A rock burst prevention face structure for tunnel excavation and a rock burst prevention tunnel excavation method
By adopting a rock burst-proof tunnel face structure during tunnel excavation and using convex surfaces and annular grooves to disperse stress, the problem of preventing rock burst disasters during tunnel excavation is solved and construction safety and stability are improved.
Patent Information
- Application Number
- CN202210430559.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-04-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-04-22
AI Technical Summary
Existing technologies are difficult to effectively prevent rock burst disasters during tunnel excavation, leading to damage to the construction surface and safety risks. The existing protective measures are not ideal.
The anti-rockburst tunnel face structure is adopted, including a special-shaped surface with a convex surface shape of a sphere or an ellipsoid intersecting with the ground, and an annular groove is set around it. The anti-rockburst tunnel face is formed through multiple blastings and high-pressure water flushing. Disperses stress and relaxes rock mass.
Effectively disperse stress, reduce the risk of rock burst, ensure construction safety, and extend the safety and stability during tunnel excavation.
Smart Images

Figure CN114737977B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel excavation, and in particular to a rockburst proof tunnel face structure for tunnel excavation and a rockburst proof tunnel excavation method. Background Art
[0002] Rockburst is a sudden disaster that is particularly common during tunnel excavation. Rockburst is extremely destructive, not only causing serious damage to the excavation working face, but also endangering the lives of construction workers and damaging engineering equipment. At present, how to effectively avoid rockburst disasters during construction, effectively resist rockburst disasters and protect the lives of construction workers has become a global problem that needs to be solved urgently in the field of rock underground engineering and rock mechanics.
[0003] In the prior art, the prevention and control measures for rock burst mainly include water spraying, advanced stress relief blasting, sprayed steel fiber concrete, and hanging flexible protective nets, etc.; however, in engineering practice, the effects of the above-mentioned protective measures are not very ideal.
[0004] like Figure 1 As shown, it is a schematic diagram of the face structure during tunnel excavation in the prior art. The stress is usually concentrated at the corners of the face. When the high-energy storage rock mass is triggered once or multiple times by the external load, the fragile balance between the internal stress of the surrounding rock mass and the rock mass strength is broken, causing rock burst disasters. Summary of the invention
[0005] An object of the present invention is to provide a rockburst proof tunnel face structure for tunnel excavation and a rockburst proof tunnel excavation method to solve the problems in the prior art.
[0006] To achieve the above object, the technical solution adopted by the present invention is:
[0007] An embodiment of the present invention provides a rockburst prevention face structure for tunnel excavation, including a face used for blasting and excavation operations during tunnel excavation, wherein the surface shape of the rockburst prevention face is a convex surface opposite to the tunnel excavation direction, and the surface shape of the convex surface is a special-shaped surface formed by the intersection of a spherical surface or an ellipsoidal surface and the ground;
[0008] The center of the convex surface is located above the ground;
[0009] An annular groove is provided around the convex surface, and the annular groove has a smooth transition with the convex surface and the tunnel wall.
[0010] An embodiment of the present invention provides a rockburst-proof tunnel excavation method, which is used in the construction process of the rockburst-proof tunnel face structure, and includes the following steps:
[0011] S1: During tunnel excavation, the area with rock burst hazard in the surrounding rock mass and the section where the preset tunnel path overlaps form the rock burst hazard section, and the remaining sections on the preset tunnel path form the ordinary tunnel section. During the excavation of the ordinary tunnel section, conventional means are used for excavation; when conventional means are used for excavation, the tunnel face used is defined as the conventional tunnel face;
[0012] S2: multiple boreholes are set along the edge of the conventional face in the direction of tunnel excavation, offset from the center of the conventional face, and the multiple boreholes form a groove hole array and a blasting hole respectively;
[0013] S3: Load the blasting tube in the blasting hole and detonate it after loading. After the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the first annular groove is formed at the edge of the conventional face.
[0014] S4: flush the first annular groove with high pressure water for a certain period of time;
[0015] S5: a plurality of drill holes are arranged in an array around the center of a circle on the conventional tunnel face, the bottoms of the plurality of drill holes are all against the first rock burst prevention tunnel face, and the plurality of drill holes respectively form a groove hole array and a blasting hole;
[0016] S6: Load blasting tubes in the blasting holes and detonate them after loading. After the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the newly exposed surrounding rock mass forms the first rockburst prevention face.
[0017] S7: a plurality of drill holes are arranged in an array around the center of the first rockburst prevention tunnel face, the bottoms of the plurality of drill holes are all against the second rockburst prevention tunnel face, and the plurality of drill holes respectively form a groove hole array and a blasting hole;
[0018] S8: Load blasting tubes in the blasting holes and detonate them after loading. After the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the newly exposed surrounding rock mass forms the second rockburst prevention face.
[0019] S9: multiple boreholes are set along the edge of the second rock burst prevention face in the tunnel excavation direction, offset from the center of the conventional face, and the multiple boreholes respectively form a groove hole array and a blasting hole;
[0020] S10: loading a blasting tube into the blasting hole, and detonating the tube after loading; after the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and a second annular groove is formed at the edge of the second rock burst prevention face;
[0021] Repeat steps S4, S7, S8, S9 and S10, continue to advance forward using the excavation method of the anti-rockburst face until the rockburst potential section is passed, and then switch to conventional means for excavation.
[0022] Preferably, the depth of the annular groove is greater than the blasting depth of the rock burst prevention face.
[0023] Preferably, when high-pressure water is used to flush the first annular groove, the tunnel wall and the heading face are also flushed with high-pressure water.
[0024] Preferably, the method further comprises the following steps: during the excavation of the rock burst prevention tunnel, water injection holes are opened on the tunnel wall at certain intervals, and high-pressure water is poured into the water injection holes.
[0025] Preferably, the depth of the annular groove is more than twice the blasting depth of the rock burst prevention face.
[0026] One or more of the above technical solutions in the embodiments of the present invention have at least the following technical effects or advantages:
[0027] In the embodiment of the present invention, the face of the excavation operation is convex, so stress concentration is not easy to occur. At the same time, there is an annular groove around the convex surface, which expands the surface area of the face, so that the stress is further dispersed. At the same time, water can accumulate in the annular groove, which can relax the stress on the face of the excavation operation, making it difficult for the stress to accumulate and concentrate. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 A schematic diagram of tunnel excavation of a conventional face is provided for an embodiment of the present invention;
[0030] Figure 2 A schematic diagram of the structure of a rockburst prevention face provided by an embodiment of the present invention;
[0031] Figure 3 A schematic diagram of tunnel excavation for a rockburst-proof face provided by an embodiment of the present invention;
[0032] Figure 4 A schematic diagram of blasting of a rockburst prevention face provided by an embodiment of the present invention; DETAILED DESCRIPTION
[0033] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0034] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0036] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] The rockburst-proof tunnel face structure and rockburst-proof tunnel excavation method provided in the embodiments of the present invention belong to the technical field of tunnel excavation, and the application scenario can be: tunnel excavation construction scenario. It can be understood that in the prior art, such as Figure 1 As shown, it is a schematic diagram of the face structure during tunnel excavation in the prior art. The stress is usually concentrated at the corners of the face. When the high-energy storage rock mass is triggered once or multiple times by the external load, the fragile balance between the internal stress of the surrounding rock mass and the rock mass strength is broken, causing rock burst disasters.
[0038] Based on this, how to provide a rock burst proof face structure and a rock burst proof tunnel excavation method for tunnel excavation is a technical problem that needs to be solved urgently.
[0039] The technical solution of the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0040] refer to Figure 2-3The embodiment of the present invention provides a rockburst prevention face structure for tunnel excavation, including a face used for blasting and excavation operations during tunnel excavation. The surface shape of the rockburst prevention face 2 is a convex surface opposite to the tunnel excavation direction, and the surface shape of the convex surface is a special-shaped surface formed by the intersection of a sphere or an ellipsoid and the ground; the center of the convex surface is located above the ground; an annular groove 3 is opened around the convex surface, and the annular groove 3 has a smooth transition with the convex surface and the tunnel wall.
[0041] It should be noted that rockburst is a geological disaster that affects tunnel construction. In essence, it is the high elastic strain energy accumulated in the rock mass. Due to the excavation of underground projects, the balance of its original ground stress is destroyed, and local stress concentration is generated in certain parts of the tunnel arch and two walls. When it exceeds the shear strength of the rock, the high elastic strain energy is suddenly released, and the intact rock mass on the hollowed-out pilot pit arch, working face and two walls suddenly bursts and is rapidly destroyed, resulting in a construction geological phenomenon. Among them, the factors that cause rock bursts mainly include internal and external factors, geological factors (internal factors): a. Geological factors: In high-altitude stress areas, most rock bursts occur in high-altitude stress areas, and the dominant factor in rock bursts is the tectonic stress that has long existed in the earth's crust; b. A certain burial depth, most rock bursts occur in tunnels with a burial depth of 200 to 700 meters or more; c. Hard and brittle rocks, most rock bursts occur in brittle rock strata, such as granite, diorite, basalt and other igneous rocks, siliceous limestone, limestone, dolomite and other sedimentary rocks, quartzite, plagioclase granite, marble, granite gneiss and other metamorphic rocks. Only brittle rock masses are prone to brittle deformation and bursting; d. Tunnels that are perpendicular or nearly perpendicular to the main ground stress orientation. The above four factors can be said to be indispensable; other factors (external factors): a. Uneven tunnel rock surface (such as the surface of an over-excavated or under-excavated tunnel rock mass is prone to rock bursts due to stress concentration). The surface of an over-excavated or under-excavated tunnel rock mass is prone to rock bursts because such a rock mass surface forms many defects and angles, which are prone to stress concentration; b. Surrounding rock mass with an integral or massive structure. This is because a large amount of ground stress is easily accumulated in a complete or substantially complete rock mass, forming a very high elastic deformation energy, while broken rock is not easy to accumulate ground stress due to its relaxation effect on ground stress; c. Dry surrounding rock. Rock bursts almost always occur under dry surrounding rock conditions. In the present application, the face of the excavation operation is convex, so it is not easy to produce stress concentration. At the same time, there is an annular groove 3 around the convex surface, which expands the surface area of the face, so that the stress is further dispersed. At the same time, water can accumulate in the annular groove 3, which can relax the stress on the face of the excavation operation, making it difficult to accumulate and concentrate stress.
[0042] An embodiment of the present invention provides a rockburst-proof tunnel excavation method, which is used in the construction process of the rockburst-proof tunnel face structure, and includes the following steps:
[0043] S1: During tunnel excavation, the area with rock burst hazard in the surrounding rock mass and the section where the preset tunnel path overlaps form the rock burst hazard section, and the remaining sections on the preset tunnel path form the ordinary tunnel section. During the excavation of the ordinary tunnel section, conventional means are used for excavation; when conventional means are used for excavation, the tunnel face used is defined as the conventional tunnel face;
[0044] S2: multiple boreholes are set along the edge of the conventional tunnel face 1 in the direction of tunnel excavation, offset from the center of the conventional tunnel face 1, and the multiple boreholes respectively form a groove hole array and a blasting hole;
[0045] S3: loading blasting tubes in the blasting holes and detonating them after loading; after the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and a first annular groove 3 is formed at the edge of the conventional tunnel face 1;
[0046] S4: flushing the first annular groove 3 with high pressure water for a certain period of time;
[0047] S5: multiple boreholes are arranged in an array around the center of the conventional tunnel face 1, the bottoms of the multiple boreholes are all against the first rock burst prevention tunnel face, and the multiple boreholes respectively form a groove hole array and a blasting hole;
[0048] S6: loading blasting tubes in the blasting holes and detonating them after loading; after the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the newly exposed surrounding rock mass forms the first rock burst prevention face 2;
[0049] S7: a plurality of drill holes are arranged in an array around the center of the first rockburst prevention tunnel face 2, the bottoms of the plurality of drill holes are all against the second rockburst prevention tunnel face 2, and the plurality of drill holes respectively form a groove hole array and a blasting hole;
[0050] S8: loading blasting tubes in the blasting holes and detonating them after loading; after the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the newly exposed surrounding rock mass forms the second rock burst prevention face 2;
[0051] S9: multiple boreholes are set along the edge of the second rock burst prevention face 2 in the tunnel excavation direction and offset from the center of the conventional face, and the multiple boreholes respectively form a groove hole array and a blasting hole;
[0052] S10: loading a blasting tube into the blasting hole and detonating the tube after loading; after the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and a second annular groove 3 is formed at the edge of the second rock burst prevention face 2;
[0053] Repeat steps S4, S7, S8, S9 and S10, continue to advance forward using the excavation method of the rock burst prevention tunnel face 2 until the rock burst potential section is passed, and then switch to conventional means for excavation.
[0054] In some embodiments, the depth of the annular groove 3 is greater than the blasting depth of the rock burst prevention tunnel face 2 .
[0055] Preferably, when high-pressure water is used to flush the first annular groove 3, the tunnel wall and the heading face are also flushed with high-pressure water.
[0056] In some embodiments, the following steps are also included: during the rock burst prevention tunnel excavation process, water injection holes are opened on the tunnel wall at certain intervals, and high-pressure water is poured into the water injection holes.
[0057] In some embodiments, the depth of the annular groove 3 is twice the blasting depth of the rockburst prevention face 2, wherein, before each blasting of the rockburst prevention face 2, the edge of the rockburst prevention face 2 is further blasted to form a deeper annular groove 3, that is to say, by blasting the annular groove 3 deeper in the excavation direction in advance, it can be discovered in advance that the excavation has reached a high stress area, so as to prepare the rockburst prevention face 2 in advance.
[0058] In one embodiment, the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A rockburst prevention face structure for tunnel excavation, comprising a face for blasting and excavation during tunnel excavation, characterized in that: The surface shape of the rock burst prevention face is a convex surface opposite to the tunneling direction, and the surface shape of the convex surface is a special-shaped surface formed by the intersection of a sphere or an ellipsoid and the ground; The center of the convex surface is located above the ground; An annular groove is provided around the convex surface, and the annular groove has a smooth transition with the convex surface and the tunnel wall surface; During the construction of the rockburst-proof face structure, the rockburst-proof tunnel excavation method includes the following steps: S1: During tunnel excavation, the area with rock burst hazard in the surrounding rock mass and the section where the preset tunnel path overlaps form the rock burst hazard section, and the remaining sections on the preset tunnel path form the ordinary tunnel section. During the excavation of the ordinary tunnel section, conventional means are used for excavation; when conventional means are used for excavation, the tunnel face used is defined as the conventional tunnel face; S2: multiple boreholes are set along the edge of the conventional face in the direction of tunnel excavation, offset from the center of the conventional face, and the multiple boreholes form a slotting hole array and a blasting hole respectively; S3: Load the blasting tube in the blasting hole and detonate it after loading. After the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the first annular groove is formed at the edge of the conventional face. S4: flush the first annular groove with high pressure water for a certain period of time; S5: a plurality of drill holes are arranged in an array around the center of a circle on the conventional tunnel face, the bottoms of the plurality of drill holes are all against the first rock burst prevention tunnel face, and the plurality of drill holes respectively form a groove hole array and a blasting hole; S6: Load blasting tubes in the blasting holes and detonate them after loading. After the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the newly exposed surrounding rock mass forms the first rockburst prevention face. S7: a plurality of drill holes are arranged in an array around the center of the first rockburst prevention tunnel face, the bottoms of the plurality of drill holes are all against the second rockburst prevention tunnel face, and the plurality of drill holes respectively form a groove hole array and a blasting hole; S8: Load blasting tubes in the blasting holes and detonate them after loading. After the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and the newly exposed surrounding rock mass forms the second rockburst prevention face. S9: multiple boreholes are set along the edge of the second rock burst prevention face in the tunnel excavation direction, offset from the center of the conventional face, and the multiple boreholes respectively form a groove hole array and a blasting hole; S10: loading a blasting tube into the blasting hole, and detonating the tube after loading; after the explosion, the surrounding rock mass within the explosion range collapses toward the direction of the cut hole array, and a second annular groove is formed at the edge of the second rock burst prevention face; Repeat steps S4, S7, S8, S9 and S10, continue to advance forward using the excavation method of the anti-rockburst face until the rockburst potential section is passed, and then switch to conventional means for excavation.
2. The rockburst prevention face structure for tunnel excavation according to claim 1, characterized in that: The depth of the annular groove is greater than the blasting depth of the rock burst prevention face.
3. The rockburst prevention face structure for tunnel excavation according to claim 1, characterized in that: When high-pressure water is used to flush the first annular groove, the tunnel wall and the heading face are also flushed with high-pressure water.
4. The rockburst prevention face structure for tunnel excavation according to claim 1, characterized in that: The following steps are also included: During the excavation of rock burst-proof tunnels, water injection holes are opened on the tunnel wall at certain intervals, and high-pressure water is poured into the water injection holes.
5. The rockburst prevention face structure for tunnel excavation according to claim 2, characterized in that: The depth of the annular groove is more than twice the blasting depth of the rock burst prevention face.