A method for harmless treatment of construction waste polluted by organic pollutants
A technology for the harmless treatment of organic pollutants, applied in the field of environmental engineering, to achieve the effects of low energy consumption, wide application range, and short treatment cycle
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2018-06-05
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
technical field
[0001] The invention relates to a harmless treatment method for construction waste polluted by organic pollutants, belonging to the field of environmental engineering. Background technique
[0002] With the rapid development of the economy and the strengthening of the environmental protection legal system, high-pollution industrial enterprises have been shut down, rectified, and outdated and excess production capacity has been eliminated. A large amount of industrial construction waste has been generated during the demolition and rectification of abandoned factories and workshops. They are different from ordinary residential commercial construction waste. , which contains a large amount of toxic and harmful substances such as heavy metals, inorganic compounds and organic substances. These polluted construction wastes will be directly landfilled or reused without treatment, which will cause pollution and damage to the environment.
[0003] At present, there i...
Examples
Embodiment 1
[0015] A. Use a jaw crusher or other crushers to crush construction waste polluted by polycyclic aromatic hydrocarbon phenanthrene (boiling point 340°C), and use 4-mesh and 18-mesh vibrating screens to screen the crushed construction waste polluted by organic pollutants. First pass through a 4-mesh sieve, and then pass the undersize through a 18-mesh sieve to obtain two sets of undersize; the oversize of the 4-mesh sieve returns to the crusher to continue crushing and then sieves.
[0016] B. Level off the undersize of 4 mesh sieve and the top of 18 mesh sieve into a pile with a height of 15-20 mm; level the undersize of 18 mesh sieve into a pile of 10 to 15 mm in height;
[0017] C, the two groups of heaps of step B are placed in the microwave equipment successively, treated with microwave irradiation, and irradiated in a microwave field with a microwave power of 0.8kw for 35min;
[0018] D. After the microwave irradiation, the construction waste was sent to the ventilation e...
Embodiment 2
[0020] Using the same method as in Example 1, the construction waste polluted by 1,3,5-trichlorobenzene (boiling point 208.5°C) was crushed and sieved to obtain two groups of undersieves;
[0021] Using the same method as in Example 1, the heights of the two groups of undersize heaps were leveled to 15-20 mm and 10-15 mm; placed in microwave equipment, and irradiated in a microwave field with a power of 0.8 kw for 20 minutes.
[0022] The detection and analysis of construction waste polluted by 1,3,5-trichlorobenzene before and after microwave irradiation treatment shows that the removal rate of 1,3,5-trichlorobenzene is 90%-95%.
Embodiment 3
[0024] The crushing, sieving and stacking are the same as in Example 1, and the organic pollutant is phorate (boiling point 120° C.); it is placed in microwave equipment and irradiated in a microwave field with a power of 0.8 kw for 10 minutes.
[0025] The detection and analysis of construction waste polluted by phorate before and after microwave irradiation showed that the removal rate of phorate was 85%-95%.