image Neighborhood Optimization Method for Improving the Efficiency of Large-Scale 3D Reconstruction

The invention discloses an image neighbor optimization method of improving large-scale three-dimensional reconstruction efficiency. The image neighbor optimization method comprises steps that neighbor matching image pairs are acquired, and then the characteristic point matching of the image pairs is carried out; a fundamental matrix is used for geometric verification to eliminate error matching incapable of satisfying an epipolar constraint to acquire an interior point number, and a homography conversion rate is acquired by calculating a homography matrix; the changes of the directions and the dimensions of the matching characteristic points are counted to acquire a corresponding histogram; the similarity of the images is measured by three constraints, namely, the interior point number, the homography conversion rate, and the direction and dimension histogram, and redundant images are marked; the image pairs comprising the redundant images are eliminated, and narrow baseline image pairs are eliminated by the interior points and the homography conversion rate; and finally, image pair matching information after filtering is stored, and because the redundant image pairs and the narrow baseline image pairs are eliminated, the precision and the efficiency of the subsequent three-dimensional reconstruction are further improved.
Owner:HUAZHONG UNIV OF SCI & TECH

Excavation and ballast removal of super large section inclined monopile foundation

The invention discloses an excavation and mucking construction technology of a super-large cross-section inclined single-pile foundation, comprising steps: 1. Advance support construction of a pipe shed; 1. Installation of ballasting equipment at the hole: install the ballasting equipment outside the hole of the pile hole; the ballasting equipment includes two longitudinal walking frames on the left and right, a horizontal walking frame that can move forward and backward on the two longitudinal walking frames, and a horizontal walking frame that can move left and right along the horizontal walking frame. Translational hoisting equipment and the mucking hopper hoisted under the hoisting equipment by ropes; 4. Pile hole excavation and mucking construction: the pile hole is excavated in multiple construction sections from top to bottom by using the full-section excavation method. During the excavation process of each construction segment, the mucking equipment is used to discharge the muck synchronously. The invention has the advantages of simple process steps, reasonable design, low input cost, convenient construction and good application effect, and can simply and quickly complete the construction process of excavation and mucking out of the super-large cross-section inclined single-pile foundation, and the construction process is easy to control.
Owner:CHINA RAILWAY FIRST GRP CO LTD

Excavation and mucking construction process for tilting type superlarge-section single-pile foundation

The invention discloses an excavation and mucking construction process for a tilting type superlarge-section single-pile foundation. The process comprises the steps of firstly, advanced pipe shed support construction; secondly, hole mouth protection, i.e., a hole mouth support structure is constructed at a hole mouth of a pile hole; thirdly, installation of a mucking device at the hole mouth, i.e., the mucking device is installed outside the hole mouth of the pile hole and comprises a left longitudinal travelling frame, a right longitudinal travelling frame, a transverse travelling frame capable of horizontally moving on the two longitudinal travelling frames front and back, a hoisting device capable of horizontally moving on the transverse travelling frame left and right, and a mucking hopper hoisted below the hoisting device through a rope; and fourthly, pile hole excavation and mucking construction, i.e., a full section excavation method is adopted for the pile hole excavation with a plurality of construction segments arranged from top to bottom, and the mucking device is used for mucking synchronously in the excavation process of each construction segment. The excavation and mucking construction process for the tilting type superlarge-section single-pile foundation is easy in step, reasonable in design, low in investment cost, simple and easy to construct, good in use effect and capable of easily and fast completing the excavation and mucking construction process of the tilting type superlarge-section single-pile foundation, and the construction process is safe and easy to control.
Owner:CHINA RAILWAY FIRST GRP CO LTD

Construction Technology of Inclined Single Pile Foundation with Super Large Section Based on Vertical Hoisting System

The invention discloses a construction process for a super-large cross-section inclined single-pile foundation based on a vertical hoisting system. The super-large cross-section inclined single-pile foundation constructed is a reinforced concrete pile and a steel cage is arranged inside it; the super-large cross-section inclined single-pile foundation During the construction, the steps include: 1. Advance support construction of the pipe shed; 2. Hole protection: construction of the hole support structure at the hole of the pile hole; 3. Vertical hoisting system installation; 4. Pile hole excavation, ballasting and support Construction: Excavate the pile holes in multiple construction sections from top to bottom using the full-section excavation method. During the excavation process, the muck is excavated synchronously, and the pile hole sections excavated and formed in each construction section are separately excavated. Carry out retaining wall construction; 5. Pile body construction: steel cage binding and concrete pouring. The invention has the advantages of simple process steps, reasonable design, low investment cost, convenient construction and good use effect, and can simply and quickly complete the construction process of the super-large cross-section inclined single pile foundation, and the construction process is easy to control.
Owner:CHINA RAILWAY FIRST GRP CO LTD +1

High voltage power frequency AC withstand voltage system measurement platform

The invention discloses a high-voltage power-frequency AC voltage-withstanding system measuring platform comprising a current-limiting resistor and a measuring mechanism. One end of the current-limiting resistor is equipped with a conductive pole in contact with a test transformer. The other end of the current-limiting resistor is equipped with a connecting seat. The top of the measuring mechanism is equipped with a contact seat in contact and conductive with the connecting seat. The current-limiting resistor is supported by a support table. The support table is fixed to a mobile pedestal through an elevating mechanism. The bottom of the elevating mechanism is fixed to a lateral movement mechanism installed on the mobile pedestal. The current-limiting resistor and a capacitive voltage divider are installed on an electric vehicle frame to form a platform. The platform is adjustable in height, can be conveniently, rapidly, and electrically moved, is simple and convenient in forward and backward operation, achieves the mobility of the system, and optimizes the hall space to the utmost extent. Further, the platform may fast and accurately position a current-limiting resistor connecting part and a test transformer connecting part and saves a plenty of manpower.
Owner:WUHU POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products