Construction method of large-section concrete batter post
By arranging guide steel cages in the steel cages of large-section concrete inclined columns and utilizing the characteristics of self-compacting concrete, the problem that the vibrator rod cannot reach the bottom of the column is solved, the quality of the concrete and the safety of the support system are improved, and efficient construction results are achieved. .
Patent Information
- Application Number
- CN202410770043.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-14
- Publication Date
- 2024-10-01
AI Technical Summary
During the construction of large-section concrete inclined columns, the vibrator rod was unable to reach the bottom of the column during concrete pouring, resulting in concrete quality problems and reduced safety of the support system.
A guide steel cage is installed in the inclined column steel cage, and the vibrator rod is lifted through the guide steel cage. Combined with the high fluidity of self-compacting concrete and the characteristics of no vibration, it ensures the quality of concrete pouring and the safety of the support system.
It effectively avoids the problem of the vibrator rod being stuck by the steel cage, improves the compactness of the concrete and the safety of the support system, and ensures the forming quality and stability of the inclined column.
Smart Images

Figure CN118728077A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a construction method of a large-section concrete inclined column. Background Art
[0002] The spatial positioning accuracy of large-section concrete inclined columns is high, and the load during construction is large and concentrated, which places extremely high demands on measurement and layout, steel bar positioning, formwork, support frame support and concrete pouring. In particular, the concrete that has not yet initially solidified during the concrete pouring process has some characteristics of liquid, which will produce a large horizontal pressure on the inclined column and cause the bottom side formwork on the outside of the inclined column to deform. This deformation accumulates with the increase of column height and forces the support frame to be unbalanced, greatly reducing the safety of the support system. At the same time, it will also cause the concrete column to deform or even crack and become scrapped. The current conventional construction method is to set a tie device on one or both sides of the inclined column to ensure the inclined state of the inclined column and the formwork until the concrete solidifies. For example, the patent with publication number CN115306146A discloses a large-section independent inclined column construction method based on BIM technology, which uses tie wire ropes on both sides of the inclined column to fix the formwork. For another example, the patent with publication number CN106854941A discloses a construction method for inclined beams and inclined columns of a large-section stand, which supports the formwork by setting an inclined cable on one side of the inclined column and a return inclined rod on the other side.
[0003] The construction of inclined column concrete is the key point of inclined column construction, and the quality of concrete construction directly determines the quality of the inclined column after forming. However, due to the dense steel bars and large cross-section of large-section inclined columns, when pouring concrete for large-section inclined columns, the vibrator cannot reach the bottom of the column when inserted directly, and the steel cage is easily stuck during the lifting process, resulting in inadequate concrete vibration, resulting in quality problems such as roughness and voids in the concrete. Summary of the invention
[0004] In view of the above-mentioned problems in the prior art, the present application proposes a construction method for large-section concrete inclined columns, which ensures the quality of the inclined column concrete and the safety of the support system.
[0005] The present invention provides a construction method for a large-section concrete inclined column, comprising the following steps:
[0006] Set up the first supporting frame on the outside of the inclined column to be constructed;
[0007] A first template is supported at one end of the first supporting frame body facing the inclined column to be constructed;
[0008] Performing the tying construction of the inclined column reinforcement cage at the end of the first template facing away from the first support frame, and synchronously placing the prefabricated guide reinforcement cage in the inclined column reinforcement cage;
[0009] A second template, a third template and a fourth template are supported on the periphery of the inclined column reinforcement cage to form a template system equipped with an inclined column casting cavity; wherein the second template is arranged opposite to the first template; the inclined column reinforcement cage and the guide reinforcement cage are both located in the inclined column casting cavity;
[0010] A second support frame is set up at one end of the second template facing away from the first template; and the second support frame is connected to the first support frame to form a support system;
[0011] Pouring concrete into the inclined column casting cavity, placing a vibrating rod in the guide steel cage, and lifting the vibrating rod synchronously with the concrete pouring;
[0012] After the concrete in the inclined column casting cavity solidifies and reaches the designed strength, the formwork system and the support system are removed.
[0013] Furthermore, the concrete poured into the inclined column pouring cavity is self-compacting concrete.
[0014] Self-compacting concrete is used instead of ordinary concrete to give full play to the characteristics of self-compacting concrete, such as high fluidity, no segregation, no water seepage, no vibration, and the ability to completely rely on its own weight to level and fill the inclined column casting cavity and wrap the inclined column steel cage. This avoids the problems of the vibrating rod being unable to reach the bottom of the column when vibrating the inclined column concrete, being easily stuck by the steel cage during the lifting process, and the concrete being vibrated in a non-dense manner. It eliminates the extra pressure on the formwork system during concrete vibration, which not only ensures the quality of the inclined column concrete, but also ensures the safety of the support system.
[0015] Furthermore, the steps of pouring concrete into the inclined column pouring cavity, placing a vibrating rod in the guide steel cage, and lifting the vibrating rod synchronously with the concrete pouring include:
[0016] Extending a concrete delivery pump pipe into the inclined column casting cavity and locating the concrete delivery pump pipe between the guide steel cage and the formwork system;
[0017] Insert the vibrating rod into the guide steel cage so that the vibrating rod is lower than the end of the concrete delivery pump pipe;
[0018] While pouring concrete into the inclined column pouring cavity through the concrete delivery pump pipe, start the vibrating rod to vibrate the concrete in the inclined column pouring cavity;
[0019] The concrete delivery pump pipe is lifted, and the vibrating rod is lifted synchronously until the concrete in the inclined column casting cavity is poured completely.
[0020] Furthermore, the step of lifting the concrete delivery pump pipe and synchronously lifting the vibrating rod until the concrete in the inclined column casting cavity is poured includes:
[0021] Divide the inclined column into n sections from bottom to top; determine the target height of the concrete delivery pump pipe and the vibrator rod based on the length of each section;
[0022] Synchronously lifting the concrete delivery pump pipe and the vibrating rod to a first target height;
[0023] Stop concrete pouring and vibration to complete the concrete pouring construction of the first section of the inclined column;
[0024] When the concrete of the first section of the inclined column reaches the initial setting strength, continue pouring and vibrating the concrete, and simultaneously lift the concrete delivery pump pipe and the vibrating rod to a second target height;
[0025] Stop concrete pouring and vibration, and complete the concrete pouring construction of the second section of the inclined column;
[0026] The above steps are repeated until the concrete pouring construction of the nth section of the inclined column is completed.
[0027] The pouring quality of inclined column concrete is improved by segmented pouring and synchronous vibration of inclined columns.
[0028] Furthermore, the method also includes the following steps: sleeve a prefabricated sleeve on the outside of the guide steel cage; the sleeve is located between the guide steel cage and the inclined column steel cage; the end of the concrete delivery pump pipe is higher than the upper end of the sleeve; the lower end of the sleeve is higher than the end of the vibrating rod; and while lifting the vibrating rod, the sleeve is also lifted synchronously.
[0029] Furthermore, the middle portion of the sleeve extends toward an end close to the guide steel cage to form a closed portion; the upper end and the lower end of the sleeve respectively extend toward an end away from the guide steel cage to form a flared portion.
[0030] The expanded part at the upper end of the sleeve receives the concrete, increasing the amount of concrete entering the sleeve; the closed part gathers the concrete in the sleeve and guides the concrete in the sleeve into the guide steel cage to avoid excessive height difference between the concrete in the guide steel cage and the inclined column steel cage; the expanded part at the lower end of the sleeve transmits vibration to the concrete outside it, improving the vibration efficiency and quality. Through the action of the sleeve, the concrete in the guide steel cage is vibrated densely and has stable quality. The guide steel cage and the concrete inside it serve as invisible reinforcement columns inside the inclined column, further improving the molding quality and stability of the inclined column.
[0031] Furthermore, a lifting rope is connected to the upper end of the sleeve, and a length mark is provided on the lifting rope, and the lifting height of the sleeve is determined based on the length mark.
[0032] The lifting height of the sleeve is determined by marking the length of the lifting rope, and since the sleeve, the vibrating rod and the concrete pump pipe are lifted synchronously, the lifting height of the vibrating rod and the concrete pump pipe can also be determined, thereby improving the construction efficiency of the segmented pouring and synchronous vibration of the inclined column.
[0033] Furthermore, the formwork system also includes back ribs supported on the end surfaces of the first formwork, the second formwork, the third formwork and the fourth formwork facing away from the inclined column casting cavity.
[0034] Furthermore, the inclined column steel cage includes an inner steel cage and an outer steel cage; the inner steel cage includes inner main bars and inner stirrups; the inner main bars are distributed around the guide steel cage; the inner stirrups surround and are connected to the outside of the inner main bars; the outer steel cage includes outer main bars and outer stirrups; the outer main bars are distributed around the inner steel cage; the outer stirrups surround and are connected to the outside of the outer main bars.
[0035] Furthermore, the guide steel cage includes connected guide main bars and guide stirrups; the guide stirrups are arranged at intervals along the length direction of the guide main bars, and the spacing between adjacent guide stirrups is smaller than the diameter of the vibrator.
[0036] The beneficial effects of the present invention include: by setting up a first support frame on the outside of the inclined column and a second support frame on the inside, and connecting the two as a whole, a stable support system is formed, thereby ensuring the structural safety and construction safety of the support system. By setting a guide steel cage inside the inclined column steel cage, and the length direction of the guide steel cage is consistent with the length direction of the inclined column steel cage, the vibrator is placed in the guide steel cage with a smaller mesh, and the vibrator can follow the guide steel cage to reach the bottom of the inclined column steel cage, and can be lifted along the guide steel cage without being stuck by the guide steel cage, thereby ensuring the quality of vibration and improving the construction efficiency. In addition, the guide steel cage is permanently retained in the inclined column, thereby improving the quality of the inclined column. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a side view structural schematic diagram of the first supporting frame supporting the formwork system of the construction method of the large-section concrete inclined column of the present invention.
[0038] Figure 2 for Figure 1 Schematic diagram of the locally enlarged structure of the template system.
[0039] Figure 3 It is a schematic cross-sectional view of a vibrating rod inserted into the inclined column casting cavity of the formwork system of the construction method of the present invention.
[0040] Figure 4 It is a schematic diagram of a partial three-dimensional structure in which a vibrating rod is inserted into a inclined column reinforcement cage of the construction method of the present invention.
[0041] Figure 5 for Figure 4 Schematic diagram of the structure in which a sleeve is arranged in the inclined column reinforcement cage.
[0042] In the figure: 1-first support frame; 2-inclined column reinforcement cage; 21-inner main reinforcement; 22-inner stirrups; 23-outer main reinforcement; 24-outer stirrups; 3-formwork system; 31-first formwork; 32-second formwork; 33-third formwork; 34-fourth formwork; 35-back rib; 4-guide reinforcement cage; 41-guide main reinforcement; 42-guide stirrups; 5-vibrator; 6-sleeve; 61-closing part; 62-expansion part; 63-suspension rope; 7-concrete delivery pump pipe. DETAILED DESCRIPTION
[0043] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0044] The construction method of the large-section concrete inclined column proposed by the present invention comprises the following steps:
[0045] Set up the first support frame on the outside of the inclined column to be constructed; Figure 1 As shown, the right side of the inclined column reinforcement cage 2 is the outer side of the inclined column to be constructed, and the left side of the inclined column reinforcement cage 2 is the inner side of the inclined column to be constructed. The first support frame 1 includes a full-height support frame and an inclined brace.
[0046] A first template 31 is supported at one end of the first support frame 1 facing the inclined column to be constructed.
[0047] like Figure 2 As shown, the inclined column reinforcement cage 2 is tied at one end of the first template 31 facing away from the first support frame 1, and the prefabricated guide reinforcement cage 4 is placed in the inclined column reinforcement cage 2 simultaneously. Figure 3 , Figure 4 As shown, the inclined column reinforcement cage 2 includes an inner reinforcement cage and an outer reinforcement cage; the inner reinforcement cage includes an inner main reinforcement 21 and an inner stirrup 22; the inner main reinforcement 21 is distributed around the guide reinforcement cage 4; the inner stirrup 22 surrounds and connects to the outer side of the inner main reinforcement 21; the outer reinforcement cage includes an outer main reinforcement 23 and an outer stirrup 24; the outer main reinforcement 23 is distributed around the inner reinforcement cage; the outer stirrup 24 surrounds and connects to the outer side of the outer main reinforcement 23. The guide reinforcement cage 4 includes connected guide main reinforcements 41 and guide stirrups 42; the guide stirrups 42 are arranged at intervals along the length direction of the guide main reinforcement 41, and the spacing between adjacent guide stirrups 42 is smaller than the diameter of the vibrator 5, so that the vibrator 5 will not penetrate into the gap between the guide stirrups 42 of the guide reinforcement cage 4 during the descent process.
[0048] The second formwork 32, the third formwork 33 and the fourth formwork 34 are supported on the periphery of the inclined column reinforcement cage 2 to form a formwork system 3 equipped with an inclined column casting cavity; wherein the second formwork 32 is arranged opposite to the first formwork 31, and the third formwork 33 is arranged opposite to the fourth formwork 34; the inclined column reinforcement cage 2 and the guide reinforcement cage 4 are both located in the inclined column casting cavity; the formwork system 3 also includes a back rib 35 supported on the end surface of the first formwork 31, the second formwork 32, the third formwork 33 and the fourth formwork 34 facing away from the inclined column casting cavity. The formwork system 3 also includes a tie device, which can use tie screws. The first formwork 31 and the second formwork 32 are tied together by a plurality of tie screws, and the third formwork 33 and the fourth formwork 34 are tied together by a plurality of tie screws.
[0049] A second support frame is set up at one end of the second template 32 facing away from the first template 31; the second support frame is connected to the first support frame 1 to form a support system; wherein the first support frame 1 and the second support frame can adopt a disc-type full-frame structure. The first support frame 1 and the second support frame are connected as an integral structure to improve the support effect of the support system.
[0050] Pour concrete into the inclined column casting cavity, place the vibrating rod 5 in the guide steel cage 4, and lift the vibrating rod 5 synchronously with the concrete pouring. Among them, the concrete poured in the inclined column casting cavity is self-compacting concrete. Self-compacting concrete is used instead of ordinary concrete to give full play to the characteristics of self-compacting concrete, such as high fluidity, no segregation, no water seepage, no vibration, and can completely rely on its own weight to level and fill the inclined column casting cavity and wrap the inclined column steel cage 2. It avoids the problems that the vibrating rod 5 cannot reach the bottom of the column when vibrating the inclined column concrete, the lifting process is easily stuck by the steel cage, and the concrete is not vibrated densely, and eliminates the extra pressure on the formwork system 3 during concrete vibration, which not only ensures the quality of the inclined column concrete, but also ensures the safety of the support system.
[0051] Specifically, the concrete delivery pump pipe 7 is extended into the inclined column casting cavity and is located between the guide steel cage 4 and the formwork system 3;
[0052] Insert the vibrating rod 5 into the guide steel cage 4, so that the vibrating rod 5 is lower than the end of the concrete delivery pump pipe 7;
[0053] While pouring concrete into the inclined column casting cavity through the concrete delivery pump pipe 7, start the vibrating rod 5 to vibrate the concrete in the inclined column casting cavity;
[0054] Lift the concrete delivery pump pipe 7, and simultaneously lift the vibrating rod 5 until the concrete in the inclined column casting cavity is poured. The inclined column is divided into n sections from bottom to top; the target height of the concrete delivery pump pipe 7 and the vibrating rod 5 is determined based on the length of each section; the concrete delivery pump pipe 7 and the vibrating rod 5 are lifted synchronously to the first target height; concrete pouring and vibration are stopped to complete the concrete pouring construction of the first section of the inclined column; when the concrete of the first section of the inclined column reaches the initial setting strength, the concrete pouring and vibration are continued, and the concrete delivery pump pipe 7 and the vibrating rod 5 are lifted synchronously to the second target height; concrete pouring and vibration are stopped to complete the concrete pouring construction of the second section of the inclined column; the above steps are repeated until the concrete pouring construction of the nth section of the inclined column is completed. For example, in this embodiment, if the inclined column is divided into 4 sections, the pouring of the inclined column is carried out in 4 times.
[0055] like Figure 5 As shown, when pouring each section of the inclined column, the prefabricated sleeve 6 is sleeved on the outside of the guide steel cage 4; the sleeve 6 is located between the guide steel cage 4 and the inclined column steel cage 2; the end of the concrete delivery pump pipe 7 is higher than the upper end of the sleeve 6; the lower end of the sleeve 6 is higher than the end of the vibrator 5; while lifting the vibrator 5, the sleeve 6 is also lifted synchronously. The middle part of the sleeve 6 extends toward the end close to the guide steel cage 4 to form a closing part 61; the upper and lower ends of the sleeve 6 extend toward the end away from the guide steel cage 4 to form a flaring part 62. The upper end of the sleeve 6 is connected to a suspension rope 63, and a length mark is set on the suspension rope 63. Based on the length mark, the lifting height of the sleeve 6 is determined. The expanded portion 62 at the upper end of the sleeve 6 receives the concrete, and the amount of concrete entering the sleeve 6 is increased; the closed portion 61 gathers the concrete in the sleeve 6, and guides the concrete in the sleeve 6 into the guide steel cage 4, so as to avoid excessive height difference between the concrete in the guide steel cage 4 and the inclined column steel cage 2; the expanded portion 62 at the lower end of the sleeve 6 transmits vibration to the concrete outside it, so as to improve the vibration efficiency and vibration quality. Through the action of the sleeve 6, the concrete in the guide steel cage 4 is vibrated densely, and the quality is stable. The guide steel cage 4 and the concrete inside it serve as invisible reinforcement columns inside the inclined column, which further improves the molding quality and stability of the inclined column.
[0056] After the concrete in the inclined column casting cavity solidifies and reaches the designed strength, the formwork system 3 and the support system are removed.
[0057] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A construction method for large-section concrete inclined columns, characterized in that: The following steps are involved: Set up the first supporting frame on the outside of the inclined column to be constructed; A first template is supported at one end of the first supporting frame body facing the inclined column to be constructed; Performing the tying construction of the inclined column reinforcement cage at the end of the first template facing away from the first support frame, and synchronously placing the prefabricated guide reinforcement cage in the inclined column reinforcement cage; A second template, a third template and a fourth template are supported on the periphery of the inclined column reinforcement cage to form a template system equipped with an inclined column casting cavity; wherein the second template is arranged opposite to the first template; the inclined column reinforcement cage and the guide reinforcement cage are both located in the inclined column casting cavity; A second support frame is set up at one end of the second template facing away from the first template; and the second support frame is connected to the first support frame to form a support system; Pouring concrete into the inclined column casting cavity, placing a vibrating rod in the guide steel cage, and lifting the vibrating rod synchronously with the concrete pouring; After the concrete in the inclined column casting cavity solidifies and reaches the designed strength, the formwork system and the support system are removed.
2. The construction method of a large-section concrete inclined column according to claim 1, characterized in that: The concrete poured into the inclined column pouring cavity is self-compacting concrete.
3. The construction method of a large-section concrete inclined column according to claim 1, characterized in that: The steps of pouring concrete into the inclined column pouring cavity, placing a vibrating rod in the guide steel cage, and lifting the vibrating rod synchronously with the concrete pouring include: Extending a concrete delivery pump pipe into the inclined column casting cavity and locating the pipe between the guide steel cage and the formwork system; Insert the vibrating rod into the guide steel cage so that the vibrating rod is lower than the end of the concrete delivery pump pipe; While pouring concrete into the inclined column pouring cavity through the concrete delivery pump pipe, start the vibrating rod to vibrate the concrete in the inclined column pouring cavity; The concrete delivery pump pipe is lifted, and the vibrating rod is lifted synchronously until the concrete in the inclined column casting cavity is poured completely.
4. The construction method of a large-section concrete inclined column according to claim 3 is characterized in that: The step of lifting the concrete delivery pump pipe and synchronously lifting the vibrating rod until the concrete in the inclined column casting cavity is poured completely comprises: Divide the inclined column into n sections from bottom to top; determine the target height of the concrete delivery pump pipe and the vibrator rod based on the length of each section; Synchronously lifting the concrete delivery pump pipe and the vibrating rod to a first target height; Stop concrete pouring and vibration to complete the concrete pouring construction of the first section of the inclined column; When the concrete of the first section of the inclined column reaches the initial setting strength, continue pouring and vibrating the concrete, and simultaneously lift the concrete delivery pump pipe and the vibrating rod to a second target height; Stop concrete pouring and vibration, and complete the concrete pouring construction of the second section of the inclined column; The above steps are repeated until the concrete pouring construction of the nth section of the inclined column is completed.
5. The construction method of a large-section concrete inclined column according to claim 4, characterized in that: The method also includes the following steps: sleeve a prefabricated sleeve onto the outside of the guide steel cage; the sleeve is located between the guide steel cage and the inclined column steel cage; the end of the concrete delivery pump pipe is higher than the upper end of the sleeve; the lower end of the sleeve is higher than the end of the vibrating rod; and while lifting the vibrating rod, the sleeve is also lifted synchronously.
6. The construction method of a large-section concrete inclined column according to claim 5, characterized in that: The middle part of the sleeve extends toward one end close to the guide steel cage to form a closed portion; the upper end and the lower end of the sleeve extend toward one end away from the guide steel cage to form a flared portion.
7. The construction method of a large-section concrete inclined column according to claim 5, characterized in that: The upper end of the sleeve is connected with a lifting rope, on which a length mark is provided, and based on the length mark, the lifting height of the sleeve is determined.
8. The construction method of a large-section concrete inclined column according to claim 1, characterized in that: The template system also includes back ribs supported on the end surfaces of the first template, the second template, the third template and the fourth template facing away from the inclined column casting cavity.
9. The construction method of a large-section concrete inclined column according to claim 1, characterized in that: The inclined column steel cage includes an inner steel cage and an outer steel cage; the inner steel cage includes inner main bars and inner stirrups; the inner main bars are distributed around the guide steel cage; the inner stirrups surround and are connected to the outside of the inner main bars; the outer steel cage includes outer main bars and outer stirrups; the outer main bars are distributed around the inner steel cage; the outer stirrups surround and are connected to the outside of the outer main bars.
10. The construction method of a large-section concrete inclined column according to claim 9, characterized in that: The guide steel cage comprises connected guide main bars and guide stirrups; the guide stirrups are arranged at intervals along the length direction of the guide main bars, and the spacing between adjacent guide stirrups is smaller than the diameter of the vibrator.