Excavation and mucking construction process for tilting type superlarge-section single-pile foundation

A single-pile foundation and super-large cross-section technology, which is applied in the direction of foundation structure engineering, excavation, construction, etc., can solve the problems that affect the excavation construction process, the difficulty of construction, and the complicated process, so as to improve the level of mechanized construction and speed up excavation operations The effect of simple process and excavation process steps

Active Publication Date: 2016-09-28
CHINA RAILWAY FIRST GRP CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, the above-mentioned excavation method has the following defects and deficiencies in the following three aspects: ① When excavating sections and steps, the safety of excavation is improved by reducing the construction space and increasing the support in the body, but the space is so small that it is impossible to use machinery. Cooperate with the low degree of mechanization, which greatly reduces the construction progress and brings difficulties to the construction; ②Due to the large inclination angle of the foundation, large-scale machinery cannot enter and exit the foundation by itself, and the muck or ballast cannot be discharged by rail transportation, and the construction efficiency is extremely low
However, during the excavation of the super-large cross-section inclined single-pile found

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Excavation and mucking construction process for tilting type superlarge-section single-pile foundation
  • Excavation and mucking construction process for tilting type superlarge-section single-pile foundation
  • Excavation and mucking construction process for tilting type superlarge-section single-pile foundation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0074] like figure 1 The excavation and mucking construction technology of a super-large cross-section inclined single-pile foundation is shown. The super-large cross-section inclined single-pile foundation is a reinforced concrete pile, and the cross-sectional area of ​​the reinforced concrete pile is greater than 100m 2 And its inclination angle is greater than 45°; when excavating and excavating the super-large cross-section inclined single-pile foundation, the following steps are included:

[0075] Step 1. Advance support construction of pipe shed: Before excavating the pile hole 1 of the super-large cross-section inclined single pile foundation, the pipe shed advance support construction is carried out on the top of the pile hole 1 to obtain the formed pipe shed advance support structure, see figure 2 ;

[0076] Step 2, opening protection: construction of opening supporting structure at the opening of pile hole 1;

[0077] Step 3, the installation of the dregs removal...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Inclinationaaaaaaaaaa
Lengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses an excavation and mucking construction process for a tilting type superlarge-section single-pile foundation. The process comprises the steps of firstly, advanced pipe shed support construction; secondly, hole mouth protection, i.e., a hole mouth support structure is constructed at a hole mouth of a pile hole; thirdly, installation of a mucking device at the hole mouth, i.e., the mucking device is installed outside the hole mouth of the pile hole and comprises a left longitudinal travelling frame, a right longitudinal travelling frame, a transverse travelling frame capable of horizontally moving on the two longitudinal travelling frames front and back, a hoisting device capable of horizontally moving on the transverse travelling frame left and right, and a mucking hopper hoisted below the hoisting device through a rope; and fourthly, pile hole excavation and mucking construction, i.e., a full section excavation method is adopted for the pile hole excavation with a plurality of construction segments arranged from top to bottom, and the mucking device is used for mucking synchronously in the excavation process of each construction segment. The excavation and mucking construction process for the tilting type superlarge-section single-pile foundation is easy in step, reasonable in design, low in investment cost, simple and easy to construct, good in use effect and capable of easily and fast completing the excavation and mucking construction process of the tilting type superlarge-section single-pile foundation, and the construction process is safe and easy to control.

Description

technical field [0001] The invention belongs to the technical field of pile foundation construction, and in particular relates to an excavation and muck-out construction technology of a super-large cross-section inclined single-pile foundation. Background technique [0002] For excavation cross-sectional area greater than 100m 2 When excavating a super-large cross-section inclined single-pile foundation with an inclination angle (that is, the angle between the central axis and the plumb line) greater than 45° (hereinafter referred to as the super-large cross-section inclined single-pile foundation), engineering measures must be taken to To ensure rock mass stability and operation safety during construction. When excavating the above-mentioned super-large cross-section inclined single-pile foundation in China, the excavation is mostly carried out according to the excavation method of mine tunnels, and the excavation method combining manual drilling and blasting with small me...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E02D27/12E02D17/20
CPCE02D17/207E02D27/12
Inventor 徐永祥余海静国锋王高平白利勇曹佰玉田建伟张方博刘涛冯四超赵建民毕张龙周慧敏瞿代均张学钢
Owner CHINA RAILWAY FIRST GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products