Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A method and device for determining a power grid accident plan

A technology for grid accident and determination method, which is applied in electrical testing/monitoring, instrumentation, control/regulation systems, etc., can solve problems such as hidden dangers of grid safety operation, prolonged grid accident time, and unsuitable dispatching plans.

Active Publication Date: 2018-05-11
HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHENGJIANG ELECTRIC POWER +3
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of this, the embodiments of the present invention provide a method and device for determining a power grid accident plan to solve the problem of prolonging the time for dealing with power grid accidents in the prior art by manually identifying and searching for a plan, and because the topological structure of the power grid often occurs large After the plan is identified and searched, the scheduling plan obtained after the search may no longer be suitable. At the same time, the correctness of the relevant operations in the process of identifying and searching for the plan cannot be guaranteed through manual methods, so that the final plan obtained is not the best. A good plan, which brings great hidden dangers to the safe operation of the power grid

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and device for determining a power grid accident plan
  • A method and device for determining a power grid accident plan
  • A method and device for determining a power grid accident plan

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0052] figure 1 The flow chart of the method for determining the power grid accident plan provided by the embodiment of the present invention can quickly and accurately find the required plan, and can reduce the large changes in the topology of the power grid during the search for the plan. It is possible to apply again, and at the same time, the found plan is checked, which effectively solves the problem that the found plan is no longer applicable due to freq...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention provides a preliminary plan determining method and apparatus of a power grid accident. The method comprises: a grid accident signal is monitored and a fault device and a fault device title are determined according to the grid accident signal; on the basis of the fault device title, searching is carried out on a preset accident preliminary plan model to obtain standby preliminary plans, wherein the accident preliminary plan model contains titles of all fault devices and preliminary plans corresponding to the titles of all fault devices; checking is carried out on all standby preliminary plans according to a preset checking rule to obtain a checked preliminary plan, wherein the operating way of the device corresponding to the checked preliminary plan is identical with the operating way of the fault device after isolation, and the checked preliminary plan is used as a formal preliminary grid accident plan of the fault device. Therefore, a needed preliminary plan can be searched rapidly and accurately. Meanwhile, the searched preliminary plan is checked, so that a problem that the searched preliminary plan is not suitable for the accident because of the large change of the grid topological structure can be solved; and thus safety of the power grid is improved.

Description

technical field [0001] The invention relates to the technical field of power grid dispatching, in particular to a method and device for determining a power grid accident plan. Background technique [0002] At present, when an accident occurs in the power grid, the dispatcher mainly relies on the existing accident plan to deal with the accident. When the dispatcher monitors the power grid accident signal through the SCADA (Supervisory Control And Data Acquisition, data acquisition and monitoring control) system, after judging and locating the faulty equipment, manually retrieve and identify all the accident plans. After identifying the corresponding plans, Then carry out a series of follow-up operations (such as load transfer, fault isolation and restoration of power supply) according to the plan. [0003] After the accident, through manual identification and search for contingency plans, due to the limited human energy and identification and search speed, it will take a lon...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G05B23/02
CPCG05B23/0213G05B2219/32404
Inventor 郑伟彦阙波乐全明朱义勇陈蕾苏毅方崔建业刘家齐王凯孟凯徐塑付俊强李晓波
Owner HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHENGJIANG ELECTRIC POWER
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products