A prioritized multi-master and multi-standby fast rerouting system and method

A priority and routing technology, applied in the field of communication, can solve the problems that routing protocols cannot form protection, do not meet the original intention of FRR technology design, and cannot monitor failure events, etc.

Active Publication Date: 2022-05-17
UTSTARCOM TELECOM CO LTD
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, there are the following problems: the primary path or backup path of the FRR group can only be a single next-hop link, and cannot be an existing ECMP group at the same time; the router can only monitor a single link failure event as a condition for FRR switching, and cannot Monitoring the failure events of the entire ECMP group, so it is impossible to implement a function similar to (ECMP group 1, ECMP group 2) forming a multi-master and multi-standby FRR protection; only based on the chip's ECMP resources to implement the FRR function, which will originally need to be prioritized. The FRR scheme of active / standby protection is implemented as active / active balanced protection without priority distinction at the hardware level, which does not meet the original design intention of FRR technology; typically, ECMP is formed within the same dynamic routing protocol or between static routes with the same management distance. Protection, no protection for routing protocols with different priorities

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A prioritized multi-master and multi-standby fast rerouting system and method

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment

[0071] According to a specific embodiment of the present invention, the method also includes:

[0072] Create the next-hop link reachability detection table, the next-hop address reachability detection table, and the next-hop ECMP group reachability detection table. When the next-hop reachability change event is detected, the event will be linked to respond to the event. , in order to achieve sub-second fast rerouting protection, both ECMP group member unreachability and next-hop unreachable detection can be implemented at high speed based on hardware detection, including detecting the linkdown event of the next-hop interface; detecting the next-hop IP address through BFD accessibility, etc.

[0073] Retrieve the next hop table according to the changed next hop or next hop ECMP group, and update the next hop reachability information in the next hop table;

[0074] Retrieve the FRR group table according to the changed next hop or next hop ECMP group, and update the correspondi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a multi-master and multi-standby fast rerouting system with different priorities, including a CPU control plane and a hardware data plane. The CPU control plane runs a variety of routing protocols, calculates routing information, and generates multiple Manage the next-hop ECMP group of the distance, and select the primary next-hop ECMP group and backup next-hop ECMP group according to the priority of route management among multiple next-hop ECMP groups, and assign the primary next-hop ECMP group and backup next-hop ECMP group A one-hop ECMP group constitutes a FRR group; the hardware data plane creates a routing prefix, and creates the primary next-hop ECMP group as a working FEC entry of the ECMP group type, and creates the backup next-hop ECMP group as a protection FEC entry of the ECMP group type , create a corresponding protection switching FEC entry, cascade the protection switching FEC entry to the next-level working FEC entry and protection FEC entry, and set the next hop of the routing prefix as the protection switching FEC. The invention realizes the technical solution of priority-discriminating ECMP group-based multi-master and multi-standby fast rerouting.

Description

technical field [0001] The present invention relates to the technical field of communication, in particular to a multi-master and multi-standby fast rerouting system and method for distinguishing priorities. Background technique [0002] In IP network routing and forwarding, fast rerouting (Fast ReRoute, FRR) is typically applied to scenarios such as protection switching of multiple next-hop links. Based on FRR technology, for a route to the same destination, an active and standby protection path is formed between multiple next hops. The router only needs to detect and modify the status of the next hop of the IP route, and actively and timely switch traffic to On the backup path of IP FRR. [0003] Equal Cost Multi-Path (ECMP) exists in a network environment where multiple different links with the same cost reach the same destination address. Similar to FRR, ECMP is also formed between multiple next hops to the same destination. The difference is that ECMP is to achieve t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): H04L45/247H04L45/74H04L47/125
CPCH04L45/22H04L45/74H04L47/125Y02D30/50
Inventor 喻胜鲍四海郭家诚王文其
Owner UTSTARCOM TELECOM CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products