Stock bin steam preheating method

By installing fixed blocks and steam nozzles on the inner wall of the silo, combined with sensors and PLC control systems, uniform steam injection and distribution in the silo is achieved, which solves the problems of uneven temperature distribution and heating blind spots, and improves the heating effect of the silo and productivity.

CN118912492APending Publication Date: 2024-11-08LAIWU TAISHAN COKING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411049089.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

The temperature distribution in the existing silos is uneven, and the temperature deviation of the materials on the north and south sides is large, and there are heating blind spots, which affects the heating effect and production efficiency.

Method used

Install a fixed block on the inner wall of the silo to fix the steam nozzle, and achieve uniform injection and distribution of steam through components such as steam nozzle, steam ring pipe and connecting valve. Combined with temperature and pressure sensors and PLC control system, the steam flow rate is dynamically adjusted. Ensure even heating.

Benefits of technology

Effectively increase the average temperature of the mixture, reduce the thickness of the sintered overwet layer, improve the quality of sintered ore, reduce fuel consumption, eliminate the impact of dew point temperature on the sintering process, realize the operation of the ultra-thick silo, and reduce the fuel consumption of sintered ore, which solves the problem of Problems of uneven temperature distribution and heating blind spots.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118912492A_ABST
    Figure CN118912492A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of stock bin equipment, and relates to a stock bin steam preheating method which comprises the steps that a fixing block is installed on the inner wall of a stock bin; the steam spray pipe is fixed on the fixed block; a steam nozzle is arranged at the front end of the steam spray pipe; connecting pipes are led out of one sides of the steam spraying pipes to be connected to steam ring pipes; the steam ring pipe is connected to the outer wall of the stock bin through a hanging seat; and connecting a steam inlet pipe to the steam ring pipe. According to the invention, the average temperature of the mixture is effectively increased, the thickness of a sintered superwet layer is reduced, a low-water and low-carbon thick material sintering technology is realized, the quality of sintered ore is improved, the fuel consumption is reduced, the dew-point temperature is eliminated, the influence of the sintered superwet layer on the sintering process is reduced, the operation of a super-thick stock bin is realized, and the fuel unit consumption of the sintered ore is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of silo equipment, and in particular relates to a silo steam preheating method. Background Art

[0002] A silo is a container used to store and handle bulk materials. It is widely used in mining, metallurgy, building materials, chemical industry and other industries. Its main function is to store materials and transport them to the required location through conveying equipment. Silos are usually made of steel or concrete.

[0003] The temperature distribution in the silo of the prior art is uneven, especially the temperature deviation between the north and south sides is large, there may be a temperature difference of up to 20°C, and there are heating blind spots, such as the corners of the silo or the densely packed material area, which may not be effectively heated by steam at all, resulting in heating blind spots. The material temperature in the heating blind spots cannot reach the expected level, affecting the overall heating effect and production efficiency.

[0004] Therefore, a silo steam preheating method is proposed to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a silo steam preheating method, which has the silo steam preheating function and solves the problems of uneven temperature distribution in the silo in the prior art, large material temperature deviation on the north and south sides and the existence of a heating blind area.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is that the present invention provides a silo steam preheating method, comprising the following steps:

[0007] 1) Install the fixing block on the inner wall of the silo;

[0008] 2) The steam nozzle is fixed on the fixed block, and the front end of the steam nozzle is set as a steam nozzle;

[0009] 3) The connecting pipe leading out from one side of the steam nozzle is connected to the steam ring pipe;

[0010] 4) The steam ring pipe is connected to the outer wall of the silo through a hanger;

[0011] 5) Connect the steam inlet pipe to the steam ring pipe.

[0012] Specifically, in step 1), 8 fixed blocks are installed on the east and west sides of the inner wall of the silo, and 3 fixed blocks are installed on the south and north sides. The fixed blocks are installed in a staggered and dense manner, and steam nozzles are installed corresponding to the number of fixed blocks.

[0013] Specifically, in step 2), the steam nozzle is inserted into the fixing block and passes through the side wall of the silo, and the steam nozzle is fixed at an angle.

[0014] Specifically, the steam nozzle in step 2) is designed to be T-shaped.

[0015] Specifically, in step 2), a plugging cap is installed at the rear side of the steam nozzle, and a cap handle is provided on the plugging cap.

[0016] Specifically, in step 3), a connecting valve is installed on the connecting pipe, and the connecting valve is a ball valve or a solenoid valve.

[0017] Specifically, a temperature sensor is installed inside the silo, and a temperature sensor and a pressure sensor are installed inside the steam inlet pipe and the steam ring pipe.

[0018] Specifically, the connecting valve model is a solenoid valve, and the connecting valve is communicatively connected to a PLC to control steam flow.

[0019] Specifically, a temperature sensor is installed inside the silo, a temperature sensor and a pressure sensor are installed inside the steam inlet pipe and the steam ring pipe, and an electric heater is installed inside the steam ring pipe.

[0020] Specifically, the temperature sensor and the pressure sensor are communicatively connected to the PLC, and the temperature sensor and the pressure sensor are interlocked with the solenoid valve.

[0021] Compared with the prior art, the advantages and positive effects of the present invention are:

[0022] 1. The present invention effectively increases the average temperature of the mixed material, reduces the thickness of the sintering over-wet layer, realizes the low-water, low-carbon thick material sintering technology, improves the quality of sintered ore, reduces fuel consumption, eliminates the dew point temperature and reduces the influence of the sintering over-wet layer on the sintering process, realizes the operation of ultra-thick silos, and reduces the unit fuel consumption of sintered ore;

[0023] 2. The present invention has the function of steam preheating the silo, which solves the problems of uneven temperature distribution in the silo of the prior art, large temperature deviation between the north and south sides, and heating blind spots. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0025] Figure 1 It is a structural diagram of an embodiment of a silo steam preheating method;

[0026] Figure 2 It is a partial structural diagram of an embodiment of a silo steam preheating method;

[0027] Figure 3 It is a partial structural diagram of an embodiment of a silo steam preheating method;

[0028] Figure 4 It is a partial structural diagram of an embodiment of a silo steam preheating method;

[0029] Figure 5 It is a partial structural diagram of an embodiment of a silo steam preheating method;

[0030] In the above figures, 1, silo, 2, fixing block, 3, steam nozzle, 4, steam nozzle, 5, plugging cap, 6, connecting pipe, 7, steam ring pipe, 8, connecting valve, 9, hanging seat, 10, steam inlet pipe, 11, cap handle. DETAILED DESCRIPTION

[0031] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0032] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways than those described herein. Therefore, the present invention is not limited to the specific embodiments of the following disclosure.

[0033] Embodiment 1, a method for preheating silo steam, comprising the following steps:

[0034] 1) Install the fixing block on the inner wall of the silo;

[0035] 2) The steam nozzle is fixed on the fixed block, and the front end of the steam nozzle is set as a steam nozzle;

[0036] 3) The connecting pipe leading out from one side of the steam nozzle is connected to the steam ring pipe;

[0037] 4) The steam ring pipe is connected to the outer wall of the silo through a hanger;

[0038] 5) Connect the steam inlet pipe to the steam ring pipe.

[0039] The fixing block provides support for the steam nozzle so that it can be firmly installed on the inner wall of the silo. The position of the fixing block is arranged according to the needs to ensure that the steam nozzle is evenly distributed and the steam injection effect is optimized. At the same time, the fixing block can reinforce the inner wall of the silo to avoid leakage and collapse of the inner wall of the silo due to the setting of the steam nozzle.

[0040] The steam nozzle sprays steam into the silo through the steam nozzle to heat the material in the silo. The steam nozzle controls the steam spray path to make the heating more uniform.

[0041] The connecting pipe transports the steam to the steam nozzle to realize the steam transportation. The steam ring pipe surrounds the outer wall of the silo and evenly distributes the steam to each connecting pipe and steam nozzle. The hanger provides support to fix the steam ring pipe firmly on the outer wall of the silo.

[0042] The steam inlet pipe is connected to an external steam source and delivers steam to the steam ring pipe. Through the steam inlet pipe, steam can be supplied stably.

[0043] The following is a detailed description of the design of the above key components:

[0044] Step 1) 8 fixed blocks are installed on the east and west sides of the inner wall of the silo, and 3 fixed blocks are installed on the south and north sides. The fixed blocks are installed in a staggered and dense manner to avoid the concentrated arrangement of steam nozzles and ensure uniform distribution of steam. Steam nozzles are installed corresponding to the number of fixed blocks.

[0045] The fixing block is generally made of high-strength heat-resistant materials, such as stainless steel or high-temperature resistant alloys, to withstand the high temperature and pressure of steam. The fixing block is designed to be rectangular or circular, and is customized according to the shape of the silo wall and the diameter of the steam nozzle. The height and width of each fixing block should be sufficient to support the weight of the steam nozzle to maintain stability. It is fixed to the inner wall of the silo by welding or bolts to ensure the stability and durability of the fixing block.

[0046] Step 2) The steam nozzle is inserted into the fixed block and passes through the side wall of the silo, and the steam nozzle is fixed at an angle. The steam nozzle is fixed at an angle, and the angle of inclination is generally between 30° and 45°, which is adjusted according to the shape of the silo and the material accumulation. Since the steam nozzle needs to pass through the side wall of the silo, a hole needs to be reserved on the side wall, and a fixed block is used to seal it to ensure sealing.

[0047] The steam nozzle is made of stainless steel or alloy steel that is resistant to high temperature and high pressure to ensure long-term use in high temperature and high pressure environments. The length of the steam nozzle is usually 15-20 cm, and the tail end of the steam nozzle is exposed 5-10 cm from the outside of the silo side wall. The diameter of the steam nozzle is designed according to the steam flow demand, which is generally 1-2 inches. The part of the steam nozzle that passes through the silo side wall needs to be equipped with seals, such as rubber gaskets or heat-resistant sealing rings, to prevent steam leakage.

[0048] Step 2) The steam nozzle is designed to be T-shaped. Two symmetrical openings are added at the end of the steam nozzle so that the steam nozzle forms a "T" shape. The length and angle of the two openings are designed according to the specific size and shape of the silo. The T-shaped steam nozzle design increases the coverage area of ​​the steam injection and ensures that the steam can be evenly distributed to all areas of the silo.

[0049] Step 2) A plugging cap is installed at the rear side of the steam nozzle, and a cap handle is provided on the plugging cap to prevent steam from leaking from the rear side of the nozzle, and the cap handle facilitates installation and removal of the plugging cap and is convenient for maintenance.

[0050] The plugging cap is made of the same high temperature and high pressure resistant material as the steam nozzle, such as stainless steel or alloy steel. The plugging cap is designed to be round or hexagonal with threads for easy tightening and sealing. The cap handle is designed in the shape of a handle for easy manual operation. A sealing ring or gasket is added inside the plugging cap to enhance the sealing performance and prevent steam leakage.

[0051] Step 3) A connecting valve is installed on the connecting pipe to facilitate the control of steam flow.

[0052] The connecting valve is made of high temperature and high pressure resistant materials, such as stainless steel or high temperature alloy. The connecting valve is a ball valve or a solenoid valve.

[0053] The ball valve has good sealing performance and durability, and is suitable for manual operation. The ball inside the valve body controls the steam flow by rotating; the solenoid valve is suitable for automatic control systems, and controls the opening and closing of the valve through electrical signals, which is convenient for remote and intelligent control. The solenoid valve needs to be equipped with high temperature resistant solenoid coils and seals.

[0054] Example 2: A silo steam preheating device made by a silo steam preheating method as shown in Example 1. Please participate Figure 1-5 , including a silo 1, a fixing block 2 is provided on the inner wall of the silo 1, a steam nozzle 3 is provided on the fixing block 2, a steam nozzle port 4 is provided at the front end of the steam nozzle 3, a plugging cap 5 is provided at the rear side of the steam nozzle 3, a cap handle 11 is provided at the rear side of the plugging cap 5, a connecting pipe 6 is led out from one side of the steam nozzle 3, the connecting pipe 6 is connected to the steam ring pipe 7, a connecting valve 8 is provided on the connecting pipe 6, the steam ring pipe 7 is connected to the outer wall of the silo 1 through a hanging seat 9, and a steam inlet pipe 10 is provided on the steam ring pipe 7.

[0055] The steam nozzle 3 is fixed to the inner wall of the silo 1, and the steam is uniformly sprayed onto the material in the silo through the steam nozzle 4 to achieve a uniform heating effect.

[0056] The connecting valve 8 is installed on the connecting pipe 6 and is used to adjust the flow rate and pressure of the steam to ensure that the effect of the steam injection meets the processing requirements.

[0057] The steam ring pipe 7 is fixed to the outer wall of the silo 1 through a hanger 9, connected to a plurality of steam nozzles 3, and continuously supplies steam through a steam inlet pipe 10 to ensure uniform steam distribution.

[0058] The plugging cap 5 and the cap handle 11 are designed at the rear side of the steam nozzle 3, so as to facilitate the disassembly of the steam nozzle 3 during maintenance and cleaning.

[0059] The coordinated work of the steam nozzle 3, the connecting pipe 6 and the steam ring pipe 7 realizes uniform heating of the material in the silo 1. It effectively improves the average temperature of the mixed material, reduces the thickness of the sintering over-wet layer, realizes the sintering technology of low-water and low-carbon thick materials, improves the quality of sintered ore, reduces fuel consumption, eliminates the dew point temperature and reduces the influence of the sintering over-wet layer on the sintering process, realizes the operation of the super-thick silo 1, and reduces the unit fuel consumption of sintered ore.

[0060] Embodiment 3, a silo steam preheating method as shown in embodiment 1, a temperature sensor is installed inside the silo, and a temperature sensor and a pressure sensor are installed inside the steam inlet pipe and the steam ring pipe.

[0061] The temperature sensor is installed in the silo, steam inlet pipe and steam ring pipe. The temperature sensor adopts high temperature resistant thermocouple or thermal resistance temperature sensor.

[0062] Install multiple temperature sensors at different heights and positions (such as top, middle and bottom) inside the silo to monitor the temperature distribution of the material in the silo. The sensors should be installed in a protective cover that will not be impacted or disturbed by the material. Install temperature sensors in the steam inlet pipe and steam ring pipe to monitor the steam temperature and ensure that the steam is maintained within the set temperature range during entry and distribution.

[0063] The installation position of the pressure sensor: in the steam inlet pipe and the steam ring pipe. The pressure sensor adopts a high temperature and high pressure resistant pressure sensor. The pressure sensor is installed in the steam inlet pipe and the steam ring pipe to monitor the steam pressure, ensure that the steam system operates within a safe range, and adjust the steam flow according to the pressure change.

[0064] The connecting valve model is a solenoid valve, which is connected to the PLC to control the steam flow. The solenoid valve is suitable for automatic control. The PLC is a programmable logic controller. The solenoid valve is connected to the PLC through a communication interface (such as Modbus or Profibus) to achieve real-time control of the steam flow. The PLC dynamically adjusts the opening of the solenoid valve according to the data of the temperature and pressure sensors.

[0065] A temperature sensor is installed inside the silo, a temperature sensor and a pressure sensor are installed inside the steam inlet pipe and the steam ring pipe, and an electric heater is installed inside the steam ring pipe. When the steam preheating system is started, initial heating is provided to ensure that the steam reaches the set temperature.

[0066] Electric heaters should be suitable for high temperature environments. The power should be designed according to system requirements. Electric heaters should be installed at appropriate locations in the steam ring to ensure that the steam is preheated to the set temperature before entering the steam nozzle. Electric heaters need to be equipped with temperature controllers and protective devices to prevent overheating.

[0067] The temperature sensor and pressure sensor are connected to the PLC, and the temperature sensor and pressure sensor are interlocked with the solenoid valve to adjust the steam flow in real time according to the temperature and pressure to ensure the stable operation of the system.

[0068] Write a control program in the PLC to control the opening and closing status of the solenoid valve in real time based on the data from the temperature sensor and pressure sensor. The control program includes temperature setting value, pressure setting value, alarm threshold and protection measures.

[0069] Interlocking logic: If the temperature sensor detects that the temperature in the silo is lower than the set value, the PLC increases the opening of the solenoid valve and increases the steam flow rate; conversely, if the temperature is higher than the set value, the PLC reduces the opening of the solenoid valve and reduces the steam flow rate. When the pressure sensor detects that the pressure exceeds the set range, the PLC sends an alarm signal and adjusts the solenoid valve as needed.

[0070] Example 4, a silo steam preheating equipment manufactured by a silo steam preheating method as shown in Example 2, is put into use in April 2023. The usage of coke powder from January to June of that year is shown in the following table.

[0071] Table 1 Coke usage from January to June 2023

[0072]

[0073] It can be seen from the data in Table 1 that after being put into use, the fuel consumption dropped from an average fuel consumption of 51.92kg / t in January-March to 50.38kg / t in April-June, with an average monthly reduction of 1.54kg / t.

[0074] In addition, after the present invention is used, the temperature deviation between the north and south of the material in the silo is reduced from 20°C to 5°C, the average temperature of the mixed material is increased from 50°C to 65°C, and the sintering material layer is increased to more than 950mm.

[0075] The standard parts used in the present invention can all be purchased from the market, and special-shaped parts can be customized according to the description in the specification and the drawings. The specific connection methods of each part adopt conventional means such as mature bolts, rivets, welding, etc. in the prior art. Machinery, parts and equipment all adopt conventional models in the prior art, and the circuit connection adopts the conventional connection method in the prior art. It will not be described in detail here. The content not described in detail in this specification belongs to the prior art known to professional and technical personnel in this field.

[0076] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A silo steam preheating method, characterized in that: The following steps are involved: 1) Install the fixing block on the inner wall of the silo; 2) The steam nozzle is fixed on the fixed block, and the front end of the steam nozzle is set as a steam nozzle; 3) The connecting pipe leading out from one side of the steam nozzle is connected to the steam ring pipe; 4) The steam ring pipe is connected to the outer wall of the silo through a hanger; 5) Connect the steam inlet pipe to the steam ring pipe.

2. A silo steam preheating method according to claim 1, characterized in that: Step 1) 8 fixing blocks are installed on the east and west sides of the inner wall of the silo, and 3 fixing blocks are installed on the south and north sides. The fixing blocks are installed in a staggered and dense manner, and steam nozzles are installed corresponding to the number of fixing blocks.

3. A silo steam preheating method according to claim 2, characterized in that: Step 2) The steam nozzle is inserted into the fixing block and passes through the side wall of the silo, and the steam nozzle is fixed at an angle.

4. A silo steam preheating method according to claim 1 or 3, characterized in that: Step 2) The steam nozzle is designed to be T-shaped.

5. A silo steam preheating method according to claim 1 or 3, characterized in that: Step 2) A plugging cap is installed at the rear side of the steam nozzle, and a cap handle is provided on the plugging cap.

6. A silo steam preheating method according to claim 1, characterized in that: Step 3) A connecting valve is installed on the connecting pipe, and the connecting valve is a ball valve or a solenoid valve.

7. A silo steam preheating method according to claim 1, characterized in that: A temperature sensor is installed inside the silo, and a temperature sensor and a pressure sensor are installed inside the steam inlet pipe and the steam ring pipe.

8. A silo steam preheating method according to claim 7, characterized in that: The connecting valve model is a solenoid valve, and the connecting valve is connected to the PLC for communication to control the steam flow.

9. A silo steam preheating method according to claim 8, characterized in that: A temperature sensor is installed inside the silo, a temperature sensor and a pressure sensor are installed inside the steam inlet pipe and the steam ring pipe, and an electric heater is installed inside the steam ring pipe.

10. A silo steam preheating method according to claim 9, characterized in that: The temperature sensor and the pressure sensor are communicatively connected to the PLC, and the temperature sensor and the pressure sensor are interlocked with the solenoid valve.