Method for using a rotary casting type concrete placing machine without a gantry lining trolley

By installing a rotary concrete placing machine on top of the gantryless lining trolley, and using a PLC control device and servo motor to achieve rotary docking and diversion of the pipeline, the problems of small top space of the gantryless lining trolley and complex connection of telescopic pipelines are solved, thereby improving construction efficiency, extending equipment life, and reducing costs.

CN111350526BActive Publication Date: 2024-11-26LUOYANG GAOFEI BRIDGE MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010347445.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-28
Publication Date
2024-11-26
Estimated Expiration
2040-04-28

AI Technical Summary

Technical Problem

The existing gantryless lining trolley has a small top space, the traveling trolley affects the passage of construction personnel and materials, the expansion pipe connection is complicated and easy to block, resulting in unstable traveling speed, inaccurate connection of the pouring port, and even damage to components and downtime for maintenance.

Method used

A rotary concrete placing boom is adopted and set on the top platform. The rotating pipe is driven by a PLC control device and a servo motor to achieve 360° rotation and docking with the diversion pipe. This simplifies the connection of the telescopic pipe, ensures good concrete fluidity, and reduces the space occupied by the placing boom. The PLC control device and remote control are used for precise docking, simplifying the operation process.

Benefits of technology

It improved construction progress and quality, reduced component damage and repair rates, extended equipment lifespan, reduced production and transportation costs, and increased economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111350526B_ABST
    Figure CN111350526B_ABST
Patent Text Reader

Abstract

A method for using a rotary casting concrete placing machine with a lining trolley without a gantry. Before construction, the rotary casting concrete placing machine with a lining trolley without a gantry starts a PLC control device, and then an operator sets a wireless or wireless control mode through the touch screen of the PLC control device, and then sets a construction casting sequence through a rotary docking mode. After the connection of a feeding pipeline is completed, the operator controls a servo motor through a control console or a remote controller to drive the rotary pipeline to rotate, and the rotary pipeline is rotated and docked with a diversion pipeline port in turn for concrete pouring construction. The present invention uses a small space, ensuring the smooth flow of construction personnel and materials. The rotary pipeline can be controlled by the PLC control device to rotate 360 ​​degrees, and can be quickly docked with a fixed diversion pipeline port and construction progress, thereby ensuring docking accuracy and reducing component damage and maintenance rate. The production, transportation and labor costs are reduced, the installation speed and quality of the concrete placing machine are improved, and the economic benefits of the enterprise are increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a method for using a gantry-free lining trolley material placing machine, in particular to a method for using a gantry-free lining trolley rotary casting type material placing machine. Background Art

[0002] At present, most of the existing concrete pouring technologies of the gantry-free lining trolley adopt that the walking trolley type concrete placing machine walks and constructs on the track through the walking trolley, and a large walking space for the trolley is reserved on the track. Since the space on the top of the gantry-free lining trolley is small, the walking trolley needs a large moving space to drive the telescopic pipe when pouring concrete. The moving space of the trolley affects the installation of the supporting components of the template and the passage of construction personnel and materials; the telescopic pipe of the walking trolley is connected to a long pipe and has many components, and the construction span is large, the weight is large, and the connection is more complicated. The long pipe causes the concrete to have low fluidity and easy blockage. The phenomenon of damage to the connecting parts of the feeding telescopic pipe occurs from time to time. When the connecting parts of the telescopic pipe are damaged, the moving trolley is subjected to the resistance of the telescopic pipe during the walking process, and the walking speed of the moving trolley on the track is unstable, vibration occurs, or the pouring port cannot be accurately connected to the diversion port, and even the parts of the moving trolley are damaged, resulting in the phenomenon of shutdown and maintenance from time to time, which affects the progress of construction and increases the cost of construction. In view of the above reasons, a method for using a rotary pouring type concrete placing machine of a gantry-free lining trolley is proposed. Summary of the invention

[0003] The purpose of the present invention is to overcome the problem that the space on the top of the lining trolley without a gantry is small, and the movement of the trolley affects the passage of construction personnel and materials; the telescopic pipe connected by the walking trolley to cast concrete is long, has many parts, is more complicated to connect, and is easily blocked. The phenomenon of damage to the connecting parts of the feeding telescopic pipe often occurs. When the connecting parts of the telescopic pipe are damaged, they are subject to the resistance of the telescopic pipe, and the walking speed of the mobile trolley on the track is unstable, vibration occurs, or the pouring port cannot be accurately connected to the diversion port, and even the parts of the mobile trolley are damaged, resulting in frequent shutdowns for maintenance. Now, through reasonable design, a method for using a rotary casting type material distributor for a lining trolley without a gantry is provided. The rotary distributor of the present invention is arranged in the middle of the top platform, and the space used is small, which ensures the smooth passage of construction personnel and materials. The supporting parts of the template are easy to install and can ensure the safety of production. The rotating pipe of the rotary distributor can rotate 360° to connect the diversion pipe fixed for construction. The diversion pipe is in a fixed position, which reduces the space occupied by the concrete distributor, and does not require telescopic pipe connection components and complicated installation and operation. During construction, the distance that concrete passes through the diversion pipe is short and the fluidity is good, which ensures the quality of concrete pouring. The PLC control device of the present invention is equipped with a router, an operating table, and a remote controller. The PLC control device can perform wired or wireless operation to rotate the pipe to rotate and dock the diversion pipe port. The diversion pipe port is arranged in a plane position around the chassis of the concrete distributor, which can ensure the docking accuracy. The servo motor is controlled by the PLC control device to drive the rotating pipe to rotate accurately, and the outlet of the rotating pipe can accurately dock the diversion pipe port in the set order. The use is simple and convenient, which can speed up the docking of the diversion pipe port and the progress of construction, reduce component damage and maintenance rate, and extend the service life of the rotary concrete distributor; reduce the cost of production, transportation and labor, improve the installation speed and quality of the concrete distributor, and increase the economic benefits of the enterprise.

[0004] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a method for using a doorless lining trolley rotary casting type material distributor, wherein the doorless lining trolley rotary casting type material distributor is composed of a combined frame, an internal support top template, an internal support side template, a top platform crossbeam, a top platform, a rotary material distributor, an upper diversion pipeline, a middle diversion pipeline, a lower diversion pipeline, a feeding pipeline, a side diversion pipeline, a servo motor, a rotary pipeline, a diversion pipeline port, a telescopic docking port, a gearbox, a power output gear, a transmission gear, a rotary flange, a rotary frame, a material distributor chassis, and a combined frame. The combined frame is composed of a longitudinal beam, a combined support column, a top platform seat, a frame crossbeam, a chassis seat, a rotating flange seat, a rotating sleeve, a rotating sealing pipe joint, a base sleeve, a PLC control device, an operating table, a hydraulic cylinder, a top shunt pipe, a router, and a remote control; the four corners of the combined frame are provided with four combined support columns, the lower ends of the four combined support columns are provided with walking devices, the upper parts of the four combined support columns are provided with a rectangular frame, a pair of frame crossbeams are provided between the combined support columns at both ends of the rectangular frame, and a pair of combined support columns are provided between the combined support columns on both sides of the rectangular frame. The frame longitudinal beams, the upper ends of the four combined support columns are symmetrically provided with two pairs of top platform seats on both sides, a pair of top platform cross beams are arranged above the two pairs of top platform seats at both ends, a pair of longitudinal beams are arranged on both sides of a pair of top platform cross beams, a top platform is arranged on a pair of longitudinal beams, a platform pipe hole is reserved in the center of the top platform, a rotary concrete placing machine is arranged above the center of the top platform, a concrete placing machine chassis is arranged below the rotary concrete placing machine, and a chassis seat is arranged below the concrete placing machine chassis; a base hole is reserved in the center of the concrete placing machine chassis, a base sleeve is arranged in the base hole, a fixed flange is welded at the lower end of the base sleeve, and the fixed flange The bottom corresponds to the top platform and partially reserved for through-going screw holes, and fastening bolts are respectively arranged in the through-going screw holes; a rotating sleeve is arranged in the base sleeve, a rotating flange is arranged at the upper end of the rotating sleeve, a rotating flange seat is arranged between the lower edge of the rotating flange and the upper surface of the concrete placing machine chassis, the upper surface of the concrete placing machine chassis and the lower end of the rotating flange seat are welded and set as one body, a pipe rotating hole is reserved in the center of the rotating flange, a feeding pipe is arranged in the pipe rotating hole and the rotating sleeve, and the lower part of the feeding pipe and the fixed flange are welded and set as one body; the centers of the feeding pipe, the concrete placing machine chassis, the fixed flange and the rotating flange seat are correspondingly set as one body;

[0005] An inner support top template is arranged above the combined frame, a top pouring port is arranged at the center above the inner support top template, the lower ends of both sides of the inner support top template are symmetrically arranged as inner support side templates, and the two ends of the inner support side template and the inner support are arranged as arched inner support templates; working windows are reserved at the upper, middle and lower parts of the inner support side template, a diversion pipe opening is arranged around the edge above the chassis of the placing machine, two top diversion pipe openings are arranged at the corresponding two ends of the top platform, top diversion pipes are arranged in the two top diversion pipe openings, and the discharge ports of the top diversion pipes are arranged A top butt-jointed flexible pipe is provided, at least three pairs of diversion pipe openings on both sides are symmetrically arranged corresponding to both sides of the top platform, at least three pairs of diversion pipe openings on both sides are arranged with radial side diversion pipes, the lower ends of the discharge openings of at least three pairs of side diversion pipes on both sides are staggeredly arranged as upper diversion pipes, middle diversion pipes, and lower diversion pipes, respectively, the discharge openings of the upper diversion pipes, middle diversion pipes, and lower diversion pipes on both sides correspond to the upper, middle, and lower working windows of the inner support side template, respectively, and a flexible pipe is arranged between the outlet of the top diversion pipe and the top casting port;

[0006] A transmission gear is arranged on the outer side of the middle of the rotating sleeve, a rectangular opening is reserved on one side of the rotating flange seat corresponding to the transmission gear, a gearbox is arranged in the rectangular opening, a servo motor is arranged on one side of the gearbox, a pair of speed gears is arranged between the servo motor and the gearbox, the speed gear in the gearbox is coaxially arranged as a power output gear, and a pair of rotating gears is arranged corresponding to the power output gear and the transmission gear; the upper end of the feeding pipe is arranged as a rotating pipe, the lower end of the rotating pipe is arranged as an elbow, and a rotating sealing pipe connection is arranged between the lower end of the elbow and the upper end of the feeding pipe;

[0007] The upper end of the rotating sleeve and the rotating flange are welded together, a rotating frame is arranged on the rotating flange corresponding to the rotating pipe, a support arm is arranged at the lower end of the rotating frame, the support arm and the rotating flange are fixedly arranged, the support column of the rotating frame is arranged as a U-shaped body, a hydraulic cylinder is arranged in the U-shaped mouth, and a buckle is arranged between the upper end of the support column of the rotating frame and the rotating pipe; the outlet end of the rotating pipe is arranged as a telescopic docking port, a pair of hydraulic cylinders are symmetrically arranged on both sides between the telescopic docking port and the upper and lower sides of the elbow, and hinge ears are respectively arranged at both ends of the pair of hydraulic cylinders; the servo motor, gearbox, transmission gear, rotating sleeve, rotating flange, rotating frame, and rotating pipe are arranged as a rotating pipe mechanism; the rotation angle of the outlet end of the rotating pipe is respectively arranged corresponding to the diversion pipe opening at the edge of the chassis of the placing machine;

[0008] A PLC control device is arranged on one side of the top platform seat above the top platform, a wired or wireless control mode is arranged in the PLC control device, and an electrical connection is arranged between the PLC control device and the servo motor; the PLC control device sets the rotation angle according to the position of the diversion pipe port, and the PLC control device sets the construction sequence according to the corresponding positions of the lower diversion pipe, the middle diversion pipe, the upper diversion pipe, and the top diversion pipe; a hydraulic pump station is arranged on one side of the PLC control device, and hydraulic pipelines of the hydraulic pump station and the hydraulic cylinder are arranged; a router and a remote controller are arranged on one side above the PLC control device, and a wireless signal is arranged between the router and the remote controller; an operating table is arranged on one side of the lower part of the combined support column, and a control signal line is arranged between the operating table and the PLC control device;

[0009] Before construction, the rotary casting concrete placing machine without gantry lining trolley starts the PLC control device first, and the operator sets the wireless or wireless control mode according to the situation of the construction site through the touch screen of the PLC control device, and then sets the rotary docking mode. The construction casting sequence is set to correspond to the lower diversion pipe, the middle diversion pipe, the upper diversion pipe, and the top diversion pipe in sequence, which is set to the construction casting sequence from bottom to top. The concrete pressurized pipe of the concrete mixing tank truck is manually connected to the feeding pipe.

[0010] After the feeding pipe is connected, the operator controls the servo motor through the control console or remote control to drive the rotating pipe to rotate, and the servo motor controls the rotating pipe to rotate in sequence to connect with the diversion pipe ports of the lower diversion pipe, the middle diversion pipe, the upper diversion pipe, and the top diversion pipe; the wired control mode controls the servo motor to control the rotation of the rotating pipe through the control console, and the wireless control mode controls the servo motor to control the rotation of the rotating pipe through the remote control; when the rotating pipe rotates to the diversion pipe port corresponding to the lower diversion pipe, the PLC control device automatically controls the rotating pipe to stop rotating, and at the same time, the PLC control device controls the hydraulic pump station to drive the hydraulic cylinder to drive the telescopic docking port to extend, and after the telescopic docking port is extended to connect with the diversion pipe port of the lower diversion pipe, the PLC control device controls the hydraulic pump station to stop and close. After the hydraulic pump station stops and closes, the operator instructs the concrete mixing tank truck to carry out the concrete in the concrete pressure pipe to enter the lower diversion pipe through the feeding pipe, and the concrete is poured through the outlet of the lower diversion pipe to the outside of the working window at the lower part of the inner support side template.

[0011] After the lower concrete pouring construction of the inner support side formwork is completed, the hydraulic pump station drives the hydraulic cylinder to drive the telescopic docking interface to contract, and the telescopic docking interface separates the diversion pipe mouth of the lower diversion pipe by contraction; after the telescopic docking interface is separated from the diversion pipe mouth of the lower diversion pipe, the PLC control device controls the rotating pipe and the hydraulic pump station to repeat the method and method for the diversion pipe mouths of the middle diversion pipe, the upper diversion pipe, and the top diversion pipe in turn to perform concrete pouring construction on the outer side of the inner support side formwork and the inner support top formwork. After the concrete pouring construction on the outer side of the inner support top formwork is completed, the lining trolley without a gantry is demoulded and then moved to the next section to repeat the method and method for concrete pouring construction.

[0012] Beneficial effects: The rotary concrete distributor of the present invention is arranged in the middle of the top platform, and the space used is small, which ensures the smooth flow of construction personnel and materials, and the supporting parts of the template are easy to install to ensure the safety of production; the rotary pipe of the rotary concrete distributor can rotate 360 ​​degrees, and the fixed pipe for docking construction is the diversion pipe, which is in a fixed position, reducing the space occupied by the distributor, and does not require telescopic pipe connection parts and complicated installation and operation; during construction, the distance passed by the concrete in the diversion pipe is short and the fluidity is good, which ensures the quality of concrete pouring. The PLC control device of the present invention is equipped with a router, an operating table, a remote control, p The LC control device can operate the rotating pipe by wire or wireless to rotate and dock the diversion pipe mouth. The diversion pipe mouth is set in a plane position around the concrete placing machine chassis to ensure the docking accuracy. The servo motor is controlled by the PLC control device to drive the rotating pipe to rotate accurately. The outlet of the rotating pipe can accurately dock the diversion pipe mouth according to the set sequence. It is simple and convenient to use, can speed up the docking of the diversion pipe mouth and the progress of construction, reduce component damage and maintenance rate, and extend the service life of the rotary concrete placing machine; reduce the cost of production, transportation and labor, improve the installation speed and quality of the concrete placing machine, and increase the economic benefits of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The present invention will be further described below in conjunction with the accompanying drawings:

[0014] Figure 1 It is a schematic diagram of the general assembly structure;

[0015] Figure 2 yes Figure 1 A schematic diagram of a local structure viewed from above;

[0016] Figure 3 yes Figure 2 Schematic diagram of the local structure;

[0017] Figure 4 yes Figure 3 A side view schematic diagram of the structure;

[0018] Figure 5 yes Figure 3 Schematic diagram of the three-dimensional structure;

[0019] Figure 6 yes Figure 1 Schematic diagram of the combined frame structure;

[0020] Figure 7 yes Figure 1 Schematic diagram of the rotary material placing machine and the diversion pipeline structure;

[0021] Figure 8 yes Figure 7 A schematic diagram of a top view structure;

[0022] Fig. 9 yes Figure 1 Schematic diagram of the control system structure of the plc control device;

[0023] Figure 1 , 2 , 3, 4, 5, 6, 7, 8, 9: combined frame 1, internal support top template 2, internal support side template 3, top platform crossbeam 4, top platform 5, rotary material placing machine 6, upper diversion pipe 7, middle diversion pipe 8, lower diversion pipe 9, feeding pipe 10, side diversion pipe 11, servo motor 12, rotating pipe 13, diversion pipe mouth 14, telescopic docking port 15, gearbox 16, power output gear 17, transmission gear 18, rotating flange 19, rotating frame 20, material placing machine chassis 21, combined frame longitudinal beam 22, combined support column 23, top platform seat 24, frame crossbeam 25, chassis seat 26, rotating flange seat 27, rotating sleeve 28, rotating sealing pipe connection 29, base sleeve 30, PLC control device 31, operating table 32, hydraulic cylinder 33, top diversion pipe 34, router 35, remote control 36. DETAILED DESCRIPTION

[0024] The present invention is further described in detail below in conjunction with embodiments and specific implementation modes:

[0025] Example 1

[0026] The four corners of the combined frame 1 are arranged with four combined support columns 23, and the lower ends of the four combined support columns 23 are provided with walking devices. The upper parts of the four combined support columns 23 are arranged as a rectangular frame, and a pair of frame cross beams 25 are arranged between the combined support columns 23 at both ends of the rectangular frame, and a pair of combined frame longitudinal beams 22 are arranged between the combined support columns 23 on both sides of the rectangular frame. Two pairs of top platform seats 24 are symmetrically arranged on both sides of the upper ends of the four combined support columns 23, and a pair of top platform cross beams 4 are arranged above the two pairs of top platform seats 24 at both ends. A pair of longitudinal beams are arranged on both sides of the pair of top platform cross beams 4, and a top platform 5 is arranged on the pair of longitudinal beams. A platform pipe hole is reserved in the center of the top platform 5, and a rotary material distributor 6 is arranged on the center of the top platform 5, and a material distributor chassis 21 is arranged below the rotary material distributor 6. A chassis seat 26 is arranged on the surface; a base hole is reserved in the center of the fabricating machine chassis 21, a base sleeve 30 is arranged in the base hole, a fixing flange is welded at the lower end of the base sleeve 30, and screw holes corresponding to the top platform 5 are partially reserved below the fixing flange, and fastening bolts are arranged in the screw holes respectively; a rotating sleeve 28 is arranged in the base sleeve 30, a rotating flange 19 is arranged at the upper end of the rotating sleeve 28, a rotating flange seat 27 is arranged between the lower edge of the rotating flange 19 and the upper surface of the fabricating machine chassis 21, the upper surface of the fabricating machine chassis 21 and the lower end of the rotating flange seat 27 are welded and arranged as one body, a pipeline rotating hole is reserved in the center of the rotating flange 19, a feeding pipeline 10 is arranged in the pipeline rotating hole and the rotating sleeve 28, and the lower part of the feeding pipeline 10 and the fixing flange are welded and arranged as one body; the centers of the feeding pipeline 10, the fabricating machine chassis 21, the fixing flange and the rotating flange seat 27 are correspondingly arranged as one body;

[0027] An inner support top template 2 is arranged above the combined frame 1, a top pouring port is arranged at the center above the inner support top template 2, inner support side templates 3 are symmetrically arranged at the lower ends of both sides of the inner support top template 2, and the two ends of the inner support side template 3 and the inner support are arranged as arched inner support templates; working windows are reserved at the upper, middle and lower parts of the inner support side template 3, a diversion pipe opening 14 is arranged around the edge above the placing machine chassis 21, and two top diversion pipe openings 14 are arranged at the corresponding two ends of the top platform 5, and top diversion pipes 34 are respectively arranged in the two top diversion pipe openings 14, and the discharge of the top diversion pipes 34 The outlet is provided with a top butt-jointed soft pipe, and at least three pairs of diversion pipe outlets 14 are symmetrically arranged on both sides of the top platform 5, and at least three pairs of diversion pipe outlets 14 are arranged with radial side diversion pipes 11, and the lower ends of the discharge ports of at least three pairs of side diversion pipes 11 are staggeredly arranged as upper diversion pipes 7, middle diversion pipes 8, and lower diversion pipes 9, respectively. The discharge ports of the upper diversion pipes 7, middle diversion pipes 8, and lower diversion pipes 9 on both sides correspond to the upper, middle, and lower working windows of the inner support side template 3, respectively, and a soft pipe is arranged between the outlet of the top diversion pipe 34 and the top casting port;

[0028] A transmission gear 18 is arranged on the outer side of the middle of the rotating sleeve 28, a rectangular opening is reserved on one side of the rotating flange seat 27 corresponding to the transmission gear 18, a gearbox 16 is arranged in the rectangular opening, a servo motor 12 is arranged on one side of the gearbox 16, a pair of speed gears is arranged between the servo motor 12 and the gearbox 16, the speed gear in the gearbox 16 is coaxially arranged as a power output gear 17, and a pair of rotating gears is arranged corresponding to the power output gear 17 and the transmission gear 18; the upper end of the feeding pipe 10 is arranged as a rotating pipe 13, the lower end of the rotating pipe 13 is arranged as an elbow, and a rotating sealing pipe connection 29 is arranged between the lower end of the elbow and the upper end of the feeding pipe 10;

[0029] The upper end of the rotating sleeve 28 and the rotating flange 19 are welded to form an integral body. A rotating frame 20 is arranged on the rotating flange 19 corresponding to the rotating pipe 13. A support arm is arranged at the lower end of the rotating frame 20. The support arm and the rotating flange 19 are fixedly arranged. The support column of the rotating frame 20 is arranged as a U-shaped body. A hydraulic cylinder 33 is arranged in the U-shaped mouth. A buckle is arranged between the upper end of the support column of the rotating frame 20 and the rotating pipe 13; the outlet end of the rotating pipe 13 is arranged as a telescopic docking port 15. A pair of hydraulic cylinders 33 are symmetrically arranged on both sides between the telescopic docking port 15 and the upper and lower sides of the elbow. The two ends of the pair of hydraulic cylinders 33 are respectively provided with hinge ears; the servo motor 12, the gearbox 16, the transmission gear 18, the rotating sleeve 28, the rotating flange 19, the rotating frame 20, and the rotating pipe 13 are arranged as a rotating pipe mechanism; the rotation angle of the outlet end of the rotating pipe 13 is respectively arranged corresponding to the diversion pipe port 14 at the edge of the material placing machine chassis 21;

[0030] A plc control device 31 is arranged on one side of the top platform seat 24 above the top platform 5, a wired or wireless control mode is arranged in the plc control device 31, and an electrical connection is arranged between the plc control device 31 and the servo motor 12; the plc control device 31 sets the rotation angle according to the position of the diversion pipe port 14, and the plc control device 31 sets the construction sequence according to the corresponding positions of the lower diversion pipe 9, the middle diversion pipe 8, the upper diversion pipe 7, and the top diversion pipe 34; a hydraulic pump station is arranged on one side of the plc control device 31, and the hydraulic pump station and the hydraulic cylinder 33 are connected by hydraulic pipelines; a router 35 and a remote controller 36 are arranged on one side above the plc control device 31, and a wireless signal is arranged between the router 35 and the remote controller 36; an operating table 32 is arranged on one side of the lower part of the combined support column 23, and a control signal line is arranged between the operating table 32 and the plc control device 31;

[0031] Before construction, the rotary casting type concrete placing machine without gantry lining trolley starts the PLC control device 31 first, and the operator sets the wireless or wireless control mode according to the situation of the construction site through the touch screen of the PLC control device 31, and then sets the rotary docking mode. The construction casting sequence is set to correspond to the lower diversion pipe 9, the middle diversion pipe 8, the upper diversion pipe 7, and the top diversion pipe 34 in sequence, which is set to a construction casting sequence from bottom to top. The concrete pressurized pipe of the concrete mixing tank truck is manually connected to the feeding pipe 10.

[0032] Example 2

[0033] After the feeding pipe 10 is connected, the operator controls the servo motor 12 through the control console 32 or the remote controller 36 to drive the rotating pipe 13 to rotate, and the servo motor 12 controls the rotating pipe 13 to rotate in sequence to connect the lower diversion pipe 9, the middle diversion pipe 8, the upper diversion pipe 7, and the diversion pipe opening 14 of the top diversion pipe 34; the wired control mode controls the servo motor 12 to control the rotation of the rotating pipe 13 through the control console 32, and the wireless control mode controls the servo motor 12 to control the rotation of the rotating pipe 13 through the remote controller 36; when the rotating pipe 13 rotates to the diversion pipe opening 14 corresponding to the lower diversion pipe 9 , the PLC control device 31 automatically controls the rotating pipe 13 to stop rotating. At the same time, the PLC control device 31 controls the hydraulic pump station to drive the hydraulic cylinder 33 to drive the telescopic docking port 15 to extend. After the telescopic docking port 15 is extended to connect the diversion pipe port 14 of the lower diversion pipe 9, the PLC control device 31 controls the hydraulic pump station to stop and close. After the hydraulic pump station stops and closes, the operator instructs the concrete mixing tank truck to carry out concrete pressure The concrete in the pipe enters the lower diversion pipe 9 through the feeding pipe 10, and the concrete is poured through the outlet of the lower diversion pipe 9 to the outside of the working window at the bottom of the inner supporting side formwork 3.

[0034] Example 3

[0035] After the lower concrete pouring construction of the inner support side formwork 3 is completed, the hydraulic pump station drives the hydraulic cylinder 33 to drive the telescopic docking port 15 to contract, and the telescopic docking port 15 separates the diversion pipe port 14 of the lower diversion pipe 9 by contraction; after the telescopic docking port 15 is separated from the diversion pipe port 14 of the lower diversion pipe 9, the PLC control device 31 controls the rotating pipe 13 and the hydraulic pump station to repeat the method and method for the diversion pipe port 14 of the middle diversion pipe 8, the upper diversion pipe 7, and the top diversion pipe 34 in turn to perform concrete pouring construction on the outer side of the inner support side formwork 3 and the inner support top formwork 2. After the concrete pouring construction on the outer side of the inner support top formwork 2 is completed, the lining trolley without a gantry is demoulded and then moved to the next section to repeat the method and method for concrete pouring construction.

Claims

1. A method for using a gantry-free lining trolley rotary casting type material distributor, wherein the gantry-free lining trolley rotary casting type material distributor comprises a combined frame (1), an inner support top template (2), an inner support side template (3), a top platform crossbeam (4), a top platform (5), a rotary material distributor (6), an upper diversion pipeline (7), a middle diversion pipeline (8), a lower diversion pipeline (9), a feed pipeline (10), a side diversion pipeline (11), a servo motor (12), a rotary pipeline (13), a diversion pipeline port (14), a telescopic docking port (15), a gearbox (16), a drive The invention is composed of a force output gear (17), a transmission gear (18), a rotating flange (19), a rotating frame (20), a concrete placing machine chassis (21), a combined frame longitudinal beam (22), a combined support column (23), a top platform seat (24), a frame cross beam (25), a chassis seat (26), a rotating flange seat (27), a rotating sleeve (28), a rotating sealing pipe joint (29), a base sleeve (30), a PLC control device (31), an operating table (32), a hydraulic cylinder (33), a top shunt pipe (34), a router (35), and a remote controller (36); the invention is characterized in that: The four corners of the combined frame (1) are provided with four combined support columns (23), the lower ends of the four combined support columns (23) are provided with walking devices, the upper parts of the four combined support columns (23) are provided with a rectangular frame, a pair of frame cross beams (25) are provided between the combined support columns (23) at both ends of the rectangular frame, a pair of combined frame longitudinal beams (22) are provided between the combined support columns (23) at both sides of the rectangular frame, two pairs of top platform seats (24) are symmetrically provided on both sides of the upper ends of the four combined support columns (23), a pair of top platform cross beams (4) are provided above the two pairs of top platform seats (24) at both ends, a pair of longitudinal beams are provided on both sides of the pair of top platform cross beams (4), a top platform (5) is provided above the pair of longitudinal beams, a platform pipeline hole is reserved at the center of the top platform (5), a rotary material distributor (6) is provided above the center of the top platform (5), a material distributor chassis (21) is provided below the rotary material distributor (6), and a material distributor chassis (21) is provided below the rotary material distributor (6). A chassis seat (26) is provided; a base hole is reserved in the center of the material distribution machine chassis (21); a base sleeve (30) is provided in the base hole; a fixing flange is welded at the lower end of the base sleeve (30); screw holes are partially reserved for penetration at the bottom of the fixing flange corresponding to the top platform (5); fastening bolts are respectively provided in the penetration screw holes; a rotating sleeve (28) is provided in the base sleeve (30); a rotating flange (19) is provided at the upper end of the rotating sleeve (28); the lower edge of the rotating flange (19) is in contact with the material distribution machine chassis (21); ) is provided between the upper surface of the material placing machine chassis (21), the upper surface of the material placing machine chassis (21) and the lower end of the material placing machine chassis (27) are welded and formed into one body, a pipeline rotation hole is reserved at the center of the rotating flange (19), a feeding pipeline (10) is provided in the pipeline rotation hole and the rotating sleeve (28), and the lower part of the feeding pipeline (10) and the fixed flange are welded and formed into one body; the centers of the feeding pipeline (10), the material placing machine chassis (21), the fixed flange and the rotating flange seat (27) are correspondingly formed into one body; An inner support top template (2) is arranged above the combined frame (1), a top pouring port is arranged at the center above the inner support top template (2), inner support side templates (3) are symmetrically arranged at the lower ends of both sides of the inner support top template (2), and the inner support is arranged at both ends of the inner support side template (3) as an arched inner support template; working windows are reserved at the upper, middle and lower parts of the inner support side template (3), a diversion pipe opening (14) is arranged around the edge above the concrete placing machine chassis (21), two top diversion pipe openings (14) are arranged at the corresponding two ends of the top platform (5), top diversion pipes (34) are arranged in the two top diversion pipe openings (14), and the outlets of the top diversion pipes (34) are arranged at the outlets of the top diversion pipes (34). The material port is provided with a top butt-jointed soft pipe, and at least three pairs of diversion pipe ports (14) are symmetrically arranged on both sides of the corresponding top platform (5), and radial side diversion pipes (11) are arranged in the at least three pairs of diversion pipe ports (14) on both sides. The lower ends of the discharge ports of the at least three pairs of side diversion pipes (11) on both sides are staggeredly arranged as an upper diversion pipe (7), a middle diversion pipe (8), and a lower diversion pipe (9), and the discharge ports of the upper diversion pipe (7), the middle diversion pipe (8), and the lower diversion pipe (9) on both sides are arranged corresponding to the upper, middle, and lower working windows of the inner supporting side template (3), respectively, and a soft pipe is arranged between the outlet of the top diversion pipe (34) and the top casting port; A transmission gear (18) is arranged on the outer side of the middle of the rotating sleeve (28); a rectangular opening is reserved on one side of the rotating flange seat (27) corresponding to the transmission gear (18); a gearbox (16) is arranged in the rectangular opening; a servo motor (12) is arranged on one side of the gearbox (16); a pair of speed change gears is arranged between the servo motor (12) and the gearbox (16); the speed change gear in the gearbox (16) is coaxially arranged as a power output gear (17); a pair of rotating gears is arranged corresponding to the power output gear (17) and the transmission gear (18); the upper end of the feeding pipe (10) is arranged as a rotating pipe (13); the lower end of the rotating pipe (13) is arranged as an elbow; a rotating sealing pipe connection (29) is arranged between the lower end of the elbow and the upper end of the feeding pipe (10); The upper end of the rotating sleeve (28) and the rotating flange (19) are welded to form an integral body; a rotating frame (20) is arranged on the rotating flange (19) corresponding to the rotating pipe (13); a supporting arm is arranged at the lower end of the rotating frame (20); the supporting arm and the rotating flange (19) are fixedly arranged; the supporting column of the rotating frame (20) is arranged as a U-shaped body; a hydraulic cylinder (33) is arranged in the U-shaped mouth; a buckle is arranged between the upper end of the supporting column of the rotating frame (20) and the rotating pipe (13); and the outlet end of the rotating pipe (13) is arranged as a telescopic docking port. (15), a pair of hydraulic cylinders (33) are symmetrically arranged on both sides between the telescopic docking port (15) and the upper and lower sides of the elbow, and hinge ears are respectively arranged at both ends of the pair of hydraulic cylinders (33); the servo motor (12), the gearbox (16), the transmission gear (18), the rotating sleeve (28), the rotating flange (19), the rotating frame (20), and the rotating pipeline (13) are arranged as a rotating pipeline mechanism; the rotating angle of the outlet end of the rotating pipeline (13) is respectively arranged to correspond to the diversion pipeline opening (14) at the edge of the concrete placing machine chassis (21); A PLC control device (31) is arranged on one side of the top platform seat (24) above the top platform (5), a wired or wireless control mode is arranged in the PLC control device (31), and the PLC control device (31) and the servo motor (12) are electrically connected; the PLC control device (31) sets the rotation angle according to the position of the diversion pipe opening (14), and the PLC control device (31) sets the construction sequence according to the corresponding positions of the lower diversion pipe (9), the middle diversion pipe (8), the upper diversion pipe (7), and the top diversion pipe (34); a hydraulic pump station is arranged on one side of the PLC control device (31), and hydraulic pipelines are connected between the hydraulic pump station and the hydraulic cylinder (33); a router (35) and a remote controller (36) are arranged on one side above the PLC control device (31), and a wireless signal is arranged between the router (35) and the remote controller (36); an operating table (32) is arranged on one side of the lower part of the combined support column (23), and a control signal line is arranged between the operating table (32) and the PLC control device (31); Before construction, the rotary pouring type concrete placing machine without a gantry lining trolley starts the PLC control device (31), and the operator sets the wireless or wireless control mode according to the conditions of the construction site through the touch screen of the PLC control device (31), and then sets the rotary docking mode. The construction pouring sequence is set through the rotary docking mode. The construction pouring sequence is set to correspond to the lower diversion pipeline (9), the middle diversion pipeline (8), the upper diversion pipeline (7), and the top diversion pipeline (34) in sequence, and is set to be a construction pouring sequence from bottom to top. The concrete pressurizing pipeline of the concrete mixing tank truck is manually connected to the feeding pipeline (10).

2. The method for using a gantry-less lining trolley rotary casting type concrete placing machine according to claim 1, characterized in that: After the feeding pipe (10) is connected, the operator controls the servo motor (12) through the control console (32) or the remote controller (36) to drive the rotating pipe (13) to rotate, and the servo motor (12) controls the rotating pipe (13) to rotate in sequence to connect with the diversion pipe openings (14) of the lower diversion pipe (9), the middle diversion pipe (8), the upper diversion pipe (7), and the top diversion pipe (34); in the wired control mode, the control console (32) controls the servo motor (12) to control the rotating pipe (13) to rotate, and in the wireless control mode, the remote controller (36) controls the servo motor (12) to control the rotating pipe (13) to rotate; the rotating pipe (13) rotates to the diversion pipe opening (14) corresponding to the lower diversion pipe (9). When the pipe opening (14) is opened, the PLC control device (31) automatically controls the rotating pipe (13) to stop rotating. At the same time, the PLC control device (31) controls the hydraulic pump station to drive the hydraulic cylinder (33) to drive the telescopic docking port (15) to extend. After the telescopic docking port (15) is extended to dock with the diversion pipe opening (14) of the lower diversion pipe (9), the PLC control device (31) controls the hydraulic pump station to stop closing. After the hydraulic pump station stops closing, the operator instructs the concrete mixing tank truck to carry out concrete pressure pipe concrete entering the lower diversion pipe (9) through the feeding pipe (10), and the concrete is poured to the outer side of the working window at the lower part of the inner support side template (3) through the outlet of the lower diversion pipe (9).

3. The method for using the doorless lining trolley rotary casting type concrete placing machine according to claim 1, characterized in that: After the lower concrete pouring construction of the inner support side template (3) is completed, the hydraulic pump station drives the hydraulic cylinder (33) to drive the telescopic docking interface (15) to contract, and the telescopic docking interface (15) separates the diversion pipe opening (14) of the lower diversion pipe (9) by contraction; after the telescopic docking interface (15) is separated from the diversion pipe opening (14) of the lower diversion pipe (9), the PLC control device (31) controls the rotating pipe (13) and the hydraulic pump station to sequentially perform concrete pouring construction on the outer side of the inner support side template (3) and the inner support top template (2) with the diversion pipe opening (14) of the middle diversion pipe (8), the upper diversion pipe (7), and the top diversion pipe (34). After the concrete pouring construction on the outer side of the inner support top template (2) is completed, the lining trolley without a portal frame is demoulded and then moved to the next section to repeat the method and method for concrete pouring construction.