Method for optimizing operation of regional integrated energy system taking into account load aggregator
A technology for integrated energy systems and load aggregators, applied in resources, computing, instruments, etc., can solve problems such as difficult scale effects, difficult scheduling, and no public reports
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-12-21
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of multi-energy complementary modeling optimization of power systems, in particular to a method for optimizing the operation of regional comprehensive energy systems based on load aggregators. Background technique
[0002] In the field of new energy, there is a situation of synergistic optimization of different energy forms. In the process of development and utilization of each energy, it needs the synergy and complementarity of multiple energy sources to achieve efficient utilization. However, due to the differences in the development of different energy systems, most of them are independently planned, designed, and operated independently. The lack of mutual coordination will lead to low energy utilization, poor overall security and self-healing capabilities of the energy supply system. With the continuous development of smart grid technology, the decentralized energy market and energy network structure make the trad...
Examples
Embodiment Construction
[0107] In this embodiment, the method for optimizing the operation of the regional comprehensive energy system considering the load aggregator is carried out as follows:
[0108] Step 1. Obtain the day-ahead forecast data of the electric load and the day-ahead forecast data of the cooling and heating load of the regional integrated energy system:
[0109] The day-ahead forecast data of the regional integrated energy system electric load is obtained by using the historical electric load data and through the time series forecasting method; .
[0110] Step 2. Establish a demand-side response model based on load aggregators;
[0111]The load aggregator formulates a demand-side response plan through an agreement with the user. The demand-side response plan refers to making the cooling and heating loads respond to the grid-side dispatching and reducing the power demand during peak hours under the premise of having little impact on user comfort. Pressure to ensure safe operation; b...