Assembly process of a sealed outdoor tool shed
Through the modular design and folding transportation of the outdoor tool room, the time-consuming and labor-intensive assembly problem in the existing technology is solved, a fast and convenient assembly process is achieved, and the difficulty of operation is reduced.
Patent Information
- Application Number
- CN202411327784.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2044-09-24
AI Technical Summary
The assembly process of the existing outdoor tool room is time-consuming and laborious, and has high professionalism requirements for assembly personnel and is difficult.
Through the modular design of the outdoor tool room and the folding transportation method, the assembly can be completed through simple folding steps after arriving at the destination, which simplifies the assembly steps and reduces the difficulty.
It realizes the quick and convenient assembly of the tool room, reduces the difficulty of operation, is suitable for single-person assembly, and improves the rigidity and strength of the tool room during transportation.
Smart Images

Figure CN118855100B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of outdoor tool shed structures, and in particular to an assembly process of a sealed outdoor tool shed. Background Art
[0002] An outdoor tool shed is a small building used to store outdoor tools and equipment. It is mostly made of environmentally friendly materials, such as wood-plastic materials, to reduce pollution to the environment. During the transportation of an outdoor tool shed, in order to facilitate transportation, the outdoor tool shed is often disassembled before transportation, and then assembled after transportation to the destination, which requires the assemblers to have a certain degree of professionalism, and the assemblers need to spend a lot of time on assembly.
[0003] For example, in the Chinese patent application number 202010755698.3, a tool shed and its assembly method are disclosed. Among them, the tool shed includes a shed body and a roof; the shed body is formed by connecting the first front side panel, the first side panel, the rear side panel, the second side panel and the second front side panel in sequence, and corresponding columns are respectively arranged between the first front side panel and the first side panel, between the first side panel and the rear side panel, between the rear side panel and the second side panel, and between the second side panel and the second front side panel; the roof is assembled by the first front eaves member, the second front eaves member, the first side eaves member, the second side eaves member, the first rear eaves member, the second rear eaves member, the eaves panel connector and a plurality of eaves panels.
[0004] When assembling the above tool room, the following steps need to be performed:
[0005] ①. First, connect the first side panel, the rear side panel and the second side panel in sequence. When connecting, the upper corners and lower corners of the two adjacent side panels are connected and positioned by triangular connecting plates respectively; ②. Then connect the first front side panel with the first side panel, and the upper corners and lower corners of the two are connected and positioned by triangular connecting plates respectively; connect the second front side panel with the second side panel, and the upper corners and lower corners of the two are connected and positioned by triangular connecting plates respectively; ③. Install the door panel on the second front side panel, install the front upper edge plate above the first front side panel and the second front side panel, and install the rear upper edge plate above the rear side panel; ④. Connect the eaves panel connecting piece, the first front eaves piece, and the second front eaves piece, then connect one end of the eaves panel with the eaves panel connecting piece, and finally install and connect the first side eaves piece, the first rear eaves piece, the second rear eaves piece and the second side eaves piece in the corresponding positions of the eaves panel in sequence.
[0006] From the above assembly steps, it can be seen that the entire assembly process is time-consuming and labor-intensive, and has very high professional requirements for the assemblers, and the assembly is very difficult. Summary of the invention
[0007] In view of the above problems, the present invention provides an assembly process for a sealed outdoor tool shed. By modularizing the outdoor tool shed, the tool shed can be folded for transportation. After the tool shed is transported to the designated location, the tool shed can be assembled by simply folding it, which simplifies the assembly steps of the tool shed and reduces the difficulty of assembling the tool shed, making the tool shed easier to transport and assemble.
[0008] To achieve the above object, the present invention provides the following technical solutions:
[0009] An assembly process for a sealed outdoor tool shed comprises the following steps:
[0010] Step a: Positioning and placing: select a suitable and flat place and place the folded tool room so that the bottom plate is horizontal;
[0011] Step b, erecting the panel once, folding the first wall panel provided with the door and in a horizontal folded storage state, so that the first wall panel is transformed into a vertically unfolded state;
[0012] Step c, secondary vertical panel, folding the second wall panel facing the first wall panel, so that the second wall panel in the horizontal folded storage state is transformed into a vertically unfolded state;
[0013] Step d, lifting the top plate, by activating the lifting mechanism located at the second wall plate, so that the top plate is raised to the limit position;
[0014] Step e, side wall panels, synchronously with step d, the side wall panels hinged on both sides of the top panel are folded synchronously with the lifting of the top panel, so that the side wall panels in the horizontal folded storage state are transformed into the vertical unfolded state;
[0015] Step f, the hanging board is erected, and synchronously with step d, the hanging boards arranged between the top board and the side wall board and between the bottom board and the side wall board are unfolded synchronously with the lifting of the top board.
[0016] As an improvement, the installation order of step b and step c can be swapped.
[0017] As an improvement, in step b and step c, the door, the first wall panel and the second wall panel are all three-section folding structures, and locking structures are provided at the folding parts of the door, the first wall panel and the second wall panel.
[0018] As an improvement, the side walls of the first wall panel and the second wall panel facing each other are both provided with outwardly protruding limiting frames.
[0019] As an improvement, in step d, when the top plate is lifted to the extreme position, the top plate and the top cross frame of the limit frame are in contact and sealed cooperation with each other.
[0020] As an improvement, a light-transmitting skylight is provided on the top plate.
[0021] As an improvement, in step e, the side wall panel is a folded structure, and a locking structure is provided at the folded portion of the side wall panel.
[0022] As an improvement, the locking structure is used to lock the flipping and folding freedom of the folding structure, and the locking structure includes a locking hook, a locking ring and a self-locking member;
[0023] The locking hook is fixedly arranged on any folding part of the folding structure;
[0024] The locking ring is slidably disposed on the other folding portion of the folding structure, and when the locking ring is buckled with the locking hook, the folding structure is locked;
[0025] The self-locking member is arranged on the locking ring. When the locking ring is buckled with the locking hook, the self-locking member applies a pulling force on the locking hook, so that the locking hook is tightly buckled with the locking ring.
[0026] As an improvement, one end of the hanging plate is hingedly mounted on the corresponding side wall plate, and the other end of the hanging plate slides on the bottom plate or the top plate through a slider;
[0027] The hanging plate contains permanent magnetic material, and a plurality of hanging rods are evenly distributed on the hanging plate. The surfaces of the hanging rods are provided with threads. When the side wall plates are horizontally folded, the hanging rods support the top plate.
[0028] As an improvement, the lifting mechanism includes a lifting assembly, a transmission assembly and a driving member;
[0029] The lifting assembly is provided with two groups, and the lifting assembly is respectively provided on both sides of the top plate, and the lifting assembly is respectively connected to a group of the side wall panels, and the lifting assembly drives the top plate to be lifted and lowered by changing the angle α between the support roller supporting the top plate and the bottom plate;
[0030] The transmission assembly is transmission-connected to the two groups of lifting assemblies, and the transmission assembly enables the lifting assemblies to be lifted synchronously;
[0031] The driving member drives the lifting assembly to work through the transmission assembly.
[0032] The beneficial effects of the present invention are:
[0033] (1) The present invention modularizes the tool room so that the front and rear first wall panels, the second wall panels and the side wall panels on both sides of the tool room are foldable and flippable, thereby reducing the volume of the tool room and making it easier to transport the tool room. In addition, during the assembly process, the tool room can be assembled quickly and conveniently by simply folding the first wall panel, the second wall panel and the side wall panels on both sides.
[0034] (2) The present invention adopts a modular design of a foldable structure of the door, the first wall panel, the second wall panel and the side wall panel, so that after the tool room is transported from the factory to the destination, the door, the first wall panel, the second wall panel, the side wall panel and the bottom panel have been installed and connected with each other, and there is no need to assemble the panels. Even a single person can perform the assembly work;
[0035] (3) The present invention improves the first wall panel and the second wall panel of the tool room so that the vertical first wall panel and the second wall panel guide the lifting of the top panel, and when the top panel is lifted to the top limit position, the top panel abuts against the limit frame protruding from the top of the first wall panel and the second wall panel, so that the top panel seals the joint of the first wall panel and the second wall panel. At the same time, the top panel supports the first wall panel and the second wall panel, maintains the strength of the first wall panel and the second wall panel standing upright, and enhances the supporting rigidity of the overall structure of the tool room;
[0036] (4) The present invention provides locking structures at the folding parts of the first wall panel, the second wall panel and the side wall panel of the tool room respectively, and uses the locking structures to lock the first wall panel, the second wall panel and the side wall panel after they are vertically erected, so that after the first wall panel, the second wall panel and the side wall panel are assembled, the strength of the overall wall panel and the stability of the connection are enhanced;
[0037] (5) The present invention provides a hanging board in the tool room. When the side wall panel is unfolded, the hanging board is also automatically unfolded. The hanging board is used to hang tools, thereby avoiding processing on the wall panel and installing components for hanging tools, which would damage the strength of the wall panel. When the tool room is in a folded state, the hanging rods on the hanging board support the folded first wall panel, the second wall panel, the side wall panel and the top panel, thereby avoiding damage to the connecting parts of the tool room due to squeezing during transportation, thereby enhancing the rigidity of the tool room during transportation.
[0038] (6) The present invention utilizes a lifting mechanism to lift the top plate and simultaneously unfold the side wall panels, thereby reducing the difficulty of operation for operators. When the top plate is lifted to the limit position, the lifting mechanism can automatically self-lock and lock the top plate to prevent the top plate from falling back, thereby ensuring smooth assembly of the tool room.
[0039] In summary, the present invention has the advantages of quick assembly, low assembly difficulty, low professional requirements for assemblers, small space occupied during transportation, and convenient transportation, and is particularly suitable for the field of outdoor tool room assembly technology. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a stereogram showing the outdoor tool shed of the present invention after assembly;
[0041] Figure 2 It is a side view schematic diagram of the outdoor tool shed of the present invention in a folded state;
[0042] Figure 3 It is a three-dimensional schematic diagram of the outdoor tool shed of the present invention in a folded state;
[0043] Figure 4 This is a schematic diagram of the first wall of the outdoor tool room of the present invention;
[0044] Figure 5 This is a schematic diagram of the second wall of the outdoor tool room of the present invention;
[0045] Figure 6 This is a schematic diagram of the first wall and the second wall of the present invention being flipped and unfolded;
[0046] Figure 7 This is a schematic diagram of the outdoor tool room roof in the lifted state according to the present invention;
[0047] Figure 8 This is a schematic diagram of the side wall panel of an outdoor tool room of the present invention;
[0048] Fig. 9 This is a schematic diagram of the supporting state of the diagonal support rod of the present invention;
[0049] Fig.10 This is a schematic diagram of the working state of the lock structure of the present invention;
[0050] Fig.11 It is a schematic diagram of the three-dimensional structure of the lock structure of the present invention;
[0051] Fig.12 It is a schematic diagram of the three-dimensional structure of the lifting mechanism of the present invention;
[0052] Fig.13 for Fig.12 A schematic diagram of the structure enlargement;
[0053] Fig.14 This is a schematic diagram of the cooperation between the sliding block and the horizontal groove of the present invention;
[0054] Fig.15 This is a schematic diagram of the connection structure between the support roller and the top plate of the present invention;
[0055] Fig.16 for Fig.15A magnified schematic diagram of the structure at B in the middle;
[0056] Fig.17 This is a schematic diagram of the cooperation between the connecting block and the vertical groove of the present invention;
[0057] Fig.18 It is a schematic diagram of the support of the hanging board of the outdoor tool room of the present invention in the folded state;
[0058] Fig.19 This is a schematic diagram of the connection state between the hanging plate and the slider of the present invention;
[0059] Fig. 20 The three-dimensional structure of the hanging plate of the present invention is shown in FIG. Figure 1 ;
[0060] Fig.21 The three-dimensional structure of the hanging plate of the present invention is shown in FIG. Figure 2 .
[0061] In the figure: horizontal groove 001, vertical groove 002, bottom plate 1, supporting diagonal rod 100, aluminum alloy frame 101, iron sheet 102, door 2, lock 21, door handle 22, first wall panel 3, limit frame 31, top horizontal frame 311, second wall panel 4, top plate 5, skylight 51, side wall panel 6, lock structure 7, lock hook 71, lock ring 72, handle 721, lock ring seat 722, self-locking part 73, hanging plate 8, hanging rod 81, slider 82, horizontal bar 83, installation groove 84, lifting mechanism 9, lifting assembly 91, support roller 911, screw rod 912, screw rod nut 913, sliding block 914, connecting block 915, transmission assembly 92, driving member 93. DETAILED DESCRIPTION
[0062] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0063] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0064] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0065] Embodiment 1:
[0066] like Figures 1 to 9 As shown, an assembly process of a sealed outdoor tool shed includes the following steps:
[0067] Step a: Positioning and placing: select a suitable and flat place to place the folded tool shed so that the bottom plate 1 is horizontally placed. In order to strengthen the connection strength between the tool shed and the ground, iron blocks can be set at the four corners of the bottom plate 1 to connect and reinforce the bottom plate 1 with the ground.
[0068] Step b, erecting the panel once, folding the first wall panel 3 provided with the door 2 and in a horizontal folded storage state, so that the first wall panel 3 is transformed into a vertically unfolded state, wherein the door 2 is also a folding structure, and the door 2 can be rotated and swung on the first wall panel 3 through hinges, and a lock 21 and a recessed door handle 22 of the sliding door 2 are also provided between the door 2 and the first wall panel 3, the lock 21 is used to lock the door 2 and the first wall panel 3, the door 2 and the first wall panel 3 are both three-section folding structures, and the folding parts of the door 2 and the first wall panel 3 are provided with a locking structure 7, when each part is in a folded state, the locking structure 7 is not locked, and when each part is flipped into place, the locking structure 7 is used to lock each part of the door 2 and the first wall panel 3 to form a whole, after the first wall panel 3 is flipped and erected, in order to ensure that the first wall panel 3 does not collapse, a supporting diagonal rod 100 can be installed on the first wall panel 3, and the supporting diagonal rod 100 is used to tilt and support and fix the first wall panel 3;
[0069] Step c, secondary vertical panel, folding the second wall panel 4 facing the first wall panel 3, so that the second wall panel 4 in the horizontal folded storage state is transformed into the vertical unfolded state, the second wall panel 4 is a three-section folding structure, and the folded parts of the second wall panel 4 are provided with a locking structure 7, similarly, the locking structure 7 locks the parts of the second wall panel 4 into one, and the second wall panel 4 can also be supported by setting a supporting diagonal rod 100 to tilt it;
[0070] Step d, lifting the top plate, by starting the lifting mechanism 9 located at the second wall panel 4, so that the top plate 5 is lifted to the limit position, the side walls of the first wall panel 3 and the second wall panel 4 that are arranged opposite to each other are both provided with a limit frame 31 protruding outward, when the top plate 5 is lifted to the limit position, the top plate 5 and the top transverse frame 311 of the limit frame 31 are in abutment and sealing arrangement, and a flexible extrusion-fitting sealing strip is provided at the abutment and matching position between the top plate 5 and the transverse frame 311;
[0071] In addition, a light-transmitting skylight 51 is provided on the top plate 5. The number of skylights 51 is preferably at least one. In the present application, four skylights 51 are provided. The skylight 51 is composed of a window frame and a glass plate. The window frame is an aluminum alloy window frame installed on the aluminum alloy frame 101. The glass plate is installed in the aluminum alloy window frame. Natural light outside the tool room enters the tool room through the skylight 51. It is further explained that an electric lighting system can be provided inside the tool room. The electric lighting system can be an energy storage lighting system or an AC lighting system.
[0072] Step e, side wall panel uprights, synchronously with step d, the side wall panels 6 hinged on both sides of the top panel 5 are folded synchronously with the lifting of the top panel 5, so that the side wall panels 6 in the horizontal folded storage state are transformed into the vertical unfolded state, and the connection parts of the side wall panels 6 and the top panel 5 are provided with flexible extrusion-matched sealing strips to ensure the sealing between the side wall panels 6 and the top panel 5, and inclined supporting diagonal rods 100 can be provided at the side wall panels 6 on both sides to support and reinforce the side wall panels 6, the side wall panels 6 are a folding structure folded in half, and the folding parts of the side wall panels 6 are provided with locking structures 7;
[0073] Step f, erecting the hanging plate. Synchronously with step d, the hanging plates 8 arranged between the top plate 5 and the side wall plate 6 and between the bottom plate 1 and the side wall plate 6 are unfolded synchronously with the lifting of the top plate 5. The hanging plates 8 are used to hang tools. One end of the hanging plates 8 is hingedly mounted on the corresponding side wall plate 6. The other end of the hanging plates 8 slides on the bottom plate 1 or the top plate 5 through a slider 82. A slide groove for the slider 82 to slide is provided on the cross bar of the aluminum alloy frame 101 of the bottom plate 1 or the top plate 5.
[0074] like Figures 18 to 21 As shown, the hanging plate 8 contains permanent magnetic material, and a plurality of hanging rods 81 are evenly distributed on the hanging plate 8. The surface of the hanging rods 81 is provided with threads. When the side wall plate 6 is horizontally folded, the hanging rods 81 support the top plate 5. Some tools made of magnetic metal can be directly adsorbed on the hanging plate 8. For some tools with relatively large mass, a cross bar 83 can be installed on the hanging rod 81, and the tools can be mounted by using the installation groove 84 formed between the cross bar 83 and the hanging plate 8.
[0075] In addition, the hanging rod 81 is made of high-strength PC, PA or PPS material. When the tool room is in a folded state, the hanging rod 81 plays a supporting role between the top panel 5 and the side wall panel 6 and between the side wall panel 6 and the bottom panel 1, respectively, to prevent the folded first wall panel 3, the second wall panel 4 and the side wall panel 6 from being over-folded when the tool room is folded for transportation, resulting in damage to the hinges and hinges. When the hanging rod 81 supports the top panel 5, since the height of the skylight 51 is higher than the height of the top panel 5, when the hanging rod 81 supports the top panel 5, the hanging rod 81 does not contact the skylight 51 and does not damage the skylight 51.
[0076] In addition, the object hanging rod 81 is passed through the object hanging plate 8, and the two ends of the object hanging plate 8 are locked and installed by nuts, so that the object hanging rod 81 can be adjusted.
[0077] The installation sequence of step b and step c can be interchanged, and the top panel 5 can be lifted only after the first wall panel 3 and the second wall panel 4 have been erected with resin.
[0078] It is further explained that the bottom plate 1, the door 2, the first wall panel 3, the second wall panel 4, the top plate 5 and the side wall panel 6 are all prepared by an aluminum alloy frame 101 and an iron sheet 102, and a lightweight flame retardant thermal insulation material is filled between the aluminum alloy frames 101. The flame retardant thermal insulation material is preferably one or more of polystyrene foam board, extruded polystyrene foam board or polyurethane foam board.
[0079] Embodiment 2:
[0080] The lock structure of Example 2 of the present invention is described with reference to Example 1.
[0081] like Fig.10 and Fig.11 As shown, the locking structure 7 is used to lock the flipping and folding freedom of the folding structure, and the locking structure 7 includes a locking hook 71, a locking ring 72 and a self-locking member 73;
[0082] The locking hook 71 is fixedly arranged on any folding part of the folding structure by a threaded fastener, and preferably the locking hook 71 is arranged on the folding part located at the upper part;
[0083] The locking ring 72 is slidably arranged on another folding part of the folding structure. When the locking ring 72 is engaged with the locking hook 71, the folding structure is locked. The locking ring 72 is hinged to the handle 721 which is arranged to rotate and swing, and the handle 721 is installed on the folding part of the lower part of the folding structure through the locking ring seat 722. A self-locking member 73 is provided at the position where the handle 721 and the locking ring 72 are connected. The self-locking member 73 is an elastic and retractable spring member. When the handle 721 is turned around the locking ring seat 722, the locking ring 72 is hung on the locking hook 71. After that, the handle 721 continues to turn over, so that a relative displacement occurs between the handle 721 and the locking ring 72, and the self-locking member 73 is stretched. Then, when the locking ring 72 is engaged with the locking hook 71, the self-locking member 73 applies a pulling force on the locking hook 71, so that the locking hook 71 and the locking ring 72 are tightly engaged, and the locking hook 71 and the locking ring 72 will not be separated.
[0084] Embodiment 3:
[0085] The lifting mechanism of Example 3 of the present invention is described with reference to Example 1.
[0086] like Figures 12 to 17 As shown, the lifting mechanism 9 includes a lifting component 91, a transmission component 92 and a driving component 93;
[0087] The lifting assembly 91 is provided with two groups, and the lifting assembly 91 is respectively provided on both sides of the top plate 5, and the lifting assembly 91 is respectively connected to a group of the side wall panels 6. The lifting assembly 91 drives the top plate 5 to be lifted and lowered by changing the angle α between the support roller 911 supporting the top plate 5 and the bottom plate 1. Specifically, the lifting assembly 91 includes a screw rod 912, a screw rod nut 913, a sliding block 914 and a connecting block 915. The screw rod 912 is rotatably installed at the bottom of the first wall panel 3 or the second wall panel 4. Bearings are provided at both ends of the screw rod 912. A screw rod nut 913 is sleeved on the screw rod 912, and the screw rod nut 913 is embedded in the sliding block 914. The sliding block 914 is slidably provided on the aluminum alloy frame 10 of the bottom plate 1 1, and the connecting block 915 is slidably installed in the vertical groove 002 of the aluminum alloy frame 101 of the first wall panel 3 or the second wall panel 4, and the connecting block 915 is connected with the angle of one side of the top plate 5, and the support roller 911 is hingedly installed between the sliding block 914 and the connecting block 915. When the screw rod 912 rotates, the circumferential degree of freedom of the screw nut 913 is limited by the sliding block 914, so that the screw nut 913 can only move along the screw rod 912. When the screw nut 913 moves, it drives the sliding block 914 to move in the horizontal groove 001. During the movement of the sliding block 914, the angle between the support roller 911 and the horizontal plane will be changed, so that the top plate 5 is lifted by the support roller 911;
[0088] In addition, the transmission assembly 92 is connected to the two groups of lifting assemblies 91, and the transmission assembly 92 enables the lifting assemblies 91 to be lifted synchronously. The transmission assembly 92 is a sprocket transmission assembly, and the sprockets are respectively installed on the two groups of screw rods 912, and the sprockets are connected by winding chains.
[0089] Furthermore, the driving member 93 drives the lifting assembly 91 to work through the transmission assembly 92. The driving member 93 can be a manual driving member or an electric driving member. The preferred hand wheel in the present application is rotatably arranged. The hand wheel is connected to any screw rod 912 through a chain drive, or the hand wheel can be directly installed on the screw rod 912, and the screw rod 912 is driven to rotate by rotating the hand wheel.
[0090] It should be noted that, as described in Example 1, the wall of the tool room is made of an aluminum alloy frame 101 and an iron sheet 102, with lightweight flame-retardant insulation material filled in the middle. Therefore, the overall quality of the wall of the tool room is not high, and the lifting of the top plate 5 can be completely achieved through manual operation.
[0091] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An assembly process for a sealed outdoor tool shed, characterized in that: The following steps are involved: Step a: Positioning and placing: Select a suitable and flat location and place the folded tool room so that the bottom plate (1) is horizontal; Step b: erecting the panel once, folding the first wall panel (3) provided with the door (2) and in a horizontally folded storage state, so that the first wall panel (3) is transformed into a vertically unfolded state; Step c, secondary vertical panel, folding the second wall panel (4) facing the first wall panel (3), so that the second wall panel (4) in a horizontal folded storage state is transformed into a vertically unfolded state, the side walls of the first wall panel (3) and the second wall panel (4) facing each other are both provided with outwardly protruding limit frames (31), the door (2), the first wall panel (3) and the second wall panel (4) are all three-section folding structures, and the folding parts of the door (2), the first wall panel (3) and the second wall panel (4) are all provided with locking structures (7); Step d, lifting the top plate, by activating the lifting mechanism (9) located at the second wall plate (4), so that the top plate (5) is lifted to the limit position, and when the top plate (5) is lifted to the limit position, the top plate (5) and the top horizontal frame (311) of the limit frame (31) are in contact and sealed cooperation; Step e, side wall panel uprights, synchronously with step d, the side wall panels (6) hinged on both sides of the top panel (5) are folded synchronously with the lifting of the top panel (5), so that the side wall panels (6) in a horizontally folded storage state are transformed into a vertically unfolded state; Step f, the hanging board is erected, and synchronously with step d, the hanging board (8) arranged between the top board (5) and the side wall board (6) and between the bottom board (1) and the side wall board (6) is unfolded synchronously with the lifting of the top board (5).
2. The assembly process of a sealed outdoor tool shed according to claim 1, characterized in that: The installation order of step b and step c can be swapped.
3. The assembly process of a sealed outdoor tool shed according to claim 1, characterized in that: A light-transmitting skylight (51) is provided on the top plate (5).
4. The assembly process of a sealed outdoor tool shed according to claim 1, characterized in that: In the step e, the side wall panel (6) is a foldable structure that is folded in half, and a locking structure (7) is provided at each folded portion of the side wall panel (6).
5. The assembly process of a sealed outdoor tool shed according to claim 1 or 4, characterized in that: The locking structure (7) is used to lock the flipping and folding freedom of the folding structure, and the locking structure (7) comprises a locking hook (71), a locking ring (72) and a self-locking member (73); The locking hook (71) is fixedly arranged on any folding portion of the folding structure; The locking ring (72) is slidably disposed on another folding portion of the folding structure, and when the locking ring (72) is buckled with the locking hook (71), the folding structure is locked; The self-locking member (73) is provided on the locking ring (72); when the locking ring (72) and the locking hook (71) are buckled together, the self-locking member (73) applies a pulling force on the locking hook (71), so that the locking hook (71) and the locking ring (72) are tightly buckled together.
6. The assembly process of a sealed outdoor tool shed according to claim 1, characterized in that: One end of the hanging plate (8) is hingedly mounted on the corresponding side wall plate (6), and the other end of the hanging plate (8) slides on the bottom plate (1) or the top plate (5) via a slider (82); The hanging plate (8) contains permanent magnetic material, and a plurality of hanging rods (81) are evenly distributed on the hanging plate (8). The surfaces of the hanging rods (81) are provided with threads, and when the side wall panels (6) are in a horizontally folded state, the hanging rods (81) support the top panel (5).
7. The assembly process of a sealed outdoor tool shed according to claim 1, characterized in that: The lifting mechanism (9) comprises a lifting component (91), a transmission component (92) and a driving component (93); The lifting components (91) are provided in two groups. The lifting components (91) are respectively provided on both sides of the top plate (5), and the lifting components (91) are respectively connected to a group of the side wall panels (6) correspondingly. The lifting components (91) drive the top plate (5) to be raised and lowered by changing the angle α between the support roller (911) supporting the top plate (5) and the bottom plate (1); The transmission assembly (92) is transmission-connected to the two groups of lifting assemblies (91), and the transmission assembly (92) enables the lifting assemblies (91) to be lifted synchronously; The driving member (93) drives the lifting assembly (91) to work via the transmission assembly (92).
Citation Information
Patent Citations
Tool room and assembling method thereof
CN112093209A
Self-jacking folding house and building method thereof
CN116695885A
Integral type spring lock frame
CN205778038U
Folding beam structure of house capable of being quickly disassembled and assembled
CN215166493U
A multifunctional outdoor tool room
CN221031690U