Hydropower station group monthly transaction plan electric quantity decomposition method considering power grid section constraints
Patent Information
- Authority / Receiving Office
- CN Β· China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- YUNNAN POWER GRID
- Publication Date
- 2019-11-01
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of hydropower dispatching operation, and in particular relates to a method for decomposing electricity in monthly transaction plans of hydropower station groups in consideration of grid section constraints. Background technique
[0002] The last decade or so has been a period of rapid development of my country's hydropower and power grid construction. Cascade hydropower stations in the main streams of the Jinsha River, Lancang River, and Yalong River in the southwest have been put into operation in clusters, forming a number of large-scale cascade hydropower stations with an installed capacity of over 10 million kilowatts. system, the national hydropower installed capacity also increased rapidly from breaking through 100 million kW in 2004 to 350 million kW in 2018, an increase of up to 2.5 times; Qiao DC, Niucong DC, Jinzhong DC and other UHV DC connection lines are used as links to realize the cross-basin an...