Rock slope greening construction method
A construction method and technology for rocky slopes, which are applied in botanical equipment and methods, excavation, calcareous fertilizers, etc., can solve the problems of poor soil on rocky slopes, difficult for plants to be fixed and difficult to survive, etc. Maintenance, easy disassembly, and the effect of improving the survival rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0057] A greening construction method for a rocky slope, comprising the following steps:
[0058] (1) Slope cleaning
[0059] Remove weeds, debris, floating soil, pumice and loose rocks on the slope, trim the corners of the slope and the corners of the top of the slope, so that the corners of the slope and the corners of the top of the slope are arc-shaped, and the slope is smoothed;
[0060] (2), set the anchor rod
[0061] Drill two rows of anchor holes at the bottom of the slope and on the slope, set anchor rods in the anchor holes, and fix the anchor rods in the anchor holes with concrete;
[0062] (3) Open the planting cavity and install the planting tube
[0063] Expand the opening end of the anchor hole with the anchor rod to form a planting cavity, the anchor rod is close to the lower side wall of the planting cavity, and the depth of the planting cavity is controlled to 25cm; prepare the connecting cylinder, open a number of air holes on the connecting cylinder, and...
Embodiment 2
[0088] A greening construction method for a rocky slope, comprising the following steps:
[0089] (1) Slope cleaning
[0090] Remove weeds, debris, floating soil, pumice and loose rocks on the slope, trim the corners of the slope and the corners of the top of the slope, so that the corners of the slope and the corners of the top of the slope are arc-shaped, and the slope is smoothed;
[0091] (2), set the anchor rod
[0092] Drill two rows of anchor holes at the bottom of the slope and on the slope, set anchor rods in the anchor holes, and fix the anchor rods in the anchor holes with concrete;
[0093] (3) Open the planting cavity and install the planting tube
[0094] Expand the opening end of the anchor hole with the anchor rod to form a planting cavity, the anchor rod is close to the lower side wall of the planting cavity, and the depth of the planting cavity is controlled to 55cm; prepare the connecting cylinder, open a number of air holes on the connecting cylinder, and...
Embodiment 3
[0117] A greening construction method for a rocky slope, comprising the following steps:
[0118] (1) Slope cleaning
[0119] Remove weeds, debris, floating soil, pumice and loose rocks on the slope, trim the corners of the slope and the corners of the top of the slope, so that the corners of the slope and the corners of the top of the slope are arc-shaped, and the slope is smoothed;
[0120] (2), set the anchor rod
[0121] Drill two rows of anchor holes at the bottom of the slope and on the slope, set anchor rods in the anchor holes, and fix the anchor rods in the anchor holes with concrete;
[0122] (3) Open the planting cavity and install the planting tube
[0123] Expand the opening end of the anchor hole with the anchor rod to form a planting cavity, the anchor rod is close to the lower side wall of the planting cavity, and the depth of the planting cavity is controlled to 45cm; prepare the connecting cylinder, open a number of air holes on the connecting cylinder, and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com