A high-activity potassium fluoride finished product tank and tank replacement method

By designing the adjustable tank structure and gas replacement system of high-active potassium fluoride finished tanks, the problems of air contact and toxic gas leakage in potassium fluoride storage are solved, and a safer and more efficient storage and replacement process is achieved.

CN118618758BActive Publication Date: 2024-11-08INNER MONGOLIA XINGHAN FUDU CHEM CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411094072.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-08-09
Publication Date
2024-11-08
Estimated Expiration
2044-08-09

AI Technical Summary

Technical Problem

During the storage process of potassium fluoride, the prior art is difficult to effectively isolate the air, causing potassium fluoride to react with air and deteriorate, and may produce toxic gases, affecting storage safety and material quality.

Method used

A highly active potassium fluoride finished product tank is designed, adopting an adjustable tank structure, spiral blades and feeding rack, combined with a gas replacement net and solenoid valve, and the gas in the tank is realized through the rotation of nitrogen filling and agitation shaft. The material replacement and turnover reduces contact between potassium fluoride and air, and realizes the lifting and connection of the tank through the hydraulic rod and the rolling wheel.

Benefits of technology

It effectively reduces the contact between potassium fluoride and air, improves storage quality, ensures dryness and sealing in the tank, reduces the risk of toxic gas leakage, and simplifies the tank replacement process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118618758B_ABST
    Figure CN118618758B_ABST
Patent Text Reader

Abstract

The invention discloses a high-activity potassium fluoride finished product tank and a tank body replacement method, which effectively achieves the purpose of having a good protective effect on potassium fluoride. The method comprises a tank body and a support seat, wherein a sliding block is provided on the upper side of the support seat, and the sliding block on the right side of the tank body has a driving mechanism; a stirring shaft is provided inside the tank body, a spiral blade is provided on the outer side of the stirring shaft, a feeding rack is provided inside the tank body, a dehumidification pipe is provided on one side of the feeding rack, a sealing plate is provided on the upper side of the tank body, a feeding opening is provided on the lower side of the tank body, and a connecting plate and a connecting semi-ring are provided on the lower side of the tank body; the method has a novel structure, an ingenious conception, and is simple and convenient to operate, effectively achieves the purpose of facilitating the transfer and replacement of materials, adds a function of facilitating the maintenance of the tank body by staff, adds a function of stirring the materials inside the tank body, realizes the function of fully dehumidifying the inside of the tank body, and adds a function of replacing the gas inside the tank body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of potassium fluoride storage, and relates to a high-activity potassium fluoride finished product tank and a tank body replacement method. Background Art

[0002] With the global climate change and the increasing awareness of environmental protection, all walks of life are actively seeking low-carbon and environmentally friendly production processes to reduce the impact on the environment. Potassium fluoride, as an important inorganic salt, is widely used in many fields such as medicine, pesticides, electronics, glass manufacturing and aluminum processing.

[0003] When storing finished potassium fluoride products, it is necessary to replace the storage tanks of potassium fluoride regularly, that is, to replace the storage tanks, and clean and inspect the replaced tanks to increase the safety performance of potassium fluoride storage. Since potassium fluoride easily reacts with water vapor and carbon dioxide in the air to deteriorate, and also produces toxic gases such as hydrogen fluoride, it needs to be isolated from the air during storage, and the inside of the tank must be kept dry. Such requirements also make the potassium fluoride subject to greater restrictions when replacing the tank. Not only is it easy for potassium fluoride to come into contact with the air during replacement to cause pollution, but it is also easy for toxic gases to leak and endanger the lives of workers. Therefore, a high-activity potassium fluoride finished product tank and a tank replacement method are needed to facilitate replacement. Summary of the invention

[0004] In view of the above problems, the present invention proposes a high-activity potassium fluoride finished product tank and a tank replacement method, which well solves the problems in the prior art.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0006] A high-activity potassium fluoride finished product tank, comprising a tank body and a support seat, wherein two height-adjustable sliding blocks are arranged on the upper side of the support seat, and the left and right sides of the tank body are rotatably connected to the corresponding sliding blocks respectively, and the sliding block on the right side of the tank body is provided with a driving mechanism for adjusting the angle of the tank body;

[0007] A rotatable stirring shaft is provided inside the tank body, a spiral blade is fixedly connected to the outside of the stirring shaft, a feeding rack is provided inside the tank body and can rotate with the stirring shaft, the feeding rack is a spiral structure, the spiral rotation direction of the feeding rack is the same as the rotation direction of the spiral blade, and a plurality of dehumidification pipes are fixedly connected to one side of the feeding rack close to the stirring shaft;

[0008] A displacement opening is provided on the upper side of the tank body, and a sealing plate is connected to the upper side of the tank body by bolts to seal the displacement opening. A feeding opening is provided on the lower side of the tank body, and a connecting plate and a connecting half ring are rotatably connected to the lower side of the tank body, and the connecting plate and the connecting half ring cooperate with each other to seal the feeding opening.

[0009] A first replacement net is provided on the upper side of the sealing plate, and a second replacement net is provided on the lower side of the connecting plate. The first replacement net and the second replacement net cooperate with each other to replace the gas in the tank.

[0010] Preferably, two sliding sleeves corresponding to the sliding blocks are fixedly connected to the upper side of the support seat, each of the sliding blocks is plugged into the corresponding sliding sleeve, and each of the sliding blocks is fixedly connected to a hydraulic rod on a side away from the tank body.

[0011] Preferably, a second ladder is fixedly connected to the rear side of the sliding block on the left side of the tank body, a first ladder is fixedly connected to the upper side of the support seat at a position corresponding to the second ladder, and the first ladder and the second ladder are staggered.

[0012] Preferably, a first motor is fixedly connected to the upper side of the sealing plate, a connecting sleeve is coaxially rotatably connected to the middle part of the sealing plate, the upper side of the connecting sleeve is fixedly connected to the output shaft of the first motor, and the lower side of the connecting sleeve cooperates with the upper side of the stirring shaft.

[0013] Preferably, a plurality of connecting rods are fixedly connected to the outer side of the stirring shaft, and each connecting rod is fixedly connected to the corresponding dehumidification pipe on the side away from the stirring shaft. A dehumidification hole is provided at the position corresponding to each dehumidification pipe on the feeding rack and connected to the interior of the dehumidification pipe. A sealing cover is threadedly connected to the position where each dehumidification pipe is connected to the feeding rack, and a breathable net is provided on the upper and lower sides of each dehumidification pipe.

[0014] Preferably, a protective shell is fixedly connected to the upper part of the sliding block on the right side of the tank body, the right side of the tank body is rotatably connected to the sliding block through the protective shell, and the driving mechanism is placed inside the protective shell;

[0015] The driving mechanism includes a second motor fixedly connected to the protective shell, a worm is rotatably connected inside the protective shell, the lower side of the worm is fixedly connected to the output shaft of the second motor, a worm wheel is meshed with the rear side of the worm, an electromagnetic clutch is coaxially fixedly connected to the middle part of the worm wheel, and the end of the electromagnetic clutch away from the worm wheel is connected to the tank body.

[0016] Preferably, a boss is provided on the lower side of the feeding opening, and connecting holes are provided on the left and right sides of the connecting plate and the connecting half ring.

[0017] Preferably, a solenoid valve is provided in the middle of each of the first replacement net and the second replacement net, and a plurality of rolling wheels are provided at the bottom of the support seat.

[0018] In addition, the present invention also provides a tank body replacement method for a high-activity potassium fluoride finished product tank, comprising the following steps:

[0019] Step S1: Processing of the tank to be replaced and discharged:

[0020] Connect the first replacement network to the gas delivery pipe, connect the second replacement network to the gas processor, open the electromagnetic valves in the middle of the first replacement network and the second replacement network, and slowly fill nitrogen into the interior of the tank through the first replacement network at a filling speed of 10-20L / min to replace the gas inside the tank;

[0021] Step S2, treatment of potassium fluoride to be discharged:

[0022] Calculate according to the nitrogen filling speed in step S1, when the volume of the filled nitrogen reaches 50%-70% of the total volume of the tank body, start the first motor, so that the first motor drives the stirring shaft to rotate clockwise through the connecting sleeve, and the potassium fluoride in the tank body is turned over and scattered through the spiral blades and the dehumidification pipe. When the volume of the filled nitrogen reaches 110%-130% of the total volume of the tank body, close the solenoid valve, the first motor and the nitrogen filling, and wait for use;

[0023] Step S3: Processing of the tank to be replaced:

[0024] Fill the dehumidification pipe with a proper amount of desiccant, connect the first replacement network to the gas delivery pipe, connect the second replacement network to the gas processor, open the electromagnetic valves in the middle of the first replacement network and the second replacement network, and slowly fill nitrogen into the tank body through the first replacement network at a filling speed of 10-20L / min to replace the gas inside the tank body. When the volume of the filled nitrogen reaches 100%-110% of the total volume of the tank body, close the electromagnetic valve, the first motor and the nitrogen filling, and wait for use;

[0025] Step S4: connecting two tanks:

[0026] The tank containing potassium fluoride to be used in step S2 is rotated by an angle A, wherein the range of A is 110°-140°;

[0027] The tank body to be fed in step S3 is rotated at an angle B so that A=B+180°, and the tank body is raised by a hydraulic rod so that the two feeding openings are on the same horizontal plane;

[0028] The feeding opening of the tank to be fed and the feeding opening of the tank to be discharged are brought close to each other by means of the rolling wheel and the hydraulic rod, the electromagnetic valves on the two tanks are started again, and nitrogen is filled into the two tanks through the two first displacement nets at a filling rate of 30-40 L / min. After opening the two connecting plates, the two tanks are connected and fixed by the connecting half rings on the two tanks. After the connection is completed, all the electromagnetic valves and nitrogen filling are closed;

[0029] Step S5: Tank replacement:

[0030] After closing the two electromagnetic clutches, control the hydraulic rod to raise the tank to be discharged and lower the tank to be fed, so that potassium fluoride enters the tank to be fed under the action of gravity, and at the same time start the first motor of the tank to be discharged, so that the connecting sleeve drives the stirring shaft to rotate counterclockwise, and all the potassium fluoride is fed into the tank to be fed through the feeding rack. After the potassium fluoride is completely transferred, start the two electromagnetic clutches and seal the feeding opening of the tank after feeding through the connecting plate;

[0031] Step S6: Processing of the tank after discharging:

[0032] Open the connecting plate of the tank after discharge, place it in an open and ventilated place for more than one day, then rinse it with plenty of water, then remove the dehumidifier inside the dehumidification pipe, check whether the tank is damaged, and place it in a dry and ventilated place for standby use;

[0033] Step S7, processing of the tank body after feeding:

[0034] After starting the second motor to reset the tank body, steps S1 and S2 are repeated again to complete the replacement.

[0035] Compared with the prior art, the present invention has the following beneficial effects:

[0036] 1. The present invention has a tank body that can rotate and rise and fall, and can connect two tank bodies for discharging and feeding materials when the tank bodies are replaced, thereby reducing the probability of damage to material quality caused by contact between potassium fluoride and air during the replacement process.

[0037] 2. The present invention has a first displacement net and a second displacement net, which can displace the gas inside the tank, thereby improving the storage quality of potassium fluoride.

[0038] 3. The present invention has a boss, a connecting plate and a connecting half ring, which can not only seal the feeding opening through the mutual cooperation of the connecting half ring and the connecting plate, but also fix and seal the bosses on two different tank bodies to each other through the connecting half rings on the two different tank bodies, which is convenient for the staff to operate.

[0039] 4. The present invention has a feeding rack and a spiral blade that can rotate together, which can not only turn the material inside the tank body up and down through the spiral blade, but also can discharge the material inside the tank body through the feeding rack. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic diagram of the overall structure of the present invention.

[0041] Figure 2 It is a structural schematic diagram of the replacement state in the present invention.

[0042] Figure 3 It is a schematic diagram of the internal structure of the tank body in the present invention.

[0043] Figure 4 It is a structural schematic diagram of the connecting plate in the present invention.

[0044] Figure 5 For the present invention Figure 4 A partial enlarged schematic diagram of area A in the middle.

[0045] In the figure: 1. tank body; 2. support seat; 3. sliding block; 4. driving mechanism; 5. stirring shaft; 6. spiral blade; 7. feeding rack; 8. dehumidification pipe; 9. displacement opening; 10. sealing plate; 11. feeding opening; 12. connecting plate; 13. connecting half ring; 14. first displacement net; 15. second displacement net; 16. sliding sleeve; 17. hydraulic rod; 18. second ladder; 19. first ladder; 20. first motor; 21. connecting sleeve; 22. connecting rod; 23. dehumidification hole; 24. sealing cover; 25. breathable net; 26. protective shell; 27. second motor; 28. worm; 29. ​​worm wheel; 30. electromagnetic clutch; 31. boss; 32. connecting hole; 33. electromagnetic valve; 34. rolling wheel. DETAILED DESCRIPTION

[0046] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] The following is combined with Figure 1-Figure 5 The specific implementation modes of the present invention are described in further detail.

[0048] Depend on Figure 1-Figure 5The present invention comprises a tank body 1 and a support seat 2. In order to achieve a good protective effect on potassium fluoride, two height-adjustable sliding blocks 3 are arranged on the upper side of the support seat 2. The left and right sides of the tank body 1 are rotatably connected to the corresponding sliding blocks 3 respectively. The sliding block 3 on the right side of the tank body 1 is provided with a driving mechanism 4 for adjusting the angle of the tank body 1.

[0049] A rotatable stirring shaft 5 is provided inside the tank body 1, and a spiral blade 6 is fixedly connected to the outer side of the stirring shaft 5. A feeding rack 7 that can rotate with the stirring shaft 5 is provided inside the tank body 1. The feeding rack 7 is a spiral structure, and the spiral rotation direction of the feeding rack 7 is the same as the rotation direction of the spiral blade 6. A plurality of dehumidification pipes 8 are fixedly connected to the side of the feeding rack 7 close to the stirring shaft 5;

[0050] A replacement opening 9 is provided on the upper side of the tank body 1, and a sealing plate 10 is connected to the upper side of the tank body 1 by bolts to seal the replacement opening 9. A feeding opening 11 is provided on the lower side of the tank body 1, and a connecting plate 12 and a connecting half ring 13 are rotatably connected to the lower side of the tank body 1. The connecting plate 12 and the connecting half ring 13 cooperate with each other to seal the feeding opening 11.

[0051] A first displacement net 14 is provided on the upper side of the sealing plate 10, and a second displacement net 15 is provided on the lower side of the connecting plate 12. The first displacement net 14 and the second displacement net 15 cooperate with each other to displace the gas in the tank body 1.

[0052] It should be noted that the upper part of the tank body 1 is cylindrical and the lower part is conical, which is convenient for the storage and transportation of materials. The feeding rack 7 is in contact with the inner wall of the bottom of the tank body 1. When the stirring shaft 5 drives the spiral blade 6 to rotate clockwise, the material at the middle axis position of the tank body 1 will be transported upward. At the same time, the material can be horizontally stirred through the dehumidification pipe 8 so that the material can be fully mixed.

[0053] Furthermore, in order to adjust the height of the tank body 1 so as to facilitate the transfer and replacement of materials, two sliding sleeves 16 corresponding to the sliding blocks 3 are fixedly connected to the upper side of the support seat 2, and each of the sliding blocks 3 is plugged into the corresponding sliding sleeve 16. A hydraulic rod 17 is fixedly connected to the side of each sliding block 3 away from the tank body 1, and the lower side of each hydraulic rod 17 is fixedly connected to the support seat 2;

[0054] It should be noted that the hydraulic rod 17 is an electric hydraulic push rod, which is a prior art and will not be described in detail here. Furthermore, a controller is provided on the upper side of the support seat 2. The controller is a prior art, such as a PLC controller. Each of the hydraulic rods 17 is electrically connected to the corresponding controller, and the height of the hydraulic rod 17 can be controlled by the controller.

[0055] Furthermore, in order to facilitate the maintenance of the tank body 1 by the staff, a second ladder 18 is fixedly connected to the rear side of the sliding block 3 on the left side of the tank body 1, and a first ladder 19 is fixedly connected to the upper side of the support seat 2 corresponding to the position of the second ladder 18, and the first ladder 19 and the second ladder 18 are staggered left and right;

[0056] It should be noted that when the sliding block 3 rises under the action of the hydraulic rod 17, the second ladder 18 will move upward relative to the first ladder 19. At this time, the staff can still climb to the upper side of the tank body 1 through the first ladder 19 and the second ladder 18 to inspect the tank body 1.

[0057] Furthermore, in order to facilitate the stirring of the material inside the tank body 1, a first motor 20 is fixedly connected to the upper side of the sealing plate 10, and a connecting sleeve 21 is coaxially rotatably connected to the middle part of the sealing plate 10, the upper side of the connecting sleeve 21 is fixedly connected to the output shaft of the first motor 20, and the lower side of the connecting sleeve 21 cooperates with the upper side of the stirring shaft 5;

[0058] It should be noted that the upper side of the connecting sleeve 21 is cylindrical and fixedly connected to the output shaft of the first motor 20 , the lower side of the connecting sleeve 21 is shaped like a hexagonal sleeve, and the upper side of the stirring shaft 5 is hexagonal and can cooperate with the lower side of the connecting sleeve 21 .

[0059] Furthermore, in order to achieve the purpose of fully dehumidifying the interior of the tank body 1 and thus improving the storage quality of potassium fluoride, a plurality of connecting rods 22 are fixedly connected to the outer side of the stirring shaft 5, and each connecting rod 22 is fixedly connected to the corresponding dehumidification pipe 8 on the side away from the stirring shaft 5. A dehumidification hole 23 is opened at the position corresponding to each dehumidification pipe 8 on the feeding rack 7 and is connected to the interior of the dehumidification pipe 8. A sealing cover 24 is threadedly connected to the position where each dehumidification pipe 8 is connected to the feeding rack 7, and a breathable net 25 is provided on the upper and lower sides of each dehumidification pipe 8;

[0060] It should be further explained that a hexagonal groove is provided in the middle of each sealing cover 24, and the sealing cover 24 can be opened by cooperating with a tool in the hexagonal groove. Before the device is used, the stirring shaft 5 together with the dehumidification tube 8 and the feeding rack 7 can be taken out, and then each sealing cover 24 can be opened, and then a proper amount of dehumidification agent can be filled in each dehumidification tube 8. During the storage of potassium fluoride, the dehumidification agent can absorb the moisture inside the tank body 1 through the breathable net 25, thereby reducing the probability of potassium fluoride reacting with water in the air and deteriorating.

[0061] Furthermore, in order to adjust the angle of the tank body 1, a protective shell 26 is fixedly connected to the upper part of the sliding block 3 on the right side of the tank body 1, and the right side of the tank body 1 is rotatably connected to the sliding block 3 through the protective shell 26, and the driving mechanism 4 is placed inside the protective shell 26;

[0062] The driving mechanism 4 includes a second motor 27 fixedly connected to the protective shell 26, a worm 28 is rotatably connected inside the protective shell 26, the lower side of the worm 28 is fixedly connected to the output shaft of the second motor 27, a worm wheel 29 is meshed with the rear side of the worm 28, an electromagnetic clutch 30 is coaxially fixedly connected to the middle of the worm wheel 29, and the end of the electromagnetic clutch 30 away from the worm wheel 29 is connected to the tank body 1;

[0063] It needs to be further explained that the second motor 27 is a servo motor, which is a prior art and will not be described in detail here. The second motor 27 is electrically connected to the controller. The electromagnetic clutch 30 is a prior art, such as an electrical multi-plate clutch with a model of stromag. The electromagnetic clutch 30 is electrically connected to the controller, and the connection relationship between the worm gear 29 and the tank body 1 can be controlled by the controller. A rotating block is provided on each side of the tank body 1, and the tank body 1 is rotatably connected to each sliding block 3 through each rotating block. When the electromagnetic clutch 30 is powered on and closed, the worm gear 29 and the tank body 1 cannot rotate relative to each other. At this time, when the second motor 27 is started, the second motor 27 drives the worm gear 29 to rotate through the worm 28, thereby adjusting the angle of the tank body 1. When the electromagnetic clutch 30 is powered off, the tank body 1 can rotate relative to the sliding block 3.

[0064] Furthermore, in order to facilitate sealing of the tank body 1, a boss 31 is provided at the lower side of the feeding opening 11, and the boss 31 is annular, and connecting holes 32 are provided on both the left and right sides of the connecting plate 12 and the connecting half ring 13;

[0065] It should be noted that a sleeve is provided on the upper side of both the connecting plate 12 and the connecting half-ring 13. A sleeve connecting column is fixedly connected to each of the left and right sides of the tank body 1. The connecting plate 12 and the connecting half-ring 13 are rotatably connected to the tank body 1 through the corresponding sleeves. The cross-section of the connecting half-ring 13 is in the shape of "匸". The structure of the connecting plate 12 is that a circular plate is fixedly connected on the basis of the connecting half-ring 13, and the radius of the circular plate is the same as the outer diameter of the lower end surface of the boss 31. During use, the corresponding connecting holes 32 can be connected and fixed by bolts. At this time, the circular plate seals the lower end surface of the boss 31, and the tank body 1 is in a sealed state.

[0066] Further, for the purpose of facilitating the replacement of the gas in the tank body 1, an electromagnetic valve 33 is provided in the middle of each of the first replacement net 14 and the second replacement net 15. A plurality of rolling wheels 34 are provided at the bottom of the support seat 2. The electromagnetic valve 33 is a prior art, such as the electromagnetic valve 33 for gas with the model ZCRB, which will not be described in detail here. Each electromagnetic valve 33 is electrically connected to the controller, and its connection relationship can be controlled through the controller. Both the first replacement net 14 and the second replacement net 15 are tubular structures. When the electromagnetic valve 33 is closed, it is in a sealed state and gas exchange cannot be carried out.

[0067] It should be noted that when the tank body 1 is filled with materials, the self-weight of the whole device is relatively large, and it will not roll on its own on the ground with a slope less than 5° without human force.

[0068] In addition, the controller is integrated with a power module, which can convert the external power supply voltage to supply power to the various components of the device (such as the hydraulic rod 17, the first motor 20, the second motor 27, etc.).

[0069] In addition, the present invention also discloses a method for replacing the tank body 1 of a high-activity potassium fluoride finished product tank.

[0070] The method for replacing the tank body of the high-activity potassium fluoride finished product tank includes the following steps:

[0071] Step S1, treatment of the tank body 1 to be replaced for discharging:

[0072] Connect the first replacement net 14 to the gas delivery pipe, connect the second replacement net 15 to the gas processor. After opening the electromagnetic valves 33 in the middle of the first replacement net 14 and the second replacement net 15 through the controller, slowly fill nitrogen into the inside of the tank body 1 through the first replacement net 14. At this time, the tank body 1 is in the upright state, that is, the first motor 20 is located on the upper side of the tank body 1, and the inflation speed is 10 - 20 L / min to replace the gas inside the tank body 1.

[0073] It should be noted that, since the density of nitrogen is lower than that of air, when nitrogen is slowly filled into the tank body 1, the air inside the tank body 1 will be squeezed downward and discharged from the second displacement net 15. The gas processor is used for harmless absorption or treatment of gases such as hydrogen fluoride;

[0074] Step S2, treatment of potassium fluoride to be discharged:

[0075] Calculate according to the nitrogen filling speed in step S1, when the volume of the filled nitrogen reaches 50%-70% of the total volume of the tank body 1, start the first motor 20, so that the first motor 20 drives the stirring shaft 5 to rotate clockwise through the connecting sleeve 21, and the potassium fluoride inside the tank body 1 is turned over and scattered through the spiral blades 6 and the dehumidification pipe 8, so that the dehumidifier inside the dehumidification pipe 8 can fully absorb the water vapor inside the tank body 1, and at the same time, the gas between the materials can be dispersed, so that it is convenient to discharge it from the tank body 1, and when the volume of the filled nitrogen reaches 110%-130% of the total volume of the tank body 1, close the solenoid valve 33, the first motor 20 and the nitrogen filling, and wait for use;

[0076] In addition, if the storage time of potassium fluoride is not too long and only the gas inside it needs to be replaced, steps S1 and S2 can be performed only on the tank 1 containing potassium fluoride.

[0077] Step S3: Processing of the tank body 1 to be replaced with feed:

[0078] Fill the dehumidification pipe 8 with a proper amount of desiccant, connect the first replacement network 14 to the gas delivery pipe, connect the second replacement network 15 to the gas processor, open the first replacement network 14 and the electromagnetic valve 33 in the middle of the second replacement network 15, and slowly fill nitrogen into the tank body 1 through the first replacement network 14, with a filling speed of 10-20L / min, to replace the gas inside the tank body 1. When the volume of the filled nitrogen reaches 100%-110% of the total volume of the tank body 1, close the electromagnetic valve 33, the first motor 20 and the nitrogen filling, and wait for use. This step is to remove the air inside the tank body 1 to be replaced;

[0079] Step S4: connecting two tanks 1:

[0080] The tank body 1 containing potassium fluoride to be used in step S2 is rotated by an angle A, wherein the range of A is 110°-140°, and at this time, the feeding opening 11 of the tank body 1 containing the material is located on the upper side of the rotating shaft of the tank body 1;

[0081] The tank body 1 to be fed in step S3 is rotated by an angle B, so that A=B+180°, and the tank body 1 is raised by the hydraulic rod 17 so that the two feeding openings 11 are in the same horizontal plane. At this time, the axes of the two tank bodies 1 are parallel to each other and the two feeding openings 11 are opposite to each other, so that the two tank bodies 1 can be connected by mutual cooperation;

[0082] After the two tank bodies 1 are brought close to each other by the rolling wheel 34, the hydraulic rod 17 is started to make the feeding opening 11 of the tank body 1 to be fed and the feeding opening 11 of the tank body 1 to be discharged close to each other, the solenoid valves 33 on the two tank bodies 1 are started again, and nitrogen is filled into the two tank bodies 1 through the two first displacement nets 14, and the filling speed is 30-40L / min, and the connecting half rings 13 and the connecting plates 12 of the two tank bodies 1 are opened. At this time, the connecting half rings 13 of the two tank bodies 1 are respectively located on the upper and lower sides of the feeding opening 11, and the connecting holes 32 on the two connecting plates 12 are fixed to each other by bolts. At this time, the two connecting half rings 13 cooperate with each other to fix the two bosses 31. After the connection is completed, all the solenoid valves 33 and nitrogen filling are closed. When the two tank bodies 1 are connected, the probability of the gas in the tank body 1 being polluted by the outside air can be reduced by quickly filling with nitrogen, thereby reducing the risk of potassium fluoride deterioration;

[0083] Step S5: Replacement of tank body 1:

[0084] After closing the two electromagnetic clutches 30, the hydraulic rod 17 is controlled to raise the tank body 1 to be discharged and lower the tank body 1 to be fed, so that potassium fluoride enters the tank body 1 to be fed under the action of gravity, and at the same time, the first motor 20 of the tank body 1 to be discharged is started, so that the connecting sleeve 21 drives the stirring shaft 5 to rotate counterclockwise, and the potassium fluoride is completely fed into the tank body 1 to be fed through the feeding rack 7. After the potassium fluoride is completely transferred, the two electromagnetic clutches 30 are started, the two connecting half rings 13 are opened to release the mating, and the feeding opening 11 of the tank body 1 after feeding is sealed with the connecting plate 12 through the connecting half ring 13;

[0085] Step S6, treatment of the tank body 1 after discharging:

[0086] After opening the connecting plate 12 and the connecting half ring 13 of the tank body 1 after the material is discharged, place it in an open and ventilated place for more than one day, then rinse it with a large amount of clean water, then open the replacement opening 9, take out the stirring shaft 5, the spiral blade 6, the feeding rack 7 and the dehumidification pipe 8 from the tank body 1, remove the dehumidifier inside the dehumidification pipe 8, check whether the tank body 1 is damaged, and then place it in a dry and ventilated place for standby use;

[0087] Step S7, processing of the tank body 1 after feeding:

[0088] After the second motor 27 is started to reset the tank body 1 , steps S1 and S2 are repeated again to complete the replacement of the tank body 1 .

[0089] The present invention has a novel structure, an ingenious conception, and is simple and convenient to operate. Through the present design, the purpose of having a good protective effect on potassium fluoride is effectively achieved, the purpose of facilitating the transfer and replacement of materials is achieved, a function of facilitating the maintenance of the tank body 1 by the staff is added, a function of stirring the materials inside the tank body 1 is added, a function of fully dehumidifying the inside of the tank body 1 is realized, the purpose of being able to adjust the angle of the tank body 1 is achieved, the tank body 1 is conveniently sealed, and a function of replacing the gas in the tank body 1 is added.

[0090] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for replacing a tank body of a high-activity potassium fluoride finished product tank, characterized in that: The following steps are involved: Step S1: Processing of the tank to be replaced and discharged: Connect the first replacement network to the gas delivery pipe, connect the second replacement network to the gas processor, open the electromagnetic valves in the middle of the first replacement network and the second replacement network, and slowly fill nitrogen into the interior of the tank through the first replacement network at a filling speed of 10-20L / min to replace the gas inside the tank; Step S2, treatment of potassium fluoride to be discharged: Calculate according to the nitrogen filling speed in step S1, when the volume of the filled nitrogen reaches 50%-70% of the total volume of the tank, start the first motor, so that the first motor drives the stirring shaft to rotate clockwise through the connecting sleeve, and the potassium fluoride in the tank is turned over and scattered through the spiral blades and the dehumidification pipe. When the volume of the filled nitrogen reaches 110%-130% of the total volume of the tank, close the solenoid valve, the first motor and the nitrogen filling, and wait for use; Step S3: Processing of the tank to be replaced: Fill the dehumidification pipe with a proper amount of desiccant, connect the first displacement network to the gas delivery pipe, connect the second displacement network to the gas processor, open the electromagnetic valve in the middle of the first displacement network and the second displacement network, and slowly fill nitrogen into the tank through the first displacement network at a speed of 10-20L / min to replace the gas inside the tank. When the volume of nitrogen filled reaches 100%-110% of the total volume of the tank, close the electromagnetic valve, the first motor and the nitrogen filling, and wait for use; Step S4: connecting two tanks: The tank containing potassium fluoride to be used in step S2 is rotated by an angle A, wherein the range of A is 110°-140°; The tank to be fed in step S3 is rotated at an angle B so that A=B+180°, and the tank is raised by a hydraulic rod so that the two feeding openings are on the same horizontal plane; The feeding opening of the tank to be fed and the feeding opening of the tank to be discharged are brought close to each other by means of the rolling wheel and the hydraulic rod, the electromagnetic valves on the two tanks are started again, and nitrogen is filled into the two tanks through the two first displacement nets at a filling rate of 30-40L / min. After opening the two connecting plates, the two tanks are connected and fixed by the connecting half rings on the two tanks. After the connection is completed, all electromagnetic valves and nitrogen filling are closed; Step S5: Tank replacement: After closing the two electromagnetic clutches, control the hydraulic rod to raise the tank to be discharged and lower the tank to be fed, so that potassium fluoride enters the tank to be fed under the action of gravity, and at the same time start the first motor of the tank to be discharged, so that the connecting sleeve drives the stirring shaft to rotate counterclockwise, and all the potassium fluoride is fed into the tank to be fed through the feeding rack. After the potassium fluoride is completely transferred, start the two electromagnetic clutches and seal the feeding opening of the tank after feeding through the connecting plate; Step S6: Processing of the tank after discharging: Open the connecting plate of the tank after discharge, place it in an open and ventilated place for more than one day, then rinse it with plenty of water, then remove the dehumidifier inside the dehumidification pipe, check whether the tank is damaged, and place it in a dry and ventilated place for standby use; Step S7, processing of the tank body after feeding: After starting the second motor to reset the tank, repeat steps S1 and S2 to complete the replacement; A support seat is provided on the lower side of the tank body, and two height-adjustable sliding blocks are provided on the upper side of the support seat. The left and right sides of the tank body are rotatably connected to the corresponding sliding blocks respectively, and the sliding block on the right side of the tank body is provided with a driving mechanism for adjusting the angle of the tank body; A rotatable stirring shaft is provided inside the tank body, a spiral blade is fixedly connected to the outside of the stirring shaft, a feeding rack is provided inside the tank body and can rotate with the stirring shaft, the feeding rack is a spiral structure, the spiral rotation direction of the feeding rack is the same as the rotation direction of the spiral blade, and a plurality of dehumidification pipes are fixedly connected to one side of the feeding rack close to the stirring shaft; A displacement opening is provided on the upper side of the tank body, and a sealing plate is connected to the upper side of the tank body by bolts to seal the displacement opening. A feeding opening is provided on the lower side of the tank body, and a connecting plate and a connecting half ring are rotatably connected to the lower side of the tank body, and the connecting plate and the connecting half ring cooperate with each other to seal the feeding opening. A first replacement net is provided on the upper side of the sealing plate, and a second replacement net is provided on the lower side of the connecting plate. The first replacement net and the second replacement net cooperate with each other to replace the gas in the tank.

2. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 1, characterized in that: Two sliding sleeves corresponding to the sliding blocks are fixedly connected to the upper side of the support seat, each of the sliding blocks is plugged into the corresponding sliding sleeve, and a hydraulic rod is fixedly connected to a side of each sliding block away from the tank body.

3. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 2, characterized in that: A second ladder is fixedly connected to the rear side of the sliding block on the left side of the tank body, and a first ladder is fixedly connected to the upper side of the support seat at a position corresponding to the second ladder, and the first ladder and the second ladder are arranged alternately.

4. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 3, characterized in that: A first motor is fixedly connected to the upper side of the sealing plate, a connecting sleeve is coaxially rotatably connected to the middle of the sealing plate, the upper side of the connecting sleeve is fixedly connected to the output shaft of the first motor, and the lower side of the connecting sleeve cooperates with the upper side of the stirring shaft.

5. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 4, characterized in that: A plurality of connecting rods are fixedly connected to the outer side of the stirring shaft, and a side of each connecting rod away from the stirring shaft is fixedly connected to the corresponding dehumidification pipe. A dehumidification hole is provided at a position corresponding to each dehumidification pipe on the feeding rack and connected to the interior of the dehumidification pipe. A sealing cover is threadedly connected to the position where each dehumidification pipe is connected to the feeding rack, and a breathable net is provided on the upper and lower sides of each dehumidification pipe.

6. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 5, characterized in that: A protective shell is fixedly connected to the upper part of the sliding block on the right side of the tank body, the right side of the tank body is rotatably connected to the sliding block through the protective shell, and the driving mechanism is placed inside the protective shell; The driving mechanism includes a second motor fixedly connected to the protective shell, a worm is rotatably connected inside the protective shell, the lower side of the worm is fixedly connected to the output shaft of the second motor, a worm wheel is meshed with the rear side of the worm, an electromagnetic clutch is coaxially fixedly connected to the middle part of the worm wheel, and the end of the electromagnetic clutch away from the worm wheel is connected to the tank body.

7. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 6, characterized in that: A boss is provided at the lower side of the feeding opening, and connection holes are provided on the left and right sides of the connection plate and the connection half ring.

8. The method for replacing a tank body of a high-activity potassium fluoride finished product tank according to claim 7, characterized in that: A solenoid valve is provided in the middle of each of the first replacement net and the second replacement net, and a plurality of rolling wheels are provided at the bottom of the support seat.