Hydropower station group monthly transaction plan electric quantity decomposition method considering power grid section constraints

A technology for hydropower station groups and hydropower stations, which is applied in computing, electrical digital data processing, and special data processing applications, etc. It can solve problems such as complex grid-connected relationships of hydropower stations, affecting power generation methods and grid-connected scales of hydropower stations, etc.

Active Publication Date: 2019-11-01
YUNNAN POWER GRID
View PDF7 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Under the interconnected operation platform, the grid-connected relationship of hydropower stations is very complicated. The upstream and downstream hydropower stations of a single river basin are merged into different transmission control sections (such as the Gongguo Bridge, Xiaowan, and Nuozhadu in the lower reaches of the main stream of the Lancang River are respectively merged into Jinzhong DC, Chusui, etc.). DC, Puqiao DC), there are also hydropower stations in different river basins merged into the same transmission control section (for example, Xiaowan and Jin'anqiao power stations are merged into Chusui DC at the same time). The power generation method and grid-connected scale, together with the power control conditions of the new power trading contract in the market environment, and the operation requirements and restrictions of the traditional hydropower reservoir itself, thus forming a hydroelectric power constraint set highly coupled in time and space, making the hydropower system Scheduling operation modeling and solving are facing great difficulties, and practical and effective models and methods are needed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Hydropower station group monthly transaction plan electric quantity decomposition method considering power grid section constraints
  • Hydropower station group monthly transaction plan electric quantity decomposition method considering power grid section constraints
  • Hydropower station group monthly transaction plan electric quantity decomposition method considering power grid section constraints

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0071] In the process of transaction power decomposition, first extract the monthly transaction plan power of each power station, construct the minimum water consumption model of the hydropower station group considering the grid transmission section constraints, and use the multi-dimensional search algorithm and the section-constrained check correction strategy to determine the water consumption of all hydropower station groups Electricity decomposition scheme. The specific implementation is as follows:

[0072] (1) Mathematical model

[0073] (a) Objective function

[0074] At this stage, my country is in the transition period of the new electricity reform, and the market transactions are mainly medium and long-term electricity transactions. In actual dispatching and operation, it is usually necessary to take the annual or monthly market contract electricity as the control target, taking into account the requirements for safe operation of the power grid and the inflow of wat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a hydropower station group monthly transaction plan electric quantity decomposition method considering power grid section constraints, and belongs to the technical field of hydropower dispatching operation. According to the method, the monthly transaction plan electric quantity decomposition scheme of the hydropower station group can be quickly determined by adopting the multi-dimensional search algorithm by taking minimum water consumption in the scheduling period as a target and considering the main transmission section control limit of the power grid. Firstly, monthly transaction plan electric quantity of each power station is extracted, and a hydropower station group water consumption minimum model considering power grid transmission section limitation is constructed; secondly, a multi-dimensional search algorithm is constructed from three dimensions of time, a power station and a feasible region, a check correction strategy is introduced for power grid section limit constraints, namely, loosening is performed, and then optimization calculation is performed, whether the output of each section violates the constraints one by one according to an optimization result is checked, and if the output violates the constraints, an equal proportion reduction and load transfer strategy are adopted to ensure that section safety constraints are met. The power generation water consumption of the system can be effectively reduced, and a technical thought is provided for medium-and-long-term transaction plan execution in a power market environment.

Description

technical field [0001] The invention belongs to the technical field of hydropower dispatching operation, and in particular relates to a method for decomposing electricity in monthly transaction plans of hydropower station groups in consideration of grid section constraints. Background technique [0002] The last decade or so has been a period of rapid development of my country's hydropower and power grid construction. Cascade hydropower stations in the main streams of the Jinsha River, Lancang River, and Yalong River in the southwest have been put into operation in clusters, forming a number of large-scale cascade hydropower stations with an installed capacity of over 10 million kilowatts. system, the national hydropower installed capacity also increased rapidly from breaking through 100 million kW in 2004 to 350 million kW in 2018, an increase of up to 2.5 times; Qiao DC, Niucong DC, Jinzhong DC and other UHV DC connection lines are used as links to realize the cross-basin an...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/06G06F17/50G06Q10/04
CPCG06Q50/06G06Q10/04Y04S10/50
Inventor 吴洋申建建周彬彬程春田蒋燕苏承国王有香陈凯赵珍玉李秀峰剡文林
Owner YUNNAN POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products