Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A chute segment conflict and optimal arrangement method based on a BIM technology

A segment and chute technology, applied in image data processing, special data processing applications, instruments, etc., can solve problems such as prone to loopholes, achieve work coordination, perfect scheme, and improve work efficiency

Active Publication Date: 2019-06-14
中建八局轨道交通建设有限公司
View PDF3 Cites 11 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, loopholes are prone to occur when BIM technology performs data format conversion, and secondary development needs to be carried out on the basis of the original software

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A chute segment conflict and optimal arrangement method based on a BIM technology
  • A chute segment conflict and optimal arrangement method based on a BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Embodiments of the present invention are described below through specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the content disclosed in this specification. The present invention can also be implemented or applied through other different specific implementation modes, and various modifications or changes can be made to the details in this specification based on different viewpoints and applications without departing from the spirit of the present invention.

[0025] With the development of economy and technology, there are more and more large-scale subway projects. The pre-buried channel technology is gradually being used nationwide. The channel installation accuracy is high, and there is uncertainty in the use of new technologies. In order to reduce the conflict between steel bars and chute anchor bolts In the event of rework, the present invention utilizes the optimization features of BIM...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a chute segment conflict and optimal arrangement method based on a BIM technology. The chute segment conflict and optimal arrangement method comprises the following steps: creating a BIM chute segment model and a BIM segment steel bar model by using Autodest Revit modeling software; exporting the BIM chute segment model and the BIM segment steel bar model into Fuzor software, and installing a design drawing for integration; conducting soft collision conflict check on the integrated BIM sliding groove segment model and the integrated BIM segment steel bar model; and according to a result of the soft collision conflict inspection, optimizing the arrangement of components in the BIM chute segment model and the BIM segment reinforcing steel bars. Through the applicationof the model, the subway tunnel segment structure and the sliding groove are drawn according to the scheme and the design drawing, then the steel bar BIM model is drawn, conflict check is conducted through the Fuzor software platform, the scheme is optimized in time, the scheme is more perfect, and implementation of the scheme is finer.

Description

technical field [0001] The invention relates to the field of management and control of the quality of steel bar chutes of subway tunnel segments, in particular to a method for chute segment conflicts and optimal layout based on BIM technology. Background technique [0002] As an urban rail transit system mainly operating underground, the subway is responsible for the important passenger transport responsibility of the city and directly affects the basic necessities of urban residents. At the same time, the construction level of the subway system also represents the prosperity of a city. As an important engine for technological transformation and upgrading in the construction industry, BIM technology represents the overall quality of the enterprise to a certain extent. The successful application of BIM technology in subway construction and the ability to summarize reproducible application methods will contribute to the development of the entire construction industry. Bringing...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F17/50G06T19/20
CPCY02P90/30
Inventor 郑文博蒋大伦张博玮王治宇孙健曲兆雷
Owner 中建八局轨道交通建设有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products