A method, device, equipment and storage medium for high voltage distribution network reconstruction and loss reduction
Through the grid topology processing method and power flow analysis based on graph theory correlation, combined with the closed-loop design of the high-voltage distribution network, the branch structure of the high-voltage distribution network is optimized, solving the problem that the existing technology cannot adapt to the reconstruction of the high-voltage distribution network. , achieving effective reduction of losses in high-voltage distribution network.
Patent Information
- Application Number
- CN202210926679.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-03
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2042-08-03
AI Technical Summary
Existing distribution network reconstruction methods are mainly aimed at medium and low-voltage distribution networks, and cannot effectively adapt to the ring-shaped structure of high-voltage distribution networks, resulting in the inability to effectively reduce the losses of high-voltage distribution networks.
The grid topology processing method based on graph theory correlation is used, combined with the closed-loop design and open-loop operation characteristics of the high-voltage distribution network, and the equivalent topology structure diagram of the urban power grid is obtained for preprocessing to find optimizable links, and use power flow analysis and combination The branch switch method optimizes network loss and finds the optimal branch operation mode corresponding to the minimum network loss.
It achieves the reduction of losses in high-voltage distribution networks (especially 110kV and 35kV distribution lines), adapts to ring structures, has fast solution speed, and finds the optimal branch operation mode corresponding to the minimum network loss.
Smart Images

Figure CN115296294B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power grid technology, and in particular to a method, device, equipment and storage medium for high-voltage distribution network reconstruction and loss reduction. Background Art
[0002] The reconstruction of the distribution network is an important way for power grid companies to reduce losses and increase efficiency, and it also helps to establish a new low-carbon and environmentally friendly power system. The existing distribution network reconstruction method is mainly aimed at medium and low voltage distribution networks with a voltage level of 10kV. By closing and opening the radial medium and low voltage distribution network, the distribution network load is balanced and the grid loss is reduced. However, in the actual power grid, the available closing paths of the medium and low voltage distribution network are very limited. At the same time, due to the complex structure and numerous branches of the medium and low voltage distribution network, the equivalent topology established by the power grid company for the medium and low voltage distribution network is relatively rough, and it is difficult to truly represent the actual situation of the medium and low voltage distribution network.
[0003] Research and patents in the existing technology rarely involve the reconstruction of high-voltage distribution networks. This is because the high-voltage distribution network in the city is directly connected to the transmission ring network, and there are many loops in the structure itself, which does not meet the requirements of the radial structure and cannot be solved using the commonly used spanning tree theory. Summary of the invention
[0004] The technical problem to be solved by the present invention is that the existing distribution network reconstruction method is mainly aimed at medium and low voltage distribution networks with a voltage level of 10kV as the main voltage level. By closing and opening the ring of the radially operating medium and low voltage distribution network, the existing technical method is not suitable for the reconstruction and loss reduction of the high voltage distribution network containing a ring structure. The purpose of the present invention is to provide a method, device, equipment and storage medium for the reconstruction and loss reduction of a high voltage distribution network. The high voltage distribution network of the present invention is generally aimed at urban distribution networks with a voltage level less than 220kV and greater than 10kV. The present invention is combined with the main voltage levels of the domestic power grid. The proposed method mainly reduces the loss of the high voltage distribution network for 110kV and 35kV distribution lines. The solution speed is fast, and the optimal branch operation mode corresponding to the minimum network loss can be found in the end.
[0005] The present invention is achieved through the following technical solutions:
[0006] In a first aspect, the present invention provides a method for high-voltage distribution network reconstruction and loss reduction, the method comprising:
[0007] Obtain the equivalent topological structure diagram of the urban power grid;
[0008] According to the equivalent topological structure diagram of the urban power grid, the high-voltage distribution network is preprocessed to obtain the preprocessed topological nodes; the high-voltage distribution network refers to the urban distribution network with a voltage level less than 220 kV and greater than 10 kV;
[0009] According to the preprocessed topological nodes, combined with the open-loop operation characteristics of the closed-loop design of the high-voltage distribution network, a power grid topology processing method based on graph theory association is used to find optimizable links, and the optimizable links are used as optimizable structures;
[0010] According to the optimizable structure, power flow analysis is used to calculate the network loss of the entire urban distribution network; according to the network loss, the optimizable link is optimized by using a combined branch switching method, and the power supply path with the optimal network loss is obtained by combining branch disconnection methods of different links and comparing the network loss of each combination.
[0011] The working principle is: based on the existing distribution network reconstruction method, it mainly targets the medium and low voltage distribution network with a voltage level of 10kV. By closing and unclosing the radially operating medium and low voltage distribution network, the existing technical method is not suitable for the reconstruction and loss reduction of the high voltage distribution network with a ring structure. The present invention starts with the high voltage distribution network. On the one hand, since the high voltage distribution network adopts a closed-loop design and an open-loop operation concept during the construction process, there are many branches that can be operated in the high voltage distribution network. On the other hand, the power grid company is more accurate in the modeling and branch parameter statistics of the high voltage distribution network, which can reflect the actual operation of the high voltage distribution network. The present invention combines the main voltage levels of domestic power grids and designs a reconstruction loss reduction method for high-voltage distribution networks with ring structures. It mainly reduces the loss of high-voltage distribution networks for 110kV and 35kV distribution lines. Specifically: first, the topological nodes of 220kV and 500kV with higher voltage levels are used as power supply nodes. Combined with the characteristics of open-loop operation of closed-loop design of 110kV and 35kV high-voltage distribution networks, the power grid topology processing method based on graph theory association can be used to find 110kV and 35kV links with power supply nodes at both ends. Such links are used as optimizable structures, and a branch in each link is disconnected, and the link will still be able to ensure power supply; by combining the branch disconnection methods of different links and comparing the network loss of each combination, the optimal branch operation mode corresponding to the minimum network loss can be found. The method of the present invention is suitable for high-voltage distribution networks with ring structures, has a fast solution speed, and can eventually find the optimal branch operation mode corresponding to the minimum network loss.
[0012] Further, the pre-processing of the high-voltage distribution network includes: pre-processing of the 110kV high-voltage distribution network;
[0013] The pre-processing of the 110kV high-voltage distribution network is specifically as follows:
[0014] Delete all topological nodes except 110kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain a first topological node diagram; that is, only the topological nodes of 110kV voltage level, 220kV voltage level and 500kV voltage level are retained, and the topological nodes of other levels are deleted;
[0015] In the first topology node diagram, the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level are marked as first power supply nodes.
[0016] Furthermore, the pre-processing of the high-voltage distribution network further includes: pre-processing of the 35kV high-voltage distribution network;
[0017] The pre-processing of the 35kV high-voltage distribution network is specifically as follows:
[0018] Delete all topological nodes except 35kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain a second topological node diagram; that is, only the topological nodes of 35kV voltage level, 220kV voltage level and 500kV voltage level are retained, and the topological nodes of other levels are deleted;
[0019] In the second topology node diagram, the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level are marked as second power supply nodes.
[0020] Furthermore, the method of finding an optimizable link by using a power grid topology processing method based on graph theory association comprises: finding an optimizable link within a 110 kV voltage level by using a power grid topology processing method based on graph theory association;
[0021] The grid topology processing method based on graph theory association degree finds the optimizable links within the 110kV voltage level, specifically:
[0022] According to the preprocessed topological nodes, the topological nodes with a correlation degree of 1 in the 110kV voltage level are deleted, and a third topological node diagram is obtained by looping until there is no 110kV topological node with a correlation degree of 1 in the equivalent topological structure diagram of the urban power grid;
[0023] In the third topology node graph, delete the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level to obtain a fourth topology node graph;
[0024] In the fourth topology node graph, topology nodes with a correlation degree of 0 are deleted to obtain a first optimizable link.
[0025] Furthermore, the method of finding an optimizable link by using a power grid topology processing method based on graph theory association degree also includes: finding an optimizable link within a 35kV voltage level by using a power grid topology processing method based on graph theory association degree;
[0026] The grid topology processing method based on graph theory association degree finds the optimizable links within the 35kV voltage level, specifically:
[0027] According to the preprocessed topological nodes, the topological nodes with a correlation degree of 1 in the 35 kV voltage level are deleted, and a fifth topological node diagram is obtained by looping until there are no 35 kV topological nodes with a correlation degree of 1 in the urban power grid equivalent topological structure diagram;
[0028] In the fifth topology node graph, delete the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level to obtain a sixth topology node graph;
[0029] In the sixth topology node graph, topology nodes with a correlation degree of 0 are deleted to obtain a second optimizable link.
[0030] Furthermore, according to the network loss, a random optimization algorithm may be used to optimize the optimizable link;
[0031] The random optimization algorithm includes a particle swarm algorithm, a genetic algorithm or a simulated annealing algorithm.
[0032] Further, according to the network loss, the particle swarm algorithm is used to optimize the optimizable link, specifically:
[0033] The network loss is used as a fitness function, and the global optimal particle is found through the iterative formula of the random optimization algorithm itself, that is, the optimal branch switch combination is obtained.
[0034] In a second aspect, the present invention further provides a high-voltage distribution network reconstruction loss reduction device, which supports the high-voltage distribution network reconstruction loss reduction method; the device comprises:
[0035] An acquisition unit, used for acquiring an equivalent topological structure diagram of a city power grid;
[0036] A preprocessing unit, used for preprocessing the high-voltage distribution network according to the equivalent topological structure diagram of the urban power grid to obtain the preprocessed topological nodes; the high-voltage distribution network refers to the urban distribution network with a voltage level less than 220 kV and greater than 10 kV;
[0037] A topology processing unit is used to find an optimizable link based on the preprocessed topology nodes and the open-loop operation characteristics of the closed-loop design of the high-voltage distribution network, and to use the optimizable link as an optimizable structure by adopting a power grid topology processing method based on graph theory association;
[0038] A network loss calculation unit, used to calculate the network loss of the entire urban distribution network by using power flow analysis according to the optimizable structure;
[0039] The optimal power supply path optimization unit is used to optimize the optimizable link according to the network loss by adopting a combined branch switching method, and obtain a power supply path with optimal network loss by combining branch disconnection methods of different links and comparing the network loss of each combination.
[0040] In a third aspect, the present invention further provides a computer device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for reconstructing and reducing losses of a high-voltage distribution network when executing the computer program.
[0041] In a fourth aspect, the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method for reconstructing and reducing losses of a high-voltage distribution network is implemented.
[0042] Compared with the prior art, the present invention has the following advantages and beneficial effects:
[0043] The present invention discloses a method, device, equipment and storage medium for reconstructing and reducing losses of a high-voltage distribution network, which is mainly used for reducing losses of 110kV and 35kV distribution lines. Specifically, firstly, the topological nodes of 220kV and 500kV with higher voltage levels are used as power supply nodes, and the characteristics of open-loop operation of closed-loop design of 110kV and 35kV high-voltage distribution networks are combined, and the power grid topology processing method based on graph theory association is used to find 110kV and 35kV links with power supply nodes at both ends. Such links are used as optimizable structures, and a section of branches in each link is disconnected, and the link will still be able to ensure power supply; by combining the branch disconnection methods of different links and comparing the network loss of each combination, the optimal branch operation mode corresponding to the minimum network loss can be found. The method of the present invention is suitable for high-voltage distribution networks with ring structures, has a fast solution speed, and can eventually find the optimal branch operation mode corresponding to the minimum network loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0045] Figure 1 The present invention is a flow chart of a method for high-voltage distribution network reconstruction and loss reduction.
[0046] Figure 2 The present invention is a detailed flow chart of a method for high-voltage distribution network reconstruction and loss reduction.
[0047] Figure 3 This is an equivalent topological structure diagram of a city power grid according to an embodiment of the present invention.
[0048] Figure 4For the embodiment of the present invention, all topological node schematic diagrams except for the 110kV voltage level, 220kV voltage level and 500kV voltage level in the urban power grid equivalent topological structure diagram are deleted.
[0049] Figure 5 This is a schematic diagram of deleting topological nodes with a correlation degree of 1 within 110kV for the first time in an embodiment of the present invention.
[0050] Figure 6 This is a schematic diagram of deleting topological nodes with a correlation degree of 1 within 110kV in the second cycle according to an embodiment of the present invention.
[0051] Figure 7 This is a schematic diagram of deleting topological nodes with a correlation degree of 1 within 110kV for the third time in an embodiment of the present invention.
[0052] Figure 8 This is a schematic diagram of deleting topological nodes with a correlation degree of 1 within 110kV in the fourth cycle according to an embodiment of the present invention.
[0053] Fig. 9 For the embodiment of the present invention, the 220kV and 500kV nodes are deleted, and only the 110kV node is retained to obtain the following topology diagram.
[0054] Fig.10 The embodiment of the present invention deletes nodes with a correlation degree of 0 to obtain an optimizable structural diagram that can be operated.
[0055] Fig.11 It is a structural schematic diagram of a high-voltage distribution network reconstruction loss reduction device according to the present invention. DETAILED DESCRIPTION
[0056] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0057] Example 1
[0058] Based on the existing distribution network reconstruction method, it is mainly aimed at the medium and low voltage distribution network with a voltage level of 10kV. By closing and unclosing the radial medium and low voltage distribution network, the existing technical method is not suitable for the reconstruction and loss reduction of the high voltage distribution network with a ring structure. The present invention starts with the high voltage distribution network. On the one hand, since the high voltage distribution network adopts a closed loop design and an open loop operation idea during the construction process, there are many branches that can be operated in the high voltage distribution network. On the other hand, the power grid company is more accurate in modeling and branch parameter statistics of the high voltage distribution network, which can reflect the actual operation of the high voltage distribution network. In combination with the main voltage levels of the domestic power grid, the present invention designs a reconstruction and loss reduction method for high voltage distribution networks with ring structures. In combination with the actual situation, for safety reasons, urban 220kV and 500kV lines are generally not operated. Therefore, the high voltage distribution network referred to by the method of the present invention is generally aimed at urban distribution networks with voltage levels less than 220kV and greater than 10kV.
[0059] The present invention mainly reduces the loss of high-voltage distribution network for 110kV and 35kV distribution lines. Specifically: first, the topological nodes of 220kV and 500kV with higher voltage levels are used as power supply nodes. Combined with the characteristics of open-loop operation of closed-loop design of 110kV and 35kV high-voltage distribution networks, the power grid topology processing method based on graph theory association can be used to find 110kV and 35kV links with power supply nodes at both ends. Such links are used as optimizable structures, and a branch in each link is disconnected, and the link will still be able to ensure power supply; by combining the branch disconnection methods of different links and comparing the network loss of each combination, the optimal branch operation method corresponding to the minimum network loss can be found. The method of the present invention is suitable for high-voltage distribution networks with ring structures, has a fast solution speed, and can eventually find the optimal branch operation method corresponding to the minimum network loss.
[0060] like Figures 1 to 10 As shown, the present invention provides a method for high-voltage distribution network reconstruction and loss reduction, such as Figure 1 As shown, the method includes:
[0061] Obtain the equivalent topological structure diagram of the urban power grid;
[0062] According to the equivalent topological structure diagram of the urban power grid, the high-voltage distribution network is preprocessed to obtain the preprocessed topological nodes; the high-voltage distribution network refers to the urban distribution network with a voltage level less than 220 kV and greater than 10 kV;
[0063] According to the preprocessed topological nodes, combined with the open-loop operation characteristics of the closed-loop design of the high-voltage distribution network, a power grid topology processing method based on graph theory association is used to find optimizable links, and the optimizable links are used as optimizable structures;
[0064] According to the optimizable structure, power flow analysis is used to calculate the network loss of the entire urban distribution network; according to the network loss, the optimizable link is optimized by using a combined branch switching method, and the power supply path with the optimal network loss is obtained by combining branch disconnection methods of different links and comparing the network loss of each combination.
[0065] The method for representing the equivalent topological structure diagram of the urban power grid in the method of the present invention is a general distribution network structure representation method, that is, it includes node information, branch information, switch status, etc.
[0066] like Figure 2 As shown, during the specific implementation:
[0067] In the actual power grid topology, the topological nodes of 220kV and 500kV voltage levels need to be connected to the topological nodes of lower voltage levels to transfer energy from the high voltage grid to the low voltage grid. Therefore, the 220kV and 500kV topological nodes can be used as power supply nodes. In the nodes of lower voltage levels, there may be some 110kV and 35kV links that are both connected to the power supply nodes. Therefore, if one branch of such a link is disconnected, the link will still be able to guarantee power supply. The present invention mainly proposes a method for finding such an operable branch and an operation combination process to achieve distribution network reconstruction.
[0068] In order to find the optimizable links within the 110kV voltage level, firstly, the 110kV high-voltage distribution network is preprocessed to obtain the preprocessed topological nodes; secondly, the grid topology processing method based on graph theory association is used to find the optimizable links within the 110kV voltage level. Specifically:
[0069] First, delete all topological nodes except 110kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain the first topological node diagram; that is, only the topological nodes of 110kV voltage level, 220kV voltage level and 500kV voltage level are retained, and the topological nodes of other levels are deleted; in the first topological node diagram, the topological nodes of 220kV voltage level and the topological nodes of 500kV voltage level are marked as the first power supply nodes. Since the 110kV link with single-end power supply cannot be operated by branch disconnection, otherwise the power supply cannot be guaranteed, it is necessary to delete the 110kV link with single-end power supply. This can be combined with the concept of graph theory association. Within the 110kV voltage level, delete the topological nodes with an association degree of 1. By looping until there is no 110kV topological node with an association degree of 1 in the topology, it can be ensured that there is no 110kV link with single-end power supply in the topology. Furthermore, by deleting the topological nodes of the 220kV voltage level and the 500kV voltage level, some topologies consisting of only 110kV links and 110kV isolated scattered points can be obtained. In combination with engineering practice, although the two ends of the 110kV isolated scattered points obtained at this time are also connected to the first power supply node, the branches at both ends are generally equivalent branches of the transformer, and usually cannot be disconnected. In order to delete the 110kV isolated scattered points, combined with the concept of graph theory association, the nodes with an association of 0 are deleted, and an optimizable 110kV link can be obtained as the first optimizable link.
[0070] When searching for optimizable links within the 35kV voltage level, the method used is basically the same as that for 110kV, but the processing object is changed to 35kV. The processing flow is as follows:
[0071] Firstly, the 35kV high-voltage distribution network is preprocessed to obtain the preprocessed topological nodes; secondly, the grid topology processing method based on graph theory association is used to find the optimizable links within the 35kV voltage level. Specifically:
[0072] First, delete all topological nodes except 35kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain the second topological node diagram; that is, only the topological nodes of 35kV voltage level, 220kV voltage level and 500kV voltage level are retained, and the topological nodes of other levels are deleted; in the second topological node diagram, the topological nodes of 220kV voltage level and 500kV voltage level are marked as the second power supply nodes. Since the 35kV link with single-end power supply cannot perform branch disconnection operation, otherwise the power supply cannot be guaranteed, it is necessary to delete the 35kV link with single-end power supply. Here, the concept of graph theory association can be combined. Within the 35kV voltage level, the topological nodes with an association degree of 1 are deleted, and by looping until there are no 35kV nodes with an association degree of 1 in the topology, it can be guaranteed that there are no 35kV links with single-end power supply in the topology. Furthermore, by deleting the topological nodes of the 220kV voltage level and the 500kV voltage level, some topologies consisting of only 35kV links and 35kV isolated scattered points can be obtained. In combination with engineering practice, although the 35kV isolated scattered points obtained at this time are also connected to the power supply node at both ends, the branches at both ends are generally equivalent branches of the transformer, and usually cannot be disconnected. In order to delete the 110kV isolated scattered points, combined with the concept of graph theory association, the topological nodes with an association of 0 are deleted, and an optimizable 110kV link can be obtained as the second optimizable link.
[0073] The following uses the actual power grid data of a city as an example to show the process of finding links that can be optimized within 110kV:
[0074] The equivalent topological structure diagram of a city power grid is as follows: Figure 3 shown.
[0075] Only the topological nodes of the 110kV voltage level, the 220kV voltage level and the 500kV voltage level are retained, and the topological nodes of other levels are deleted. The topological nodes of the 220kV voltage level and the 500kV voltage level are marked as the first power supply nodes ( Figure 4 The black node in the middle), the topological node of 110kV voltage level ( Figure 4 medium grey nodes).
[0076] The 110kV link with single-end power supply cannot disconnect the branch circuit and is not used as an alternative branch for optimization. To delete the 110kV link with single-end power supply, just delete the nodes with a correlation degree of 1 in 110kV in a loop until there are no 110kV nodes with a correlation degree of 1. The result of the loop deletion is as follows: Figures 5 to 8 shown.
[0077] First loop: Loop and delete nodes with a correlation degree of 1 in 110kV, such as Figure 5 shown.
[0078] Second loop: Loop and delete nodes with a correlation degree of 1 in 110kV, such as Figure 6 shown.
[0079] The third cycle: Delete the nodes with a correlation degree of 1 in 110kV, such as Figure 7 shown.
[0080] Fourth cycle: Delete nodes with a correlation degree of 1 in 110kV, such as Figure 8 shown.
[0081] Delete the 220kV and 500kV topology nodes and keep only the 110kV topology node. The topology diagram is as follows: Fig. 9 shown.
[0082] By deleting nodes with a correlation degree of 0, we can obtain alternative links that can be operated, such as Fig.10 shown.
[0083] according to Fig.10 The alternative links in the grid are used to obtain two optimizable structures, namely two 110kV links. Each of the above links is connected to a 220kV or 500kV node at both ends. The power flow can be changed by disconnecting one connection in each link. Furthermore, when the power flow of the entire power grid changes, the network loss of the power grid may change. When looking for optimizable links within the 35kV voltage level, the above process is also followed.
[0084] In order to determine the optimal power supply path corresponding to the minimum network loss, when there are fewer operable structures and the amount of calculation is small, the traversal method can be used. Taking the above two structures as an example, disconnect a branch in the first structure (assuming it is 97-530), and then disconnect a branch in the second structure (assuming it is 165-1174), use the power flow analysis to calculate the network loss of the entire urban power grid, and record the network loss value. Further, restore the connection of the two disconnected branches, recombining the disconnected branches of each structure, such as branches 530-575 and branches 165-1174, perform power flow analysis and record the network loss value. After traversing all possible branch operations, find the branch operation corresponding to the lowest network loss, that is, the optimal power supply path corresponding to the optimal network loss is obtained.
[0085] It is worth noting that during the grid reconstruction process, the stability of the grid should be considered at the same time and used as a constraint condition for the sub-optimization problem. If the branch cannot be operated or the power flow convergence fails in the actual project, this combination method is not considered as a potential reconstruction method.
[0086] In addition, a random optimization algorithm can be used to combine operable branches, thereby reducing the amount of calculation and optimization time, especially when the number of operable structures is large. The following takes the particle swarm optimization algorithm as an example, combined with the above two optimizable structures. The first structure contains 5 lines, that is, 5 branch disconnection operations that can be tried. The first structure contains 2 lines, that is, 2 branch disconnection results that can be tried. Therefore, when applying the particle swarm algorithm, this problem requires 2 particles, corresponding to two operable structures. The first particle contains 5 dimensions, corresponding to 5 branch disconnection operations that can be tried, and the second particle contains 2 dimensions, corresponding to 2 branch disconnection operations that can be tried. Using the network loss as the fitness function, through the iterative formula of the particle swarm algorithm itself, the global optimal particle can be found in the end, and the optimal branch switch combination can be obtained.
[0087] When processing 35kV lines, since 35kV lines and 110kV lines have similar characteristics, the proposed algorithm can also be used to obtain several optimizable structures within the 35kV voltage level. Finally, the 35kV operable structure and the 110kV optimizable structure can be combined to perform branch circuit disconnection operations, and the methods used can also be traversal methods and random optimization methods. It is worth noting that the random optimization algorithm proposed in the present invention is a commonly used algorithm, including particle swarm algorithm, genetic algorithm, simulated annealing algorithm, etc. The algorithm used in the present invention is not limited to a specific algorithm type. The basic idea is to optimize the operation of each substructure by equivalent to a dimension of the solution, so as to achieve the purpose of improving the solution speed.
[0088] Example 2
[0089] like Fig.11 As shown, the difference between this embodiment and embodiment 1 is that this embodiment provides a high-voltage distribution network reconstruction loss reduction device, which supports a high-voltage distribution network reconstruction loss reduction method described in embodiment 1; the device includes:
[0090] An acquisition unit, used for acquiring an equivalent topological structure diagram of a city power grid;
[0091] A preprocessing unit, used for preprocessing the high-voltage distribution network according to the equivalent topological structure diagram of the urban power grid to obtain the preprocessed topological nodes; the high-voltage distribution network refers to the urban distribution network with a voltage level less than 220 kV and greater than 10 kV;
[0092] A topology processing unit is used to find an optimizable link based on the preprocessed topology nodes and the open-loop operation characteristics of the closed-loop design of the high-voltage distribution network, and to use the optimizable link as an optimizable structure by adopting a power grid topology processing method based on graph theory association;
[0093] A network loss calculation unit, used to calculate the network loss of the entire urban distribution network by using power flow analysis according to the optimizable structure;
[0094] The optimal power supply path optimization unit is used to optimize the optimizable link according to the network loss by adopting a combined branch switching method, and obtain a power supply path with optimal network loss by combining branch disconnection methods of different links and comparing the network loss of each combination.
[0095] The execution process of each unit can be performed according to the process steps of a high-voltage distribution network reconstruction loss reduction method described in Example 1, and will not be described one by one in this embodiment.
[0096] At the same time, the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method for reconstructing and reducing losses of a high-voltage distribution network when executing the computer program.
[0097] At the same time, the present invention also provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, it implements the method for reconstructing and reducing losses of a high-voltage distribution network.
[0098] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0099] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0100] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0101] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0102] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for reducing losses by reconfiguring a high-voltage distribution network, characterized in that: The method includes: Obtain the equivalent topological structure diagram of the urban power grid; According to the equivalent topological structure diagram of the urban power grid, the high-voltage distribution network is preprocessed to obtain the preprocessed topological nodes; the high-voltage distribution network refers to the urban distribution network with a voltage level less than 220 kV and greater than 10 kV; According to the preprocessed topological nodes, combined with the open-loop operation characteristics of the closed-loop design of the high-voltage distribution network, a power grid topology processing method based on graph theory association is used to find optimizable links, and the optimizable links are used as optimizable structures; According to the optimizable structure, the network loss of the entire urban distribution network is calculated by power flow analysis; according to the network loss, the optimizable link is optimized by a combined branch switch method, and the power supply path with the best network loss is obtained by combining branch disconnection modes of different links and comparing the network loss of each combination; The pre-processing of the high-voltage distribution network includes: pre-processing the 110kV high-voltage distribution network; The pre-processing of the 110kV high-voltage distribution network is specifically as follows: Delete all topological nodes except 110kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain a first topological node diagram; In the first topology node diagram, the topology node of the 220 kV voltage level and the topology node of the 500 kV voltage level are marked as first power supply nodes; The pre-processing of the high-voltage distribution network also includes: pre-processing of the 35kV high-voltage distribution network; The pre-processing of the 35kV high-voltage distribution network is specifically as follows: Delete all topological nodes except 35kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain a second topological node diagram; In the second topology node diagram, the topology node of the 220 kV voltage level and the topology node of the 500 kV voltage level are marked as second power supply nodes; The method of finding an optimizable link by using a power grid topology processing method based on graph theory association comprises: finding an optimizable link within a 110kV voltage level by using a power grid topology processing method based on graph theory association; The grid topology processing method based on graph theory association degree finds the optimizable links within the 110kV voltage level, specifically: According to the preprocessed topological nodes, the topological nodes with a correlation degree of 1 in the 110kV voltage level are deleted, and a third topological node diagram is obtained by looping until there is no 110kV topological node with a correlation degree of 1 in the equivalent topological structure diagram of the urban power grid; In the third topology node graph, delete the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level to obtain a fourth topology node graph; In the fourth topology node graph, topology nodes with a correlation degree of 0 are deleted to obtain a first optimizable link.
2. A high-voltage distribution network reconstruction loss reduction method according to claim 1, characterized in that: The method of finding an optimizable link by using a power grid topology processing method based on graph theory relevance also includes: finding an optimizable link within a 35kV voltage level by using a power grid topology processing method based on graph theory relevance; The grid topology processing method based on graph theory association degree finds the optimizable links within the 35kV voltage level, specifically: According to the preprocessed topological nodes, the topological nodes with a correlation degree of 1 in the 35 kV voltage level are deleted, and a fifth topological node diagram is obtained by looping until there are no 35 kV topological nodes with a correlation degree of 1 in the urban power grid equivalent topological structure diagram; In the fifth topology node graph, delete the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level to obtain a sixth topology node graph; In the sixth topology node graph, topology nodes with a correlation degree of 0 are deleted to obtain a second optimizable link.
3. A high-voltage distribution network reconstruction loss reduction method according to claim 1, characterized in that: According to the network loss, optimizing the optimizable link using a random optimization algorithm; The random optimization algorithm includes a particle swarm algorithm, a genetic algorithm or a simulated annealing algorithm.
4. A high-voltage distribution network reconstruction loss reduction method according to claim 3, characterized in that: According to the network loss, the particle swarm algorithm is used to optimize the optimizable link, specifically: The network loss is used as a fitness function, and the global optimal particle is found through the iterative formula of the random optimization algorithm itself, that is, the optimal branch switch combination is obtained.
5. A high-voltage distribution network reconstruction loss reduction device, characterized in that: The device supports a high-voltage distribution network reconstruction loss reduction method as described in any one of claims 1 to 4; the device comprises: An acquisition unit, used for acquiring an equivalent topological structure diagram of a city power grid; A preprocessing unit, used for preprocessing the high-voltage distribution network according to the equivalent topological structure diagram of the urban power grid to obtain the preprocessed topological nodes; the high-voltage distribution network refers to the urban distribution network with a voltage level less than 220 kV and greater than 10 kV; A topology processing unit is used to find an optimizable link based on the preprocessed topology nodes and the open-loop operation characteristics of the closed-loop design of the high-voltage distribution network, and to use the optimizable link as an optimizable structure by adopting a power grid topology processing method based on graph theory association; A network loss calculation unit, used to calculate the network loss of the entire urban distribution network by using power flow analysis according to the optimizable structure; An optimal power supply path optimization unit, configured to optimize the optimizable link by using a combined branch switch method according to the network loss, and obtain a power supply path with the optimal network loss by combining branch disconnection modes of different links and comparing the network loss of each combination; The pre-processing of the high-voltage distribution network includes: pre-processing the 110kV high-voltage distribution network; The pre-processing of the 110kV high-voltage distribution network is specifically as follows: Delete all topological nodes except 110kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain a first topological node diagram; In the first topology node diagram, the topology node of the 220 kV voltage level and the topology node of the 500 kV voltage level are marked as first power supply nodes; The pre-processing of the high-voltage distribution network also includes: pre-processing of the 35kV high-voltage distribution network; The pre-processing of the 35kV high-voltage distribution network is specifically as follows: Delete all topological nodes except 35kV voltage level, 220kV voltage level and 500kV voltage level in the equivalent topological structure diagram of the urban power grid to obtain a second topological node diagram; In the second topology node diagram, the topology node of the 220 kV voltage level and the topology node of the 500 kV voltage level are marked as second power supply nodes; The method of finding an optimizable link by using a power grid topology processing method based on graph theory association comprises: finding an optimizable link within a 110kV voltage level by using a power grid topology processing method based on graph theory association; The grid topology processing method based on graph theory association degree finds the optimizable links within the 110kV voltage level, specifically: According to the preprocessed topological nodes, the topological nodes with a correlation degree of 1 in the 110kV voltage level are deleted, and a third topological node diagram is obtained by looping until there is no 110kV topological node with a correlation degree of 1 in the equivalent topological structure diagram of the urban power grid; In the third topology node graph, delete the topology nodes of the 220 kV voltage level and the topology nodes of the 500 kV voltage level to obtain a fourth topology node graph; In the fourth topology node graph, topology nodes with a correlation degree of 0 are deleted to obtain a first optimizable link.
6. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method for reconstructing and reducing losses of a high-voltage distribution network as described in any one of claims 1 to 4 is implemented.
7. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, a high-voltage distribution network reconstruction loss reduction method as described in any one of claims 1 to 4 is implemented.