A direct-connected test bench air supply and regulation system

By using a mixing-overflow structure and a water-cooled venturi in a direct-connected test bench combined with a cold flow calibration method, the problems of high cost and low measurement accuracy of high-temperature regulating valves and high-temperature orifice flowmeters are solved, and low-temperature flow rates are achieved. Cost-effective, efficient air flow regulation and measurement for a variety of airflow conditions.

CN112816219BActive Publication Date: 2024-10-29INST OF AEROSPACE TECH CHINA AERODYNAMIC RES & DEV CENT
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202110160408.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-02-05
Publication Date
2024-10-29
Estimated Expiration
2041-02-05

AI Technical Summary

Technical Problem

In the design of the mixing section of the existing direct-connected test bench, there are problems such as the high cost of high-temperature regulating valves and high-temperature orifice flow meters, and the measurement accuracy is affected by polluted air. Especially on small test benches, the modification cost is high and difficult to implement. Precise regulation and measurement of flow.

Method used

An air supply conditioning system composed of a mixing tube, a steady flow tube, a diverter tube, an overflow tube and an overflow venturi is used, and a double throttling orifice structure and a water-cooled venturi combined with a cold flow calibration method are used to achieve Regulation and precise measurement of high-temperature air flow reduce costs and improve measurement accuracy.

Benefits of technology

It realizes low-cost and efficient air flow adjustment and measurement, is suitable for various sub/supersonic air flow conditions, reduces the measurement and control requirements of the test bench, and avoids the influence of polluted air components on the measurement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112816219B_ABST
    Figure CN112816219B_ABST
Patent Text Reader

Abstract

The invention patent discloses an air supply and regulation system for a direct-connected test bench, which specifically relates to the technical field of direct-connected ground tests of engines. An air supply and regulation system for a direct-connected test bench includes a mixing tube, a flow stabilizing tube, a flow splitter, an overflow tube, a transition tube and an overflow venturi. The mixing tube is connected to an air collecting ring, and a cold air interface is provided on the air collecting ring. An air collecting cavity is provided in the mixing tube, and a cold air mixing hole is provided on the air collecting cavity. The flow splitter is connected to the flow stabilizing tube, and one side of the flow splitter is composed of two main outlet pipes and a bypass outlet pipe arranged in parallel. The main outlet pipe is connected to the transition pipe, and a first throttling orifice is provided between the transition pipe and the flow splitter. The bypass outlet pipe is connected to the overflow pipe, and a second throttling orifice is provided in the overflow pipe. The technical solution of the invention solves the problems that the components required in the existing overflow section are expensive and there are errors in the flow measurement of polluted air, and can be used for sub / supersonic and hypersonic test conditions of combustion heating test benches.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of engine ground direct-connection testing, and in particular to an air supply and regulation system for a direct-connection test bench. Background Art

[0002] In the ground direct-connection test, in order to simulate high-altitude and high-speed conditions, the test bench needs to provide high-temperature and high-pressure air flow to the engine inlet, and the supply air is mainly heated by electric heating or combustion heating. The electric heating direct-connection test bench is limited by the materials of the electric heating elements, and the total temperature of the air at the heater outlet is generally less than 1100K; the combustion heating direct-connection test bench is limited by the combustion stability and combustion efficiency of the heater, and the total temperature of the air at the heater outlet is generally above 850K. Therefore, sub / supersonic operating conditions tests with a total temperature below 1100K are usually carried out on the electric heating direct-connection test bench, while hypersonic operating conditions tests with a total temperature above 1100K are usually carried out on the combustion heating direct-connection test bench.

[0003] In order to reduce the cost of equipment construction and improve its utilization efficiency, a mixing section can also be designed based on the existing combustion heating direct-connected test bench. The total temperature of the air at the combustion heater outlet can be reduced by mixing cold air, thereby broadening the range of test conditions and enabling one wind tunnel equipment to cover all test conditions such as subsonic / supersonic and hypersonic.

[0004] The outlet air of the combustion heater has not only a minimum total temperature limit, but also a minimum flow limit. Under the minimum outlet flow, the lower the total air temperature required by the test condition, the greater the cold air mixing amount and the mixed air flow. When the mixed air flow is greater than the flow required by the test condition, an overflow device needs to be designed to discharge the excess high-temperature air. Therefore, when using a combustion heating direct-connected test bench to conduct tests under conditions with a total temperature below 1100K, it is necessary to modify the existing test bench, usually by adding cold air mixing and overflow sections.

[0005] At present, it is common to add a mixing section to the combustion heating wind tunnel and the direct-connected test bench to expand the total temperature range of the test conditions, but the design of a mixing section plus an overflow section is relatively rare. The main reason is that this scheme has the following two design difficulties: one is to adjust the high-temperature gas flow entering the transition duct; the other is to accurately measure the flow.

[0006] The high-temperature gas in the mixing section is divided into two paths, one enters the test model through the transition pipe, and the other is discharged through the overflow section. In order to meet the working conditions of different test models, it is necessary to design a regulating device in the overflow section to adjust the air flow entering the transition pipe, and the air flow of the transition pipe after the diversion also needs to be remeasured, and indirectly adjust the air flow entering the transition pipe, and the air flow of the transition pipe after the diversion also needs to be remeasured. Some existing technical solutions usually use high-temperature regulating valves to adjust the high-temperature air flow, and use high-temperature orifice flowmeters to measure the high-temperature air flow. However, high-temperature regulating valves and high-temperature orifice flowmeters are expensive, and the latter needs to be imported from abroad. For small direct-connected test benches, the cost of this modification plan is relatively high. In addition, high-temperature orifice flowmeters are usually used for pure air flow measurement, and there are errors in measuring polluted air after the combustion heater. Summary of the invention

[0007] The present invention is intended to provide a direct-connection test bench air supply and regulation system, which solves the problems that the components required in the existing overflow section are expensive and there are errors in the flow measurement of polluted air.

[0008] In order to achieve the above-mentioned purpose, the technical scheme of the present invention is as follows: a direct-connected test bench air supply and conditioning system, comprising a mixing tube, a flow stabilizing tube, a flow diverter, an overflow tube, a transition tube and an overflow venturi which are detachably connected from left to right in sequence, the cross-section of the mixing tube is trumpet-shaped, the outside of the mixing tube is connected to an air collecting ring, the air collecting ring is provided with a cold air interface, the mixing tube is provided with an air collecting cavity connected to the air collecting ring, and the air collecting cavity is provided with a plurality of cold air mixing holes; the flow stabilizing tube adopts a constant diameter tube, the inner diameter of the flow stabilizing tube is equal to the diameter of the widest part of the mixing tube outlet; the inlet of the flow diverter is connected to the outlet of the flow stabilizing tube, the flow diverter is composed of two main outlet pipes and a bypass outlet pipe arranged in parallel, the main outlet pipe is connected to the transition pipe, a first throttling orifice is provided between the transition pipe and the flow diverter, the bypass outlet pipe is connected to the overflow pipe, a second throttling orifice is provided in the overflow pipe, and the overflow venturi is arranged at the outlet of the overflow pipe.

[0009] Principle and effect of the technical solution: The mixing tube in this solution is connected to the hot air at the outlet of the combustion heater, and the mixed cold air enters the air collecting ring through the cold air interface and is injected into the mixing tube through the cold air mixing hole. The air collecting cavity can rectify the cold air and then mix and cool the hot air in the mixing tube. The cold air and hot air in the mixing tube enter the flow stabilizing tube of equal diameter and are further mixed, thereby improving the uniformity of the flow field and making the temperature of each point in the flow stabilizing tube the same. The mixed air flowing through the flow stabilizing tube enters the main outlet tube and the bypass outlet tube of the flow divider respectively. The mixed air flowing through the main outlet tube passes through the first throttling orifice plate and the transition tube and is connected to the test model to complete the test, thereby providing the test model with the required high-temperature and high-pressure air flow; and the mixed air flowing through the bypass outlet tube and the overflow tube can enter the overflow venturi after passing through the second throttling orifice plate, thereby measuring the overflow flow with the help of the venturi and discharging the excess mixed air into the atmosphere, thereby indirectly realizing the measurement of the mixed air flow entering the test model, and at the same time, with the help of the first throttling orifice plate and the second throttling orifice plate, a wide range of adjustment of the air flow entering the test model can be achieved.

[0010] Furthermore, the cold air mixing holes are arranged in three rows, any one row of the cold air mixing holes is arranged on the sealing end surface of the mixing tube inlet, and the other two rows of the cold air mixing holes are staggeredly arranged on the inner wall of the mixing tube inlet.

[0011] Through the above arrangement, the cold air can completely cover the inner wall of the mixing tube, thereby forming a cold air film to prevent the hot air from the heater from burning the wall of the mixing tube.

[0012] Furthermore, the throttling orifice plate is a circular flat plate structure, and a throttling hole of equal diameter is opened in the center of the throttling orifice plate.

[0013] Furthermore, the air flow rate adjustment formula in the transition pipe and the overflow pipe is: Assume that the total air flow rate is The air flow rate of the transition duct is The air flow rate of the overflow pipe is The total pressure of the flow regulator is P 0w , the total temperature is T 0 , the equivalent area of ​​the throttle hole of the transition pipe is A test The transition pipe is the first throttling orifice plate, and the equivalent area of ​​the throttling orifice of the overflow pipe is A. over , the overflow pipe is the second throttling orifice plate, and the flow formula of the choked flow is:

[0014]

[0015]

[0016] Furthermore, the air flow rate in the overflow venturi is measured by measuring the total flow rate in the cold flow field of the air, hydrogen, oxygen and kerosene supply pipelines on the test bench. During the test and debugging phase, the flow channel of the transition pipe is blocked with a baffle to allow all polluted air flow to The total pressure P′ of the Venturi tube is measured by the water-cooled Venturi tube passing through the overflow pipe. 0ven , according to the flow formula:

[0017]

[0018] The constant term K of the polluted air in the heater and mixed state can be obtained conta ; During the formal test, keep the heater working condition and mixing state, then K conta and T 0 The parameters remain unchanged, the transition pipe channel is opened, and the total pressure of the venturi tube is P 0ven , then the polluted air flow rate through the water-cooled venturi is:

[0019]

[0020] Then the polluted air flow entering the transition duct is:

[0021]

[0022] Compared with the prior art, this solution has the following beneficial effects:

[0023] 1. The mixing-overflow structure of this scheme is simple and the processing cost is low. The key technical solutions such as the double throttling orifice plate structure, water-cooled venturi and cold flow calibration method are adopted, which greatly reduces the cost of finished products such as existing high-temperature regulating valves and high-temperature orifice flowmeters, and also greatly reduces the measurement and control requirements for the test bench.

[0024] 2. This solution can simultaneously complete the flow regulation and accurate flow measurement of the high-temperature air entering the transition duct. The existing combustion heater outlet airflow can be quickly adjusted to the temperature flow required by the test model through very few debugging trips, and has the advantage of high regulation efficiency.

[0025] 3. The mixing section of this scheme adopts the wall small hole mixing method. The mixed cold air can completely cover the inner wall of the mixing section, forming a cold air film on the inner wall before complete mixing. When the test condition is lower than 1000K, there is no need to design a water cooling structure. It has the advantages of simple structure, low processing cost and long test time.

[0026] 4. The double throttling orifice structure of this scheme adjusts the air flow of the transition pipe and the overflow path at the same time, and has the advantages of a wide flow adjustment range and a wide total pressure application range, which can meet the needs of various sub-supersonic airflow conditions. However, the existing high-temperature regulating valve has a limited flow adjustment range and is only applicable to a certain airflow total pressure range. And the orifice plate can achieve high-precision flow regulation through high-precision processing technology.

[0027] 5. The high-temperature air flow measurement method of the water-cooled venturi measurement combined with cold flow calibration in this scheme has the advantages of a wide flow measurement range, high measurement accuracy, and no influence from polluted air components. Existing high-temperature orifice flowmeters usually have a certain flow and temperature measurement range, and the measurement accuracy is affected by the airflow temperature, and there is a large error when measuring polluted air. The high-temperature air flow measurement method proposed in the present invention can achieve the measurement of a wide range of flow by processing low-cost water-cooled venturis with different throat diameters, and the measurement accuracy is not affected by temperature and polluted air components. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a front view of an air supply and conditioning system for a direct-connected test bench of the present invention;

[0029] Figure 2 It is a cross-sectional view of an air collecting ring in an air supply and regulating system of a direct-connected test bench of the present invention. DETAILED DESCRIPTION

[0030] The present invention is further described in detail below through specific embodiments:

[0031] The figure marks in the drawings of the specification include: mixing tube 1, flow stabilizing tube 2, overflow tube 3, transition tube 4, overflow venturi 5, air collecting ring 6, cold air interface 7, cold air pipe 8, cold air mixing hole 9, first throttling orifice plate 10, second throttling orifice plate 11, main outlet pipe 12, bypass outlet pipe 13.

[0032] Example

[0033] As attached Figure 1 and Figure 2As shown: a direct-connected test bench air supply and regulation system, including a mixing tube, a flow stabilizing tube, a diverter tube, an overflow tube, a transition tube and an overflow venturi, which are bolted together from left to right in sequence. The cross-section of the mixing tube is trumpet-shaped. The left side of the mixing tube is covered with a first flange and an air collecting ring located outside the first flange. The mixing tube and the combustion heater can be fixedly connected together with the help of the first flange. A plurality of cold air interfaces are equidistantly distributed on the outer side of the air collecting ring. In this embodiment, six cold air interfaces are used, and the six cold air interfaces are commonly connected to a cold air source. The above-mentioned cold air source can be a cold air storage tank or a cold air supply pipeline. A plurality of cold air pipes are connected between the inner side of the air collecting ring and the mixing tube. The plurality of cold air pipes are equidistantly distributed outside the mixing tube, and each cold air pipe passes through the first flange. An air collecting cavity connected to an air collecting ring is provided inside the mixing tube, and three rows of cold air mixing hole groups are opened on the air collecting cavity, and each row of cold air mixing hole groups is composed of a plurality of cold air mixing holes equidistantly arranged circumferentially on the air collecting cavity, wherein a row of cold air mixing hole groups is arranged between the left side of the air collecting cavity and the flange sealing end face, and two rows of staggered cold air mixing hole groups are arranged between the inner side of the air collecting cavity and the inner wall of the mixing tube. With the aid of the air collecting ring, the air collecting cavity and the cold air mixing holes, the cold air passing through the cold air interface can form a cold air film along the inner wall of the mixing tube, thereby preventing the hot air of the heater (generally above 1100K) from ablating the wall surface of the inner mixing tube, thereby extending the service life of the mixing tube.

[0034] The right side of the mixing tube and the left side of the flow stabilizing tube are both provided with the same second flange, so that the mixing tube and the flow stabilizing tube can be fixedly connected together with the help of the second flange. The flow stabilizing tube adopts an equal diameter tube, which can enhance the mixing effect of the two airflows of hot air and cold air, and improve the uniformity of the flow field. The inner diameter of the flow stabilizing tube is equal to the diameter of the widest part of the mixing tube outlet. The diverter pipe and the overflow pipe are arranged in parallel at the right end of the flow stabilizing tube, so as to discharge the excess mixing flow under the set test flow conditions.

[0035] A third flange is provided on the right side of the flow stabilizing tube and the left side of the flow diversion tube, so that the flow stabilizing tube and the flow diversion tube can be fixedly connected together with the help of the third flange; the flow diversion tube is composed of a main outlet pipe and a bypass outlet pipe arranged in parallel up and down, the main outlet pipe is connected to the transition pipe, and the bypass outlet pipe is connected to the drainage pipe, so as to discharge excess mixed flow under the set test flow conditions.

[0036] The right outlet of the main outlet pipe and the left inlet of the transition pipe are both provided with a fourth flange. The main outlet pipe and the transition pipe can be connected together by means of two fourth flanges. The directions of the main outlet pipe and the transition pipe are both kept in the same straight line with the air flow direction in the flow stabilizing pipe. A first throttling orifice is provided between the transition pipe and the main outlet pipe. The first throttling orifice is connected to the fourth flange of the transition pipe by internal screws. A fifth flange is provided on the right side of the transition pipe, which is connected to the test model by means of the fifth flange.

[0037] The outlet of the bypass outlet pipe and the inlet of the overflow pipe are both provided with a sixth flange. The bypass outlet pipe and the overflow pipe can be fixedly connected together with the help of two sixth flanges. The left end of the overflow pipe is a curved pipe. The direction of the overflow pipe is not in a straight line with the flow direction of the air in the steady flow pipe. In this embodiment, the overflow pipe is composed of two overflow pipes in the shape of "L" and "I". The connection of the two overflow pipes is provided with a seventh flange. The overflow pipe is provided with a second throttling orifice plate, and the second throttling orifice plate is connected to the seventh flange by an inner screw. The first throttling orifice plate and the second throttling orifice plate are both circular flat plate structures with a throttling hole in the center. The screws used on the first throttling orifice plate and the second throttling orifice plate are both high-temperature resistant titanium alloy screws. The first throttling orifice plate and the second throttling orifice plate have a simple structure and are easy to disassemble and assemble. By replacing the throttling orifice plates with different throttling apertures, the air flow can be quickly adjusted. Compared with the high-temperature regulating valve, the structure is simpler and more reliable, and the cost is greatly reduced.

[0038] The right end of the overflow pipe and the connection of the overflow venturi are both provided with an eighth flange, and the overflow pipe and the overflow venturi can be fixedly connected together by means of two eighth flanges. The overflow venturi is arranged at the right end of the overflow pipe, and the overflow venturi adopts a throat water cooling structure.

[0039] Working process of this scheme: The mixing tube in this scheme is connected to the hot air at the outlet of the combustion heater. The cold air provided by the cold air source enters the air collecting ring through the cold air interface and is injected into the mixing tube through the cold air mixing hole. The air collecting cavity can rectify the cold air and mix and cool the hot air in the mixing tube; the mixed air after cooling flows through the flow stabilizing tube and is further mixed evenly. The mixed air flowing through the flow stabilizing tube enters the diverter tube and is divided into two air paths, the main outlet tube and the bypass outlet tube. The mixed air flowing through the main outlet tube passes through the first throttling orifice plate and the transition tube and is connected to the test model to complete the test. The air inflow temperature of the test model is adjusted by the cold air mixing flow in the mixing tube. When the temperature and flow of the hot air at the outlet of the combustion heater remain unchanged, the larger the cold air mixing flow in the mixing section, the lower the air inflow temperature of the transition tube. Taking a hydrogen-oxygen combustion heater as an example, the lowest total temperature of the hot air at the outlet of the heater is about 1200K, and the lowest flow rate is 1.5kg / s. When the mixed cold air flow is 5 times the hot air at the heater outlet (i.e. 7.5kg / s), the total temperature of the mixed air flow can be reduced to 400K, which can basically cover the total temperature indicators of all sub-supersonic working conditions. When the inner diameter of the left inlet of the mixing tube in this embodiment is 160mm, it can achieve cold air injection and rapid mixing of more than 8kg / s, which can cover the air flow requirements of most current direct-connected tests of engine combustion chambers. If the air flow requirement of the direct-connected test is larger, the size of the mixer can be correspondingly expanded according to the above structure to achieve it.

[0040] The mixed air flowing through the bypass outlet pipe of the diverter pipe can enter the overflow venturi through the overflow pipe and the second throttling orifice plate, so that the overflow flow rate is measured with the help of the water-cooled venturi and the cold flow calibration method, which indirectly realizes the measurement of the mixed air flow rate of the test model and can discharge the excess mixed air.

[0041] The method used for flow regulation in this embodiment is as follows: Most existing design schemes only regulate the air flow on one pipeline, and the other pipeline uses a fixed throat. Assume that the total air flow is The air flow rate of the transition duct is The air flow rate of the overflow pipe is The total pressure of the flow regulator is P 0w , the total temperature is T 0 , the equivalent area of ​​the throttle hole of the transition pipe is A test The transition pipe is the first throttling orifice plate, and the equivalent area of ​​the throttling orifice of the overflow pipe is A. over , the overflow pipe is the second throttling orifice plate, and the flow formula of the choked flow is:

[0042]

[0043]

[0044] From the above formula, we can see that if A over Unchanged, at total air flow Under the same condition, adjust the throttle hole area A of the transition pipe test , not only the air flow of the transition pipe changes, but also the total pressure of the steady flow section changes accordingly, limiting the adjustment range. test and A over If they change at the same time and in opposite directions, it will not only improve the regulation efficiency (A over / A test The ratio changes faster), and the total pressure in the steady flow section can be maintained unchanged (maintaining A test +A over =const). This expands the applicable working conditions of the present solution. The air flow required by the transition duct can be obtained by adjusting the double throttling orifice plate of the present embodiment, but the air flow needs to be accurately measured to obtain accurate test parameters.

[0045] The existing high-temperature orifice flowmeters are not only complex in structure and very expensive, but also have the problem of the influence of high temperature and combustion pollution media on the measurement. The present embodiment proposes to design a water-cooled venturi in the overflow pipe. Under the condition of ensuring that the throat area of ​​the venturi in the water-cooled venturi is constant, the relationship between the flow rate and pressure of the water-cooled venturi is used. Combined with the method of total flow calibration under the cold state of the supply system, it not only has a simple structure and low cost, but also can eliminate the influence of combustion pollution media on the measurement, and does not interfere with the flow field of the transition pipe and the test model. The main measurement method is as follows: the total flow is measured in the cold flow field of the air, hydrogen, oxygen and kerosene supply pipelines on the test bench. During the test and debugging phase, the flow channel of the transition pipe is blocked with a baffle to allow all polluted air flow to The total pressure P′ of the Venturi tube is measured by the water-cooled Venturi tube passing through the overflow pipe. 0ven , according to the flow formula:

[0046]

[0047] The constant term K of the polluted air passing through the water-cooled venturi under the heater and mixed state can be obtained: conta ; During the formal test, keep the heater working condition and mixing state, then K conta and T 0 When the parameters remain unchanged, the ratio of the flow rate and total pressure of the water-cooled venturi tube remains unchanged. Open the transition pipe channel, and the total pressure of the venturi tube measured at this time is P 0ven , then the polluted air flow rate through the water-cooled venturi is:

[0048]

[0049] Then the polluted air flow rate entering the transition duct and the test model is:

[0050]

[0051] It can be seen from formula (5) that the method of combining the overflow section water-cooled venturi measurement with the cold flow calibration of the present invention only requires one more debugging trip with the transition pipe fully blocked to measure the total flow of the cold flow field of the supply pipeline. and the total pressure P′ of the water-cooled venturi of the commissioning train 0ven , combined with the total pressure P of the water-cooled venturi measured in the formal test 0ven , the transition pipe polluted air flow rate can be calculated by formula (5) This method has the advantages of requiring fewer measurement parameters, simple calculation method, and being independent of polluted air components.

[0052] The above are only embodiments of the present invention, and the common knowledge such as the known specific structures and / or characteristics in the scheme are not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the structure of the present invention, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. A direct-connected test bench air supply and conditioning system, characterized in that: It includes a mixing tube, a flow stabilizing tube, a flow splitter, an overflow tube, a transition tube and an overflow venturi tube which are detachably connected from left to right. The cross-section of the mixing tube is trumpet-shaped. The outside of the mixing tube is connected to an air collecting ring. The air collecting ring is provided with a cold air interface. The mixing tube is provided with an air collecting cavity connected to the air collecting ring. The air collecting cavity is provided with a plurality of cold air mixing holes. The flow stabilizing tube adopts an equal-diameter tube. The inner diameter of the flow stabilizing tube is equal to the diameter of the widest part of the mixing tube outlet. The inlet of the flow splitter is connected to the outlet of the flow stabilizing tube. The flow splitter is composed of two main outlet pipes and a bypass outlet pipe arranged in parallel. The main outlet pipe is connected to the transition pipe. A first throttling orifice is provided between the transition pipe and the flow splitter. The bypass outlet pipe is connected to the overflow pipe. A second throttling orifice is provided in the overflow pipe. The overflow venturi is arranged at the outlet of the overflow pipe. The cold air mixing holes are arranged in three rows, any one row of the cold air mixing holes is arranged at the sealing end surface of the mixing tube entrance, and the other two rows of the cold air mixing holes are arranged alternately on the inner wall of the mixing tube entrance; The throttling orifice plate is a circular flat plate structure, and a throttling hole of equal diameter is opened in the center of the throttling orifice plate.

2. The direct-connected test bench air supply and conditioning system according to claim 1 is characterized in that: The air flow rate adjustment formula in the transition pipe and the overflow pipe is: Assume the total air flow rate is The air flow rate of the transition duct is The air flow rate of the overflow pipe is The total pressure of the flow tube is P 0w , the total temperature is T0, and the equivalent area of ​​the throttle hole of the transition pipe is A test The transition pipe is the first throttling orifice plate, and the equivalent area of ​​the throttling orifice of the overflow pipe is A. over , the overflow pipe is the second throttling orifice plate, and the flow formula of the choked flow is:

3. The air supply and conditioning system for a direct-connected test bench according to claim 1 is characterized in that: The air flow rate in the overflow venturi is measured by measuring the total flow rate in the cold flow field of the air, hydrogen, oxygen and kerosene supply pipelines on the test bench. During the test and debugging phase, the flow channel of the transition pipe is blocked with a baffle to allow all polluted air flow to The total pressure P′ of the Venturi tube is measured by the water-cooled Venturi tube passing through the overflow pipe. 0ven , according to the flow formula: The constant term K of the polluted air in the heater and mixed state can be obtained conta ; During the formal test, keep the heater working condition and mixing state, then K conta The parameters of T0 and T1 remain unchanged, and the transition pipe channel is opened. The total pressure of the venturi tube is P 0ven , then the polluted air flow rate through the water-cooled venturi is: Then the polluted air flow entering the transition duct is:

Citation Information

Patent Citations

  • Intercooled cycle marine gas turbine seawater heat exchanger based on constant-temperature blending system

    CN110332826A

  • Test system and method for simulating aero-engine oil pump ventilation bearing cavity performance

    CN112254971A

  • Multi-path parameter adjustment direct connection type test platform under low total temperature condition

    CN117109930A

  • Direct connection type test bench air supply adjusting system

    CN214408045U

  • Evaluation system for simulated exhaust gas

    JP5075286B1