Fabricated wall grouting wall forming method
A prefabricated, wall technology, applied in the processing of walls, building materials, building components, etc., can solve the problems of lack of continuity, inability to guarantee accuracy, high labor intensity, etc., to facilitate mechanized grouting and simplify grouting Steps and operations, quality guaranteed effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] A method for grouting a prefabricated wall into a wall, comprising the following steps:
[0033]1) Make the required wall block 4. In the upper and lower sides of the wall block 4 and the left and right sides, respectively set up a slurry tank 1, the slurry tank 1 is corresponding to the surface edge of the wall block 4, and the slurry tank 1 in the upper and lower sides extends along the length direction of the wall block 4, The slurry tank 1 in the left and right sides extends along the height direction of the wall block 4 . The radial direction of the grout tank 1 is open to the edge of the wall block 4, that is, the grout tank 1 is all connected with the surface of the wall block 4, and the grout tank 1 shows an integral through groove on the wall block 4 surface; After the two wall blocks 4 are palletized and contacted, a full-length grouting port is formed on the surface of the wall where the two wall blocks 4 contact. The opening size of the grouting port of th...
Embodiment 2
[0042] The method for grouting a prefabricated wall in this embodiment is suitable for the construction of a thick wall with high strength. The difference between this embodiment and embodiment 1 is:
[0043] When performing step 2), set hidden beams and hidden columns in the stacked wall. That is, when stacking the wall blocks 4, leave a vertical and horizontal communication channel in the wall; the communication channel can be spliced with prefabricated internal wall blocks 4 with through holes, or it can be formed on the stacked wall blocks 4. Processed in the body of wall, or when using the wall block 4 stacking of the present invention, reserve the space of column and beam in the wall. After completing the grouting, grouting, and scraping processes of a preliminary wall, install plywood outside the wall with hidden beams and columns, and then install steel bars and other materials in the channels of hidden beams and columns, and then pour concrete; After the poured co...