Green building fabricated composite wallboard
A composite wall panel and green building technology, which is applied to buildings, building structures, floors, etc., can solve the problems of high steel resource consumption, unfavorable resource conservation, and increased installation costs, so as to save resources, improve moisture-proof effects, and save energy. The effect of energy consumption
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0047] refer to figure 1 and figure 2 , which is an assembled composite wall panel for a green building disclosed in the present invention, comprising a composite composite panel 1 , a mounting strip 10 for assembling the composite composite panel 1 , and a fixing member 100 that is fixedly connected to the wall surface. The fixing member 100 It is used to fix the combined composite board 1 to the wall.
[0048] refer to image 3 and Figure 4 , the combined composite panel 1 includes a frame body 2 made of aluminum alloy, and the frame body 2 is detachably connected with a first composite panel 3 for sound insulation and heat preservation, and the first composite panel 3 is detachably connected to the frame body 2 toward the wall. The frame body 2 is detachably connected with a second composite board 4, and the second composite board 4 is detachably connected to the side of the frame body 2 facing away from the wall surface; the second composite board 4 has two-way temper...
Embodiment 2
[0057] An assembly method of a green building prefabricated composite wallboard disclosed in the present invention includes the following steps:
[0058] Step 1. Assembly of the primary composite board: firstly fit the first composite board 3 into the first fitting groove 21 of the frame body 2, set the rubber sleeve 23 on the peripheral side of the first composite board 3, and then fit the second composite board 3 into the first fitting groove 21 of the frame 2. The composite plate 4 is fitted into the second fitting groove 22 of the frame body 2, and the rubber sleeve 23 is sleeved on the peripheral side of the second composite plate 4;
[0059] Step 2. Assembly of the mounting frame: the mounting bar 10 is fixed on the wall by screws to form an mounting frame, and the mounting groove 11 of the mounting bar 10 faces the center of the mounting frame;
[0060] Step 3. Assembly of the primary composite wall panel. Multiple primary composite panels are fitted into each other and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com