Urban rail transit combined beam and construction method thereof
The steel-concrete composite structure of the urban rail transit bridge solves the problems of poor lateral stress and heavy weight of existing elevated rail transit bridges, achieving lightweight and rapid construction and adapting to complex structural requirements.
Patent Information
- Application Number
- CN201910590977.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-07-02
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2039-07-02
AI Technical Summary
Existing elevated rail transit bridge structures suffer from problems such as poor lateral stress, heavy weight, low space utilization, limited span, and difficulty in adapting to locations with widening or crossovers. Furthermore, traditional structures exhibit shortcomings when prefabricated construction requirements are raised.
The urban rail transit composite beam adopts a steel-concrete composite structure, which includes concrete longitudinal beams, steel transverse beams and concrete panels. They are connected by shear connectors to form an integral load-bearing system. Each component is prefabricated in the factory and then assembled and hoisted.
It improves the lateral load-bearing capacity of the beam, reduces the overall weight, enhances construction efficiency, adapts to the needs of complex locations such as widening and crossover, and enables rapid construction and maintenance.
Smart Images

Figure CN110331646B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban rail transit, and in particular to an urban rail transit combined beam and a construction method thereof. Background Art
[0002] At present, the superstructure of rail transit viaducts generally adopts large box beams, small box beams or U-shaped beams. Common box beams have a large overall height, a heavy beam body, low space utilization, and a large overall hoisting weight. U-shaped beams have solved the above problems to a certain extent, but U-shaped beams are open thin-walled sections, with poor lateral force and easy cracking of the bottom plate. Therefore, they cannot adapt to widening and crossover positions, and have limited spans. In addition, as the market's requirements for prefabrication increase, the shortcomings of traditional structures are becoming increasingly prominent. Summary of the invention
[0003] In view of the above-mentioned defects existing in the prior art, the present invention provides an urban rail transit combined beam to improve the lateral force of the beam body, reduce the weight of the beam body components and improve the installation efficiency.
[0004] To achieve the object, the present invention provides an urban rail transit combined beam, comprising:
[0005] at least two concrete longitudinal beams;
[0006] At least one group of steel beams, each group of steel beams includes a plurality of steel beams, all of the steel beams in the same group are arranged between the two concrete longitudinal beams, and all of the steel beams are located on the same plane;
[0007] At least one concrete panel is disposed between the two concrete longitudinal beams, and the concrete panel is disposed on the steel cross beam.
[0008] Based on the above technical solution, the urban rail transit combined beam includes:
[0009] Three longitudinal beams arranged in parallel, of which the longitudinal beams on both sides are concrete side longitudinal beams, and the longitudinal beam in the middle is a concrete middle longitudinal beam;
[0010] Two groups of steel beams, one group of steel beams is a plurality of first beams, and the other group of steel beams is a plurality of second beams, the first beams and the second beams are respectively located between the concrete middle longitudinal beam and two concrete side longitudinal beams, and both sides of the first beam and the second beam are respectively connected to the concrete middle longitudinal beam and a concrete side longitudinal beam;
[0011] Two concrete bridge decks are respectively arranged on the first cross beam and the second cross beam.
[0012] On the basis of the above technical solution, a first shear-resistant connector is provided on the top of each of the first crossbeam and the second crossbeam, and the first crossbeam and the second crossbeam are connected to the concrete bridge deck through the first shear-resistant connector.
[0013] On the basis of the above technical solution, the first shear-resistant connector is welded to the top of the first beam and the second beam.
[0014] On the basis of the above technical solution, the first shear-resistant connector is a shear nail, and the first shear-resistant connector is arranged in a rectangular grid shape or a star shape or a plum blossom shape.
[0015] On the basis of the above technical solution, second shear connectors are provided on both sides of the first crossbeam and the second crossbeam, and the first crossbeam and the second crossbeam are connected to the concrete side longitudinal beam and the concrete middle longitudinal beam through the second shear connector.
[0016] On the basis of the above technical solution, the second shear connector is a shear nail, and the second shear connector is arranged in a rectangular grid shape or a star shape or a plum blossom shape.
[0017] On the basis of the above technical solution, the concrete side longitudinal beams and the concrete middle longitudinal beams are both prestressed structural beams.
[0018] The present invention also provides a construction method for an urban rail transit combined beam, comprising the following steps:
[0019] prefabricate two concrete side longitudinal beams, one concrete middle longitudinal beam, a plurality of first transverse beams, a plurality of second transverse beams and two concrete bridge decks;
[0020] Welding first shear connectors on the tops of all first beams and second beams, and welding second shear connectors on both sides of all first beams and second beams;
[0021] Hoist two concrete side longitudinal beams and a concrete middle longitudinal beam to the target position, with the two concrete side longitudinal beams arranged opposite to each other and the concrete middle longitudinal beam arranged between the two concrete side longitudinal beams;
[0022] hoisting all the first cross beams and the second cross beams between the concrete middle longitudinal beam and the two concrete side longitudinal beams respectively, so that the first cross beams and the second cross beams are combined with the concrete middle longitudinal beam and the two concrete side longitudinal beams through the second shear connector to form a frame body;
[0023] hoisting two concrete bridge decks onto the first cross beam and the second cross beam respectively;
[0024] The joints of the first shear connector and the second shear connector are cast to connect the concrete side longitudinal beam, the concrete middle longitudinal beam, the concrete bridge deck, the first cross beam and the second cross beam into one.
[0025] On the basis of the above technical solution, the specific process of hoisting all the first cross beams and the second cross beams respectively between the concrete middle longitudinal beam and the two concrete side longitudinal beams comprises the following steps:
[0026] Divide all the first beams and the second beams into two parts for splicing;
[0027] Welding a portion of the first cross beam and the second cross beam on the concrete side longitudinal beam to form a first frame, and hoisting the first frame to a target position;
[0028] Welding another part of the first cross beam and the second cross beam on both sides of the longitudinal beam in concrete to form a second frame, and then hoisting the second frame to a target position;
[0029] Both sides of all the first cross beams and the second cross beams are connected to the concrete middle longitudinal beams and the concrete side longitudinal beams.
[0030] Compared with the prior art, the beneficial effects of the present invention are: the urban rail transit combined beam of the present invention has a simple process, and all components of the beam body can be manufactured in the factory and then transported to the construction site for assembly and hoisting, which is convenient for construction and maintenance and conducive to rapid construction; the beam body is a steel-concrete composite structure, with the bridge deck, concrete side longitudinal beams, concrete middle longitudinal beams, and steel cross beams as the main load-bearing components, the overall weight is reduced, the bearing capacity is improved, and it is beneficial to improve the construction efficiency of the beam body. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is a schematic diagram of the cross-sectional structure of the urban rail transit combined beam in the first embodiment of the present invention.
[0032] Figure 2 This is a schematic diagram of the cross-sectional structure of the concrete side and longitudinal beams of the steel cross beam of the urban rail transit combined beam in the first embodiment of the present invention;
[0033] Figure 3 This is a schematic diagram of the segmented cross-section structure of the steel cross beam of the urban rail transit combined beam in the first embodiment of the present invention;
[0034] Figure 4 This is a schematic diagram of the overall structure of the urban rail transit combined beam in Example 1 of the present invention;
[0035] Figure 5 It is a schematic diagram of the overall structure of the urban rail transit combined beam in Example 3 of the present invention.
[0036] In the figure: 1-concrete side longitudinal beam, 2-concrete middle longitudinal beam, 3-steel cross beam, 31-first cross beam, 32-second cross beam, 4-concrete bridge deck, 51-first shear connector, 52-second shear connector, 6-pillar, 7-wrist arm. DETAILED DESCRIPTION
[0037] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0038] The present invention provides an urban rail transit combined beam, comprising:
[0039] at least two concrete longitudinal beams;
[0040] At least one group of steel beams, each group of steel beams includes a plurality of steel beams, all of the steel beams in the same group are arranged between the two concrete longitudinal beams, and all of the steel beams are located on the same plane;
[0041] At least one concrete panel 4 is provided between the two concrete longitudinal beams, and the concrete panel 4 is provided on the steel cross beam 3 .
[0042] The urban rail transit combined beam based on this concept can be applied to both double-track urban rail transit combined beams and double-track urban rail transit combined beams.
[0043] Embodiment 1
[0044] See also Figures 1 to 4 As shown, an embodiment of the present invention provides an urban rail transit combined beam, which is applied to a double-line urban rail transit combined beam. The urban rail transit combined beam includes:
[0045] Three longitudinal beams arranged in parallel, wherein the longitudinal beams located on both sides are concrete side longitudinal beams 1, and the longitudinal beam located in the middle is a concrete middle longitudinal beam 2;
[0046] Two groups of steel beams, one group of which is a plurality of first beams 31, and the other group of which is a plurality of second beams 32, wherein the first beams 31 and the second beams 32 are respectively located between the concrete middle longitudinal beam 2 and the two concrete side longitudinal beams 1, and both sides of the first beam 31 and the second beam 32 are respectively connected to the concrete middle longitudinal beam 2 and a concrete side longitudinal beam 1;
[0047] Two concrete bridge decks 4 are respectively arranged on the first cross beam 31 and the second cross beam 32 .
[0048] The urban rail transit combined beam in the embodiment of the present invention has a simple process. All components of the beam body can be manufactured in the factory and then transported to the construction site for assembly and hoisting. The construction and maintenance are convenient, which is conducive to rapid construction. The beam body is a steel-concrete composite structure. The bridge deck, concrete side longitudinal beams, concrete middle longitudinal beams, and steel cross beams are the main load-bearing components. The overall weight is reduced and the bearing capacity is improved, which is conducive to improving the construction efficiency of the beam body.
[0049] Furthermore, the urban rail transit combined beam also includes a first shear connector 51, which is arranged on the top of the first beam 31 and the second beam 32, and the first beam 31 and the second beam 32 are connected to the concrete bridge deck 4 through the first shear connector 51.
[0050] Preferably, the first anti-shear connector 51 is welded to the top of the first cross beam 31 and the second cross beam 32 .
[0051] Specifically, the first shear connectors 51 are shear nails, and the first shear connectors 51 are arranged in a rectangular grid shape or a star shape or a plum blossom shape so that the force is evenly applied to the surface.
[0052] In the embodiment of the present invention, the first shear connector 51 is a plurality of shear nails, and the plurality of shear nails are distributed at equal intervals on the top of the first crossbeam 31 and the second crossbeam 32 in the transverse and longitudinal directions.
[0053] Furthermore, the urban rail transit combined beam also includes a second shear connector 52, which is arranged on both sides of the first cross beam 31 and the second cross beam 32, and the first cross beam 31 and the second cross beam 32 are connected to the concrete side longitudinal beam 1 and the concrete middle longitudinal beam 2 through the second shear connector 52.
[0054] Preferably, the second anti-shear connector 52 is welded on both sides of the first cross beam 31 and the second cross beam 32 .
[0055] Specifically, the second shear connectors 52 are shear nails, and the second shear connectors 52 are arranged in a rectangular grid shape or a star shape or a plum blossom shape so that the force is evenly applied to the surface.
[0056] In the embodiment of the present invention, the second shear connector 52 is a plurality of shear nails, and the plurality of shear nails are distributed on both sides of the first crossbeam 31 and the second crossbeam 32 at equal intervals in the transverse and longitudinal directions.
[0057] The concrete side longitudinal beams 1 and the concrete middle longitudinal beams 2 are both prestressed structural beams, which can improve the crack resistance of concrete components, reduce the cross-sectional size, and reduce the deadweight of the concrete structure.
[0058] See also Figure 2 As shown, the opposite sides of the two concrete side longitudinal beams 1 are concave, which is convenient for pouring wet joints so that the concrete side longitudinal beams 1 are firmly and stably connected to the second shear connectors 52 on both sides of the steel beam 3. They can also bear part of the weight of the steel beam 3 during hoisting, thereby improving the construction and installation efficiency.
[0059] The urban rail transit combined beam in the embodiment of the present invention is an H-shaped double-track steel-concrete combined beam, the main parts of which are composed of precast concrete, steel structure and post-cast concrete. The three are combined into a whole and work together through shear connectors welded on the steel beams and concrete wet joints. Prestressed tendons are arranged on the concrete side longitudinal beams 1 and the concrete middle longitudinal beams 2 as needed; the steel cross beams 3 are arranged at intervals of 2500 to 2800 mm. The first shear connector 51 and the second shear connector 52 can be bolted and welded to the steel cross beam 3. The bolts have a diameter of 16 to 22 mm, a height of 80 to 220 mm, and a spacing of 100 to 150 mm. They can be arranged in a rectangular grid or star or plum blossom shape. A certain number of stress-bearing steel bars and structural steel bars are provided in the concrete bridge deck 4.
[0060] The steel cross beam 3 is I-shaped, and the steel cross beam 3 and the concrete side longitudinal beam 1, the concrete middle longitudinal beam 2 and the concrete bridge deck 4 are combined into a whole, giving full play to the compressive strength of the concrete. Under the condition of meeting the bearing performance, the weight of the elevated bridge body is reduced, the difficulty of manufacturing and construction is reduced, and the assembly efficiency is improved; the first shear connector 51 and the second shear connector 52 transfer the shear force between the steel cross beam 3 and the concrete structure and prevent the two from separating; a support 6 is fixed on the top of the concrete middle longitudinal beam 2, and a wrist arm 7 is fixed on the upper part of the support 6 to erect power facilities and improve the space utilization rate of the beam body.
[0061] Embodiment 2
[0062] An embodiment of the present invention provides a construction method for an urban rail transit combined beam, comprising the following steps:
[0063] Prefabricate two concrete side longitudinal beams 1, one concrete middle longitudinal beam 2, a plurality of first transverse beams 31, a plurality of second transverse beams 32 and two concrete bridge decks 4;
[0064] First shear-resistant connectors 51 are welded on the tops of all first beams 31 and second beams 32 , and second shear-resistant connectors 52 are welded on both sides of all first beams 31 and second beams 32 ;
[0065] Hoist two concrete side longitudinal beams 1 and a concrete middle longitudinal beam 2 to the target position, with the two concrete side longitudinal beams 1 arranged opposite to each other and the concrete middle longitudinal beam 2 arranged between the two concrete side longitudinal beams 1;
[0066] All the first cross beams 31 and the second cross beams 32 are hoisted between the concrete middle longitudinal beam 2 and the two concrete side longitudinal beams 1, respectively, so that the first cross beams 31 and the second cross beams 32 are combined with the concrete middle longitudinal beam 2 and the two concrete side longitudinal beams 1 through the second shear connector 52 to form a frame body;
[0067] The two concrete bridge decks 4 are hoisted onto the first cross beam 31 and the second cross beam 32 respectively;
[0068] The joints of the first shear connector 51 and the second shear connector 52 are cast to connect the concrete side longitudinal beam 1, the concrete middle longitudinal beam 2, the concrete bridge deck 4, the first cross beam 31 and the second cross beam 32 as a whole. Preferably, the specific process of hoisting all the first cross beams 31 and the second cross beams 32 between the concrete middle longitudinal beam 2 and the two concrete side longitudinal beams 1 includes the following steps:
[0069] Divide all the first cross beams 31 and the second cross beams 32 into two parts for splicing;
[0070] A portion of the first cross beam 31 and the second cross beam 32 are welded to the concrete side longitudinal beam 1 to form a first frame, and the first frame is hoisted to a target position;
[0071] Another part of the first cross beam 31 and the second cross beam 32 are welded on both sides of the longitudinal beam 2 in the concrete to form a second frame, and then the second frame is hoisted to the target position;
[0072] Both sides of all the first cross beams 31 and the second cross beams 32 are connected to the concrete middle longitudinal beams 2 and the concrete side longitudinal beams 1 .
[0073] By welding a part of the first beam 31 and the second beam 32 to the concrete side longitudinal beam 1, a hoisting is performed first, and then the other part of the first beam 31 and the second beam 32 is welded to the concrete middle longitudinal beam 2 for the next hoisting. After the hoisting is completed, all the first beams 31 and the second beams 32 are connected, so as to ensure the hoisting balance and make the installation more convenient and quick.
[0074] Embodiment 3
[0075] See also Figure 5 As shown, an embodiment of the present invention provides an urban rail transit combined beam, which is applied to a single-line urban rail transit combined beam. The urban rail transit combined beam includes:
[0076] Two concrete longitudinal beams, the two concrete longitudinal beams are two oppositely arranged concrete side longitudinal beams 1, and the two concrete side longitudinal beams 1 are prestressed structural beams;
[0077] A group of steel beams 3, the group of steel beams 3 includes a plurality of steel beams 3, all of the steel beams 3 are arranged between the two concrete side longitudinal beams 1, and all of the steel beams 3 are located on the same plane;
[0078] A concrete panel 4 is provided between the two concrete side longitudinal beams 1 , and the concrete panel 4 is provided on the steel cross beam 3 .
[0079] A first shear-resistant connector 51 is welded on the top of all the steel beams 3 , and all the steel beams 3 are connected to the concrete panel 4 via the first shear-resistant connector 51 .
[0080] Second shear-resistant connectors 52 are welded on both sides of all steel beams 3 , and all steel beams 3 are connected to the concrete side longitudinal beams 1 via the second shear-resistant connectors 52 .
[0081] The first shear connector 51 and the second shear connector 52 are both shear nails, and are arranged in a rectangular grid shape or a star shape or a plum blossom shape.
[0082] The present invention is not limited to the above-mentioned embodiments. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications are also considered to be within the protection scope of the present invention.
Claims
1. A construction method for an urban rail transit combined beam, characterized in that: The urban rail transit combined beam comprises: at least two concrete longitudinal beams; At least one group of steel beams (3), each group of steel beams (3) comprises a plurality of steel beams (3), all of the steel beams (3) in the same group are arranged between the two concrete longitudinal beams, and all of the steel beams (3) are located on the same plane; At least one concrete bridge deck (4), wherein the concrete bridge deck (4) is disposed between the two concrete longitudinal beams, and the concrete bridge deck (4) is disposed on the steel cross beam (3); When there are three concrete longitudinal beams, the three longitudinal beams are arranged in parallel, wherein the longitudinal beams located at both sides are concrete side longitudinal beams (1), and the longitudinal beam located in the middle is a concrete middle longitudinal beam (2); Two groups of steel cross beams, one group of steel cross beams is a plurality of first cross beams (31), and the other group of steel cross beams is a plurality of second cross beams (32), the first cross beams (31) and the second cross beams (32) are respectively located between the concrete middle longitudinal beam (2) and two concrete side longitudinal beams (1), and both sides of the first cross beam (31) and the second cross beam (32) are respectively connected to the concrete middle longitudinal beam (2) and a concrete side longitudinal beam (1); Two concrete bridge decks (4), the two concrete bridge decks (4) being respectively arranged on the first cross beam (31) and the second cross beam (32); The opposite sides of the two concrete side longitudinal beams (1) are concave; The steel crossbeam (3) is I-shaped; The urban rail transit combined beam is an H-shaped double-track steel-concrete combined beam; The concrete side longitudinal beams (1) and the concrete middle longitudinal beams (2) are both prestressed structural beams; The construction method comprises the following steps: Prefabricate two concrete side longitudinal beams (1), a concrete middle longitudinal beam (2), a plurality of first transverse beams (31), a plurality of second transverse beams (32) and two concrete bridge decks (4); Welding first anti-shear connectors (51) on the tops of all first cross beams (31) and second cross beams (32), and welding second anti-shear connectors (52) on both sides of all first cross beams (31) and second cross beams (32); The two concrete side longitudinal beams (1) and the concrete middle longitudinal beam (2) are hoisted to the target position, and the two concrete side longitudinal beams (1) are arranged opposite to each other, and the concrete middle longitudinal beam (2) is arranged between the two concrete side longitudinal beams (1); All first cross beams (31) and second cross beams (32) are hoisted between the concrete middle longitudinal beam (2) and the two concrete side longitudinal beams (1) respectively, so that the first cross beams (31) and the second cross beams (32) are combined with the concrete middle longitudinal beam (2) and the two concrete side longitudinal beams (1) through the second shear-resistant connector (52) to form a frame body; The two concrete bridge panels (4) are hoisted onto the first cross beam (31) and the second cross beam (32) respectively; Casting the joints of the first shear-resistant connector (51) and the second shear-resistant connector (52) to connect the concrete side longitudinal beam (1), the concrete middle longitudinal beam (2), the concrete bridge deck (4), the first cross beam (31) and the second cross beam (32) into one body; The specific process of hoisting all the first cross beams (31) and the second cross beams (32) respectively between the concrete middle longitudinal beam (2) and the two concrete side longitudinal beams (1) comprises the following steps: Divide all the first cross beams (31) and the second cross beams (32) into two parts for splicing; Welding a portion of the first cross beam (31) and the second cross beam (32) onto the concrete side longitudinal beam (1) to form a first frame, and hoisting the first frame to a target position; Another portion of the first cross beam (31) and the second cross beam (32) are welded to both sides of the longitudinal beam (2) in concrete to form a second frame, and the second frame is then hoisted to a target position; Both sides of all first cross beams (31) and second cross beams (32) are connected to the concrete middle longitudinal beam (2) and the concrete side longitudinal beam (1).
2. The construction method of the urban rail transit combined beam according to claim 1, characterized in that: A first shear-resistant connector (51) is provided at the top of each of the first crossbeam (31) and the second crossbeam (32); the first crossbeam (31) and the second crossbeam (32) are connected to the concrete bridge deck (4) via the first shear-resistant connector (51).
3. The construction method of the urban rail transit combined beam according to claim 2, characterized in that: The first anti-shear connector (51) is welded to the top of the first crossbeam (31) and the second crossbeam (32).
4. The construction method of the urban rail transit combined beam according to claim 2, characterized in that: The first anti-shear connectors (51) are shear nails, and the first anti-shear connectors (51) are arranged in a rectangular grid shape or a star shape or a plum blossom shape.
5. The construction method of the urban rail transit combined beam according to claim 1, characterized in that: Second shear-resistant connectors (52) are provided on both sides of the first crossbeam (31) and the second crossbeam (32), and the first crossbeam (31) and the second crossbeam (32) are connected to the concrete side longitudinal beam (1) and the concrete middle longitudinal beam (2) via the second shear-resistant connectors (52).
6. The construction method of the urban rail transit combined beam according to claim 5, characterized in that: The second shear-resistant connectors (52) are shear nails, and the second shear-resistant connectors (52) are arranged in a rectangular grid shape or a star shape or a plum blossom shape.