A multi-protocol acquisition and scheduling method for integrated network management

A scheduling method and integrated network management technology, applied in data exchange networks, digital transmission systems, electrical components, etc., can solve problems such as difficulty in management and maintenance work, and achieve the effect of reducing workload

Active Publication Date: 2019-05-21
BEIJING ENOVELL TECH
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The integrated network management system needs to face many types of manufacturer interfaces. These interface protocols and development tools may be different. Directly exposing these interfaces to engineers or users will bring a lot of difficulties to daily management and maintenance.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A multi-protocol acquisition and scheduling method for integrated network management
  • A multi-protocol acquisition and scheduling method for integrated network management
  • A multi-protocol acquisition and scheduling method for integrated network management

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0047] An integrated network management multi-protocol acquisition and scheduling method of the present invention will be described in detail below in combination with the embodiments and the accompanying drawings.

[0048] In the integrated network management multi-protocol collection and scheduling method of the present invention, the collection and scheduling service is a bridge connecting the data presentation layer and the collection adapter, and its duty is to run tasks and feed back results. The tasks that need to be run come from the presentation layer. Users can view various operations supported by the interface in the interface configuration interface. In the task management interface, various collection tasks can be created according to actual needs. The whole process does not require these task calls. Which acquisition adapter, in the end what protocol is implemented. The collection scheduling service runs the configured tasks regularly, adapts the collection servi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a multi-protocol acquiring and scheduling method for comprehensive network management. An acquiring and scheduling service is a bridge for connecting a data presentation layer to an acquiring adapter, and is responsible for operating a task and feeding back a result; an acquirer of the acquiring and scheduling service is a program developed according to different interface protocols; by means of the acquirer, acquisition of all data described by the interface protocols is realized; the task to be operated comes from the presentation layer; users can see all kinds of operations supported by an interface in an interface configuration interface and create all kinds of acquisition tasks according to practical requirements in a task management interface; the acquiring and scheduling service operates the configured task in a timed manner; an acquisition service is adapted according to information described by the task; then, the acquisition service is invoked through a standard inlet; operation of the acquisition service is monitored; and an operation result is fed back to the presentation layer or directly written in a data storage layer. According to the invention, uniform invoking of multi-protocol and multi-language processes is realized; the various interface protocols are thoroughly isolated from the presentation layer; and thus, qualification requirements of constructors and maintainers are greatly reduced.

Description

technical field [0001] The invention relates to an integrated network management system. In particular, it relates to an integrated network management multi-protocol collection and scheduling method. Background technique [0002] The integrated network management system needs to face various types of manufacturer interfaces. These interface protocols and development tools may be different. Directly exposing these interfaces to engineers or users will bring a lot of difficulties to daily management and maintenance. Therefore, one and the same method is needed to encapsulate them, leaving only a unified and simple interface for external use. Contents of the invention [0003] The technical problem to be solved by the present invention is to provide an integrated network management multi-protocol acquisition and scheduling method that can greatly reduce the workload of construction and maintenance personnel. [0004] The technical scheme adopted in the present invention is:...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): H04L12/24
CPCH04L41/02H04L41/022
Inventor 王瑾周容红
Owner BEIJING ENOVELL TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products