[0026] Reference Figure 1-Figure 6 , The present invention includes the following steps:
[0027] 1) Prefabricated PHC pile foundation 1, prefabricated reinforced concrete beam 2, prefabricated reinforced concrete slab 3, the prefabricated reinforced concrete beam 2 is provided with main reinforcement 21 and waist reinforcement 22, and the prefabricated PHC pile foundation 1 is evenly provided with 8 prefabricated Leave steel bars 11. A 70mm protrusion 23 is reserved on the upper surface of the precast reinforced concrete beam 2 with steel bars inside, and an 80mm groove 31 is reserved at a corresponding position on the lower surface of the precast reinforced concrete slab 3 with steel bars inside;
[0028] 2) The prefabricated PHC pile foundation 1 has reserved steel bars 11 at the pile head, and the length of the steel bars 11 is greater than the thickness of the prefabricated reinforced concrete beam 2;
[0029] 3) A cushion layer 4 is arranged under the prefabricated reinforce...