Task distribution method based on idle time of loss assessment officers
A technology of task allocation and free time, applied in the direction of instruments, data processing applications, resources, etc., can solve the problems that affect the enthusiasm of loss assessment personnel, the order of loss assessment, uneven task allocation, and low work efficiency of personnel, so as to achieve reasonable and efficient automatic allocation , Convenient big data statistics and summary, conducive to the effect of dataization and statistics
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] Such as figure 1 As shown, a task allocation method based on the free time of the loss adjuster, the method includes the following steps:
[0048] S1: Each CU client calculates the idle time of the corresponding loss adjuster in real time. In this embodiment, the CU client calculates the free time of the loss adjuster in real time. The idle time of the loss adjuster is calculated from the time when the loss adjuster logs in to the CU client or completes the last loss assessment task. After acquiring a new task, the idle time is cleared. . Each loss assessor is configured with a CU client to log in and carry out loss assessment work. After the loss assessor logs in to the CU client, the CU client automatically records the login time, and the accumulated time recorded is the idle time of the loss assessor. Time is in a state of constant dynamic updating. After the loss assessor acquires a new task, his free time is cleared, and after the loss assessor completes the tas...
Embodiment 2
[0061] Such as Figure 4 As shown, in this embodiment, the task allocation method further includes: the server establishes a database for storing data information of the task allocation process, and monitors and summarizes various data information of the loss determination work to facilitate the loss determination work. It is convenient to carry out big data statistics and summary of loss assessment work on a regular basis. Other steps are identical with embodiment 1.
Embodiment 3
[0063] In step S3, if the loss adjuster completes all follow-up work before the free time reaches the threshold, the loss adjuster can choose to manually click the active application button to obtain the documents from the server. The damage assessor whose time exceeds the threshold forms a task request according to the time of his active application or the time of exceeding the threshold, and is used to obtain the latest loss assessment task. By setting the loss adjuster to take the initiative to apply for tasks before the free time reaches the threshold, the work enthusiasm of the loss adjuster can be greatly improved. Other steps are identical with embodiment 1.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com