A power decomposition method for monthly transaction plans of hydropower station groups considering grid section constraints

A technology for hydropower station clusters and hydropower stations, applied in the direction of constraint-based CAD, calculation, design optimization/simulation, etc., can solve the problems of complex grid-connected relationship of hydropower stations, affecting the power generation mode and grid-connected scale of hydropower stations, and reduce the total water consumption. Effect

Active Publication Date: 2022-06-07
YUNNAN POWER GRID
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Under the interconnected operation platform, the grid-connected relationship of hydropower stations is very complicated. The upstream and downstream hydropower stations of a single river basin are merged into different transmission control sections (such as the Gongguo Bridge, Xiaowan, and Nuozhadu in the lower reaches of the main stream of the Lancang River are respectively merged into Jinzhong DC, Chusui, etc.). DC, Puqiao DC), there are also hydropower stations in different river basins merged into the same transmission control section (for example, Xiaowan and Jin'anqiao power stations are merged into Chusui DC at the same time). The power generation method and grid-connected scale, together with the power control conditions of the new power trading contract in the market environment, and the operation requirements and restrictions of the traditional hydropower reservoir itself, thus forming a hydroelectric power constraint set highly coupled in time and space, making the hydropower system Scheduling operation modeling and solving are facing great difficulties, and practical and effective models and methods are needed

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A power decomposition method for monthly transaction plans of hydropower station groups considering grid section constraints
  • A power decomposition method for monthly transaction plans of hydropower station groups considering grid section constraints
  • A power decomposition method for monthly transaction plans of hydropower station groups considering grid section constraints

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0071] In the process of transaction power decomposition, firstly extract the monthly transaction plan power of each power station, build a minimum water consumption model of hydropower station group considering the restriction of power grid transmission section, and use multi-dimensional search algorithm and cross-section constraint check and correction strategy to determine the power consumption of all hydropower station groups. Electricity decomposition scheme. The specific implementation is as follows:

[0072] (1) Mathematical model

[0073] (a) Objective function

[0074] At this stage, my country is in the transition period of new electricity reform, and the market transactions are mainly medium and long-term electricity transactions. In actual dispatching operations, it is usually necessary to take the annual or monthly market contract electricity as the control target, and consider the safe operation requirements of the power grid and the inflow of water from the res...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a power decomposition method of monthly transaction plan of a hydropower station group considering the section constraint of a power grid, and belongs to the technical field of hydropower dispatching operation. The invention takes the minimum water consumption in the dispatching period as the goal, considers the control limit of the main transmission section of the power grid, and adopts a multidimensional search algorithm to quickly determine the power decomposition scheme of the monthly transaction plan of the hydropower station group. Firstly, the monthly transaction plan electricity of each power station is extracted, and the minimum water consumption model of the hydropower station group is constructed considering the limitation of the transmission section of the power grid; secondly, a multi-dimensional search algorithm is constructed from three dimensions of time, power station, and feasible region, and a check correction is introduced for the limit constraint of the power grid section The strategy is to relax first and perform optimization calculations, and check whether the output of each section violates the constraints according to the optimization results one by one. If it violates, the proportional reduction and load transfer strategies are used to ensure that the section safety constraints are met. The invention can effectively reduce the power generation water consumption of the system, and provides technical ideas for the execution of medium and long-term trading plans in the power market environment.

Description

technical field [0001] The invention belongs to the technical field of hydropower dispatching and operation, and in particular relates to a method for decomposing a monthly trading plan of a hydropower station group considering the constraints of a power grid section. Background technique [0002] The past decade or so has been a period of rapid development of my country's hydropower and power grid construction. The mainstream cascade hydropower stations in the Jinsha River, Lancang River, and Yalong River in the southwest have been put into operation in clusters, forming a batch of large-scale cascade hydropower stations with an installed capacity of over 10 million kilowatts. System, the national hydropower installed capacity has also rapidly increased from over 100 million kW in 2004 to 350 million kW in 2018, an increase of up to 2.5 times; Qiao DC, Niucong DC, Jinzhong DC and other UHV DC tie lines are used as links to realize the interconnected operation of large hydropo...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q50/06G06F30/20G06Q10/04G06F111/04
CPCG06Q50/06G06Q10/04Y04S10/50
Inventor 吴洋申建建周彬彬程春田蒋燕苏承国王有香陈凯赵珍玉李秀峰剡文林
Owner YUNNAN POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products