Prefabricated shear wall connection structure and installation method thereof

By setting grooves and penetration holes at the connection end of the prefabricated shear wall, using ring steel bars and straight bars to cross-buckle, and combining grouting formwork and concrete filling, the problems of high construction difficulty and poor connection strength of traditional prefabricated concrete structures are solved. , achieving improvement in construction efficiency and enhancement of connection strength.

CN109736481BActive Publication Date: 2024-11-08CHINA CONSTR SEVENTH ENG DIVISION CORP LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN201910120181.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-02-18
Publication Date
2024-11-08
Estimated Expiration
2039-02-18

AI Technical Summary

Technical Problem

When vertically connected, traditional prefabricated concrete structures have problems such as difficult construction, lack of integrity and poor connection strength. Especially when connecting the upper and lower wall ends, the steel bars need to be manually adjusted, resulting in low construction efficiency.

Method used

A prefabricated shear wall connection structure was designed. By setting grooves and penetration holes at the upper and lower connection ends, cross-buckle using annular steel bars and straight bars, combining grouting formwork and concrete pouring, the construction process is simplified and enhanced. Connection strength.

Benefits of technology

It achieves fast construction, improves construction efficiency, enhances the integrity and strength of connections, simplifies construction processes, reduces costs, and has good promotion and application prospects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN109736481B_ABST
    Figure CN109736481B_ABST
Patent Text Reader

Abstract

The present invention discloses a prefabricated shear wall connection structure and an installation method thereof, which solves the technical problems of the existing assembled shear walls being difficult to construct, lacking in integrity and having poor connection strength. The present invention comprises prefabricated shear walls connected up and down, the upper and lower connection ends of the prefabricated shear walls are provided with connecting bars, the upper and lower connection ends are provided with a row of grooves, the grooves of the two prefabricated shear walls connected up and down correspond to each other up and down, the connecting bars are annular steel bars arranged in the grooves, the side walls of each groove are provided with corresponding reinforcing bar holes, straight reinforcing bars are inserted in the reinforcing bar holes, and the straight reinforcing bars of the prefabricated shear walls pass through the annular steel bars of the connected prefabricated shear walls. The present invention simplifies the construction process and improves the construction efficiency; the grooves are provided at the connection ends of the prefabricated shear walls, which is not only convenient for splicing and installation, but also allows prefabrication and assembly and wet operations to be carried out simultaneously, fully ensuring the integrity and structural strength.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled building construction, and in particular to a prefabricated shear wall connection structure and an installation method thereof. Background Art

[0002] Prefabricated shear wall structure is a type of prefabricated concrete structure, which is defined as a prefabricated concrete structure in which the main load-bearing components, shear walls, beams, and slabs, are partially or completely composed of prefabricated concrete components. When traditional prefabricated structures are connected vertically, horizontal steel bars need to be inserted after the upper and lower walls are in place. Every time the horizontal steel bars pass through a certain distance, they will be blocked by the connecting steel bars at the ends of the upper and lower walls, requiring workers to make time-consuming and laborious manual adjustments, which makes installation very difficult and construction efficiency low; moreover, when installing and constructing this connection structure, the upper wall needs to be hoisted to avoid bending and deforming the connecting steel bars at the ends of the upper and lower walls; in addition, since the upper and lower walls are supported by the connecting steel bars at the ends, rather than being flatly butt-jointed, the coordination of the upper and lower walls when connected requires cumbersome adjustments to ensure assembly standards such as verticality and horizontality. Summary of the invention

[0003] In view of the deficiencies in the above-mentioned background technology, the present invention proposes a prefabricated shear wall connection structure and an installation method thereof, which solves the technical problems of the existing assembled shear walls, such as the great difficulty in construction, the lack of integrity and the poor connection strength.

[0004] The technical solution of the present invention is implemented as follows: a prefabricated shear wall connection structure, including prefabricated shear walls connected up and down, the upper and lower connection ends of the prefabricated shear walls are provided with connecting bars, the upper and lower connection ends are provided with a row of grooves, the grooves of the two prefabricated shear walls connected up and down correspond to each other, the connecting bars are annular steel bars arranged in the grooves, the side walls of each groove are provided with corresponding reinforcing bar holes, straight reinforcing bars are inserted in the reinforcing bar holes, and the straight reinforcing bars of the prefabricated shear walls pass through the annular steel bars of the connected prefabricated shear walls. A row of grooves are arranged at the upper and lower connection ends of the prefabricated shear walls, and reinforcing bar holes are arranged on the side walls of the grooves, and the straight reinforcing bars are inserted through the reinforcing bar holes, so that the construction is quick and convenient; the annular steel bars are arranged in the grooves, which can not only ensure that the annular steel bars of the prefabricated shear walls connected up and down are cross-locked with each other, but also ensure that the two upper and lower shear walls are horizontally and reliably connected, effectively enhancing the integrity and strength of the connection.

[0005] Furthermore, the reinforcement holes and grooves are arranged horizontally, which is convenient for prefabrication and can further ensure the convenience of reinforcement insertion and docking.

[0006] Furthermore, two reinforcing bar holes are provided on the side wall of each groove, and the reinforcing bar holes penetrate the side wall of the prefabricated shear wall. The two reinforcing bar holes can ensure the connection strength and avoid the high cost and complicated construction caused by the provision of too many straight bars.

[0007] Furthermore, the annular reinforcement is a closed annular reinforcement, and the two ends of the closed annular reinforcement respectively pass through the top and bottom ends of the prefabricated shear wall to form an upper annular reinforcement and a lower annular reinforcement. Setting the annular reinforcement as a closed annular reinforcement can further improve the overall connection strength, so that the same prefabricated shear wall is integrally connected to the upper and lower prefabricated shear walls.

[0008] Furthermore, the reinforcement holes correspond to the inner angles of the annular reinforcements. Such arrangement of the reinforcement holes can ensure that the straight reinforcements are close to the annular reinforcements, thereby further improving the connection strength.

[0009] A method for installing a prefabricated shear wall connection structure comprises the following steps:

[0010] Step 1: Hoist the upper prefabricated shear wall onto the lower prefabricated shear wall, so that the groove of the upper prefabricated shear wall corresponds to the groove of the lower prefabricated shear wall, and ensure that the annular steel bars of the upper prefabricated shear wall are cross-locked with the annular steel bars of the lower prefabricated shear wall.

[0011] Step 2: Starting from the sides of the upper precast shear wall and the lower precast shear wall, insert straight reinforcement into the reinforcement holes so that the straight reinforcement passes through the cross-locked annular reinforcement described in step 1.

[0012] Step 3: Install a grouting template at the upper and lower connecting ends of the upper prefabricated shear wall and the lower prefabricated shear wall, and the grouting template is provided with grouting ports corresponding to each groove.

[0013] Step 4: Pour concrete inward through the grouting port described in step 3, and remove the grouting formwork after the concrete solidifies to complete the connection of the prefabricated shear wall layer.

[0014] Step 5: Repeat the above steps 1 to 5 and install the prefabricated shear walls layer by layer.

[0015] When the upper and lower layers of prefabricated shear walls are butt-jointed in step 1, two points should be ensured to ensure that the spacing between the annular reinforcements of the upper and lower layers of prefabricated shear walls is not greater than 50 mm, and to ensure that the annular reinforcements of the two layers of prefabricated shear walls do not touch the bottom of the groove or come into contact with the bottom of the groove.

[0016] The present invention simplifies the construction process and improves the construction efficiency; the present invention provides grooves at the connection ends of the prefabricated shear walls, which is not only convenient for splicing and installation, but also allows prefabrication and assembly and wet operations to be carried out simultaneously, fully ensuring the integrity and structural strength. A row of grooves is provided at the upper and lower connection ends of the prefabricated shear wall, and reinforcement holes are provided on the side walls of the grooves, through which straight reinforcements are inserted, and the construction is quick and convenient; the annular steel bars are provided in the grooves, which can ensure that the annular steel bars of the upper and lower prefabricated shear walls are cross-fastened with each other, and can ensure that the two upper and lower shear walls are reliably connected horizontally, effectively enhancing the integrity and strength of the connection. The present invention has a simple structure, is easy to manufacture, has few and simple construction processes, and has high construction efficiency, and has a good prospect for promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural schematic diagram of a prefabricated shear wall;

[0018] Figure 2 This is a connection diagram of prefabricated shear walls;

[0019] Figure 3 for Figure 2 The enlarged schematic diagram of point A in the middle;

[0020] Figure 4 for Figure 2 Cross-sectional view of the middle BB surface;

[0021] Figure 5 It is a cross-sectional structural diagram of the joint point of the prefabricated shear wall;

[0022] Figure 6 This is a schematic diagram before the upper precast shear wall is connected to the lower precast shear wall;

[0023] Figure 7 for Figure 6 Side view of. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] Embodiment 1, a prefabricated shear wall connection structure, such as Figure 2 , Figure 3 , Figure 4As shown, it includes a prefabricated shear wall 1 connected up and down, and a row of grooves 2 are arranged at the upper and lower connecting ends of the prefabricated shear wall 1. The grooves of the two prefabricated shear walls 1 connected up and down correspond to each other, and annular steel bars 3 are arranged in the grooves 2. The annular steel bars 3 of the two prefabricated shear walls 1 cross-lock with each other. Corresponding reinforcing bar holes 4 are opened on the side walls of each groove 2, and straight reinforcing bars 5 are inserted in the reinforcing bar holes 4. The straight reinforcing bars 5 are inserted into each reinforcing bar hole 4 and also pass through each groove 2. At the same time, the straight reinforcing bars 5 also pass through the annular steel bars 3 of the two connected prefabricated shear walls 1.

[0026] like Figure 1 and 5 As shown, a row of grooves 2 are arranged at the upper and lower connecting ends of the prefabricated shear wall 1, and reinforcement holes 4 are arranged on the side walls of the grooves 2, and straight reinforcements 5 are inserted through the reinforcement holes 4, so that the construction is quick and convenient; the annular reinforcements 3 are arranged in the grooves 2, which can ensure that the annular reinforcements 3 of the upper and lower prefabricated shear walls 1 connected are cross-locked with each other, and can also ensure that the two upper and lower shear walls 1 are horizontally and reliably connected, which effectively enhances the connection integrity and connection strength.

[0027] Embodiment 2, a prefabricated shear wall connection structure, such as Figure 3 As shown, the reinforcement holes 4 and the grooves 2 are both arranged horizontally, which is convenient for prefabrication and can further ensure the convenience of reinforcement insertion and connection between the upper and lower walls.

[0028] The other structures of this embodiment are the same as those of Embodiment 1.

[0029] Embodiment 3, a prefabricated shear wall connection structure, such as Figure 3 , Figure 4 As shown, two reinforcement holes 4 are provided on the side wall of each groove 2. The two reinforcement holes 4 can ensure the connection strength and avoid the high cost and complicated construction caused by providing too many straight reinforcements.

[0030] The other structures of this embodiment are the same as those of Embodiment 2.

[0031] Embodiment 4, a prefabricated shear wall connection structure, such as Figure 4 As shown, the annular reinforcement 3 is a closed annular reinforcement, and the two ends of the closed annular reinforcement respectively pass through the top and bottom ends of the prefabricated shear wall 1 to form an upper annular reinforcement 3-1 and a lower annular reinforcement 3-2. The annular reinforcement 3 is set as a closed annular reinforcement, which can further improve the overall connection strength, so that the same prefabricated shear wall is integrally connected with the upper and lower prefabricated shear walls.

[0032] The other structures of this embodiment are the same as those of Embodiment 2 or 3.

[0033] Embodiment 5, a prefabricated shear wall connection structure, such as Figure 4As shown, the reinforcement holes 4 correspond to the inner angles of the annular reinforcements. Such arrangement of the reinforcement holes can ensure that the straight reinforcements 5 are close to the annular reinforcements 3, which can further improve the connection strength.

[0034] The other structures of this embodiment are the same as those of Embodiment 4.

[0035] Embodiment 6, a method for installing a prefabricated shear wall connection structure, comprising the following steps:

[0036] Step 1: If Figure 6 and Figure 7 As shown, the upper prefabricated shear wall 1-1 is hoisted onto the lower prefabricated shear wall 1-2 so that the groove 2 of the upper prefabricated shear wall 1-1 corresponds to the groove 2 of the lower prefabricated shear wall 1-2.

[0037] Step 2: Place the upper prefabricated shear wall 1-1 in step 1 on the lower prefabricated shear wall 1-2, ensuring that the annular reinforcement 3 of the upper prefabricated shear wall 1-1 is cross-locked with the annular reinforcement 3 of the lower prefabricated shear wall 1-2.

[0038] Step 3: Starting from the sides of the upper prefabricated shear wall 1-1 and the lower prefabricated shear wall 1-2, straight bars 5 are inserted into the reinforcement holes 4 so that the straight bars 5 pass through the cross-locked annular steel bars described in step 1.

[0039] Step 4: Install a grouting template at the upper and lower connecting ends of the upper prefabricated shear wall 1 - 1 and the lower prefabricated shear wall 1 - 2 , and open a grouting port corresponding to each groove 2 on the grouting template.

[0040] Step 5: Pour concrete inward through the grouting port described in step 3, and remove the grouting formwork after the concrete solidifies to complete the connection of the prefabricated shear wall layer.

[0041] Step 6: Repeat steps 1 to 5 above and install the prefabricated shear walls layer by layer.

[0042] The structure of the prefabricated shear wall in this embodiment is the same as that in Embodiment 5.

[0043] Embodiment 7, a method for installing a prefabricated shear wall connection structure, in the step 1 of embodiment 6, two points should be ensured when connecting the upper and lower prefabricated shear walls, such as Figure 2 As shown, the spacing between the annular reinforcements 3 of the upper and lower prefabricated shear walls is ensured to be no greater than 50 mm, and the annular reinforcements 3 of the two prefabricated shear walls are ensured not to touch the bottom of the groove 2. The spacing between the annular reinforcements 3 is within a certain range, which can ensure the connection reliability and prevent the annular reinforcements 3 from touching the bottom of the groove 2 or contacting the bottom of the groove, and can keep the annular reinforcements 3 from deforming.

[0044] The other installation steps of this embodiment are the same as those of Embodiment 6.

[0045] Any details not provided in the present invention are common knowledge in the art.

[0046] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for installing a prefabricated shear wall connection structure, the prefabricated shear wall connection structure comprising upper and lower connected prefabricated shear walls (1), the upper and lower connecting ends of the prefabricated shear wall (1) being provided with connecting ribs, characterized in that: The upper and lower connecting ends are provided with a row of grooves (2), the grooves (2) of the two prefabricated shear walls (1) connected up and down correspond to each other up and down, the connecting reinforcement is an annular reinforcement (3) arranged in the groove (2), the side wall of each groove (2) is provided with a corresponding reinforcement hole (4), a straight reinforcement (5) is inserted in the reinforcement hole (4), and the straight reinforcement (5) of the prefabricated shear wall (1) passes through the annular reinforcement (3) of the connected prefabricated shear wall (1); the straight reinforcement (5) is inserted into each reinforcement hole (4) and also passes through each groove (2), and at the same time, the straight reinforcement (5) also passes through the annular reinforcement (3) of the two connected prefabricated shear walls (1); The annular reinforcement (3) is a closed annular reinforcement, and the two ends of the closed annular reinforcement respectively pass through the top and bottom ends of the prefabricated shear wall (1) to form an upper annular reinforcement (3-1) and a lower annular reinforcement (3-2); The reinforcement hole (4) corresponds to the inner angle of the annular reinforcement (3); The rib-piercing holes (4) and the grooves (2) are both arranged horizontally; Two reinforcement holes (4) are provided on the side wall of each groove (2), and the reinforcement holes (4) penetrate the side wall of the prefabricated shear wall (1); The installation method comprises the following steps: Step 1: hoisting the upper prefabricated shear wall (1-1) onto the lower prefabricated shear wall (1-2), so that the groove (2) of the upper prefabricated shear wall (1-1) corresponds to the groove (2) of the lower prefabricated shear wall (1-2) in the vertical direction, and ensuring that the annular steel bars (3) of the upper prefabricated shear wall (1-1) and the annular steel bars (3) of the lower prefabricated shear wall (1-2) are cross-locked; Step 2: Starting from the side surfaces of the upper prefabricated shear wall (1-1) and the lower prefabricated shear wall (1-2), straight reinforcements (5) are inserted into the reinforcement holes (4) so ​​that the straight reinforcements (5) pass through the cross-locked annular reinforcements (3) described in step 1; Step 3: installing a grouting template at the upper and lower connection ends of the upper prefabricated shear wall (1-1) and the lower prefabricated shear wall (1-2), wherein the grouting template is provided with grouting openings corresponding to the grooves (2); Step 4: pour concrete inward through the grouting opening described in step 3, and remove the grouting template after the concrete solidifies to complete the connection of the prefabricated shear wall of this layer; Step 5: Repeat the above steps 1 to 4 to install the prefabricated shear walls layer by layer; When the upper and lower layers of prefabricated shear walls are butt-jointed in step 1, two points should be ensured to ensure that the spacing between the annular reinforcements (3) of the upper and lower layers of prefabricated shear walls is not greater than 50 mm, and to ensure that the annular reinforcements (3) of the two layers of prefabricated shear walls do not touch the bottom of the groove (2) or come into contact with the bottom of the groove.

Citation Information

Patent Citations

  • Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure

    CN102433945A

  • Embedded column type prefabricated part connecting method

    CN103741809A

  • Interlayer connection method of prefabricated concrete structure

    CN106088355A

  • Assembled annular rebar buckling anchoring-connection concrete shear wall unilateral floor slab connecting structure

    CN106759951A

  • Assembly type reinforced concrete shear wall and construction method thereof

    CN108360712A