A multifunctional surveying device
By designing a compact chain storage frame and silt recovery components, the existing survey equipment is solved, portability and high-precision river surveys are achieved, and silt collection efficiency is improved.
Patent Information
- Application Number
- CN202411328919.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-09-24
AI Technical Summary
The existing river ditches depth surveying equipment for land surveying and mapping requires multiple counterweight parts, resulting in a large overall weight and large volume, which is inconvenient to carry. In addition, the large addition of counterweight parts increases production and procurement costs, and the scale line The weight it bears is too large and requires the use of high-strength materials, which increases the cost.
A multifunctional survey device was designed, using a chain storage frame and a winding frame, which drives the chain release through the retracting and discharge motor to drive the exploration cone downward detection. The sensor calculates the depth of the river channel, which is compact in structure and easy to carry, and passes the articulated shaft and The limit block realizes the rotation lock of the chain, avoids the swing of the exploration cone and the bending of the chain, and improves the accuracy; at the same time, the silt recovery components in the exploration cone form negative pressure through the blocking ring and the suction piston ring, improving the silt collection efficiency.
The compact structure of the device is realized, which is easy to operate and carry, reduces production and procurement costs, and improves surveying accuracy and sludge collection efficiency.
Smart Images

Figure CN118857246B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of surveying technology, in particular to a multifunctional surveying device. Background Art
[0002] The work of water conservancy engineering survey includes: survey for river management and water resources development, utilization and protection, engineering geological survey, groundwater resources survey and irrigation area soil survey. Its task is to investigate and study the nature, function and internal laws of natural phenomena in the proposed basin or region, evaluate and predict the possible interactions and various problems between various water conservancy facilities and the natural environment, and provide basic data and scientific basis for optimizing the planning, design, construction and operation of water conservancy projects. River survey is inseparable from the use of survey equipment;
[0003] According to a ditch depth surveying device for land surveying disclosed in Chinese patent with authorization announcement number: CN116878357B, a counterweight part is installed on the scale line during the process of releasing the scale line, thereby increasing the weight of the part of the depth measuring structure submerged in the water, so as to facilitate maintaining the vertical posture of the scale line entering the water, thereby improving the measurement accuracy of the present invention in turbulent water flow. After using the above-mentioned existing ditch depth surveying device for land surveying, it was found that the above-mentioned device needs to use multiple counterweight parts, resulting in a large overall weight of the device and a large volume, which is very inconvenient to carry. In addition, the addition of a large number of counterweight parts will also cause the weight borne by the scale line to increase. Therefore, in order to enable the scale line to withstand the heavier counterweight part, it is necessary to use a higher strength material, resulting in an increase in production cost and procurement cost. Summary of the invention
[0004] To this end, the present invention provides a multifunctional surveying device to solve the above-mentioned problems.
[0005] The present invention provides the following technical solution: a multifunctional surveying device, comprising a chain storage frame, the chain storage frame is arranged in a cavity shape, and the front and rear parts of the chain storage frame are provided with a rotating installation groove, the rotating installation groove is communicated with the cavity of the chain storage frame, a winding frame is rotatably installed inside the rotating installation groove, a delivery component is arranged around the outer periphery of the winding frame, an exploration cone is fixedly installed on the bottom of the delivery component, and a silt collecting component is arranged inside the exploration cone;
[0006] The delivery component includes a delivery chain wound around the periphery of the winding frame, and the delivery chain includes a plurality of first links and a plurality of second links, the first links and the second links are connected in sequence end to end, both ends of the first links are provided with hinge grooves, the second links are movably located inside the hinge grooves, and the opposite surfaces of the hinge grooves are penetrated with hinge shaft holes, and the front and rear parts of the second links are fixedly installed with two hinge shaft rods distributed up and down, the positions of the hinge shaft rods correspond to the positions of the hinge shaft holes one by one, the outer wall of the hinge shaft rod is rotatably connected to the inner wall of the hinge shaft hole, and the inner wall of the hinge shaft hole near the end of the hinge groove is provided with hinge shaft holes. There is a circular groove for making way, and the inner wall of the articulated shaft hole is provided with a plurality of torque limiting grooves distributed at equal angles, and the torque limiting groove is connected with the inside of the circular groove for making way, and two telescopic grooves are provided inside the second chain link, and the position of the telescopic groove corresponds to the position of the articulated shaft rod, and a top pin is slidably installed inside the articulated shaft rod, wherein a first spring is fixedly installed between the front and rear two top pins, and a plurality of strip grooves are provided through the outer wall of the articulated shaft rod, and a plurality of limit blocks are fixedly installed on the outer wall of the top pin, and the limit blocks slide through the inside of the strip grooves, and the exploration cone is fixedly installed at the bottom end of the first chain link located at the bottom.
[0007] As a preferred solution of the present invention, the number and specifications of the limit blocks are matched with the number and specifications of the torque limiting grooves, and the positions of the limit blocks correspond one to one with the positions of the torque limiting grooves.
[0008] As a preferred solution of the present invention, a transfer frame is fixedly installed at the bottom of the chain storage frame, the delivery chain movably passes through the interior of the transfer frame, and the front wall and the rear wall of the transfer frame are both provided with inclined grooves.
[0009] As a preferred solution of the present invention, a threaded hole is formed through the left portion of the transfer frame, and a sensor is fixedly installed inside the threaded hole.
[0010] As a preferred solution of the present invention, the first spring is located inside the telescopic slot, the aperture of the telescopic slot is the same as the inner diameter of the articulated shaft, and the telescopic slot is concentric with the articulated shaft.
[0011] As a preferred solution of the present invention, the silt mining component includes a silt mining suction chamber opened inside the exploration cone, and two silt mining suction holes are opened on the upper part of the outer wall of the exploration cone, the two silt mining suction holes are symmetrically distributed about the center of the exploration cone, and the two silt mining suction holes are connected to the interior of the silt mining suction chamber, and the bottom wall of the silt mining suction chamber is opened with a telescopic hole, and the telescopic hole passes through the interior of the exploration cone, and a push rod is slidably installed on the inner wall of the telescopic hole, and a plurality of connecting rods distributed at equal angles are fixedly installed on the upper part of the outer wall of the push rod, and the peripheries of the plurality of connecting rods are commonly connected with a blocking ring, the outer wall of the blocking ring is in contact with the inner wall of the silt mining suction chamber, and the position of the blocking ring corresponds to the positions of the two silt mining suction holes.
[0012] As a preferred solution of the present invention, a touch ball is fixedly installed at the bottom of the push rod, and a fourth spring is arranged on the outer periphery of the push rod. The fourth spring is fixedly installed between the bottom of the exploration cone and the top of the touch ball.
[0013] As a preferred solution of the present invention, an air suction piston ring is slidably installed on the outer wall of the push rod, and the outer wall of the suction piston ring is slidably connected to the inner wall of the silt extraction and suction chamber, and the outer periphery of the push rod is provided with a second spring, and the second spring is fixedly installed between the bottom of the suction piston ring and the bottom wall of the silt extraction and suction chamber, and the inner wall of the silt extraction and suction chamber is provided with two guide grooves, and the two guide grooves are symmetrically distributed about the center of the silt extraction and suction chamber, and guide blocks are slidably installed inside the two guide grooves, and a top wedge block is fixedly installed on the top of the guide block, and a bottom wedge block is fixedly installed on the bottom of the guide block, and the top of the bottom wedge block abuts against the bottom of the suction piston ring, and two third springs distributed up and down are fixedly installed inside the guide groove, and the third spring is fixedly installed between the guide block and the inner wall of one side of the guide groove, and an electromagnet is fixedly installed on the bottom wall of the silt extraction and suction chamber, and the electromagnet is located on the periphery of the push rod.
[0014] As a preferred solution of the present invention, one end of the ejector pin away from the first spring is chamfered.
[0015] As a preferred solution of the present invention, a plastic shell is installed on the periphery of the chain storage frame and the transfer frame, and a retractable motor is fixedly installed on the inner wall of one side of the plastic shell. The output shaft of the retractable motor is fixedly connected to one end of the central axis of the winding frame.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. In the present invention, the winding frame is driven to rotate by the output shaft of the retracting and discharging motor, and the chain is released, resulting in multiple first chain links and second chain links being continuously released downward from the bottom of the transfer frame, and driving the exploration cone to be released downward together. At the same time, the sensing end of the sensor calculates the downward moving distance of the exploration cone by sensing the number of the first chain links and the second chain links moving downward, so that when the exploration cone finds the bottom, the data collected by the sensor can know the depth of the river channel. The device has a compact structure, is easy to operate and carry, and is helpful for the development of river channel survey work. At the same time, the compact structure can also reduce the cost of production and procurement.
[0018] 2. In the present invention, the front wall and the rear wall of the transfer frame are provided with an inclined groove, so that after the second chain link carries the ejector pin into the inclined groove, the resilience of the first spring in a compressed and force-accumulated state pushes the two ejector pins to move away from each other, and the ejector pin also drives the plurality of limit blocks to move together, so that the plurality of limit blocks in the yielding circular groove move to the interior of the torsion limiting groove, resulting in rotational locking between the articulated shaft rod and the articulated shaft hole, that is, a rotational locking effect is achieved between the corresponding first chain link and the second chain link, and similarly, as the first chain link and the second chain link pass through the front and rear inclined grooves in turn, a rotational locking effect is achieved, that is, the first chain link and the second chain link after passing through the bottom of the transfer frame cannot rotate with each other, so that the plurality of first chain links and the second chain links inserted into the water are connected as a whole, which can prevent the exploration cone from swinging underwater and also prevent a section of the delivery chain located in the water from bending, thereby improving the survey accuracy.
[0019] 3. In the present invention, during the downward movement of the exploration cone, the first thing that contacts the bottom of the river channel is the touch ball. When the bottom of the touch ball contacts the bottom of the river channel, the exploration cone continues to move downward, causing the push rod to slide upward along the inner wall of the telescopic hole, and under the connection of the four connecting rods, the plugging ring is driven to slide upward along the inner wall of the silt collection and suction chamber. The fourth spring is compressed and stored, and the upward movement of the plugging ring causes the two silt collection and suction holes to form a conductive effect with the interior of the silt collection and suction chamber, and the external silt can enter the interior of the silt collection and suction chamber through the two silt collection and suction holes. At the same time, the plugging ring moves upward, and its top contacts the end inclined surfaces of the two top wedge blocks to produce The wedge force acts to push the two top wedge blocks in opposite directions, further driving the two guide blocks to slide along the inner walls of the two guide grooves. The third spring is compressed, and the sliding of the two guide blocks drives the two bottom wedge blocks to slide respectively into the inside of the two guide grooves and move away from the bottom of the suction piston ring, so that the second spring in the stretched state is rebounded, pushing the suction piston ring downward along the inner wall of the silt collection and suction chamber, resulting in negative pressure inside the silt collection and suction chamber. Under the negative pressure inside the silt collection and suction chamber, the time for silt to pass through the two silt collection and suction holes and enter the silt collection and suction chamber can be accelerated, thereby accelerating the efficiency of riverbed silt collection. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the structure of the present invention;
[0021] Figure 2 is a schematic diagram of the cross-sectional structure of the plastic housing in the present invention;
[0022] Figure 3 It is a schematic diagram of the cross-sectional structure of the chain storage frame in the present invention;
[0023] Figure 4 It is a schematic cross-sectional structure diagram of the chain storage frame and the transfer frame in the present invention;
[0024] Figure 5 For the present invention Figure 4 A schematic diagram of the enlarged structure of part A;
[0025] Figure 6 It is a schematic diagram of the cross-sectional structure of the first chain link and the second chain link in the present invention;
[0026] Figure 7 For the present invention Figure 6 A schematic diagram of the enlarged structure of part B;
[0027] Figure 8 It is a schematic diagram of the cross-sectional structure of the exploration cone in the present invention;
[0028] Fig. 9 For the present invention Figure 8 Schematic diagram of the enlarged structure of part C;
[0029] Fig.10 It is a detailed structural diagram of the connecting rod and the blocking ring in the present invention.
[0030] In the figure: 1, chain storage frame; 101, rotating installation groove; 102, winding frame; 103, transfer frame; 104, inclined groove; 105, threaded hole; 106, retracting motor; 201, first chain link; 2010, hinge groove; 2011, hinge shaft hole; 2012, give way circular groove; 2013, torque limiting groove; 202, second chain link; 2020, hinge shaft rod; 2021, telescopic groove; 2022, top pin; 2023, first spring; 2024, strip groove; 2025, limit Block; 2026, chamfer; 3, sensor; 4, exploration cone; 501, silt extraction suction chamber; 502, silt extraction suction hole; 503, telescopic hole; 504, ejector rod; 505, connecting rod; 506, plugging ring; 507, suction piston ring; 508, second spring; 509, guide groove; 5010, guide block; 5011, top wedge block; 5012, bottom wedge block; 5013, third spring; 5014, electromagnet; 5015, touch ball; 5016, fourth spring; 6, plastic shell. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] See also Figure 1-10 The technical solution provided by the present invention specifically includes the following embodiments:
[0033] Embodiment 1:
[0034] A multifunctional surveying device includes a chain storage frame 1, the chain storage frame 1 is arranged in a cavity shape, and a rotating installation groove 101 is provided at the front and rear of the chain storage frame 1, the rotating installation groove 101 is communicated with the cavity of the chain storage frame 1, a winding frame 102 is rotatably installed inside the rotating installation groove 101, a delivery component is arranged around the outer periphery of the winding frame 102, and an exploration cone 4 is fixedly installed at the bottom of the delivery component;
[0035] The delivery component includes a delivery chain wound around the outer periphery of the winding frame 102, and the delivery chain includes a plurality of first chain links 201 and a plurality of second chain links 202, the first chain links 201 and the second chain links 202 are connected end to end in sequence, both ends of the first chain link 201 are provided with hinge grooves 2010, the second chain link 202 is movably located inside the hinge groove 2010, and the opposite surfaces of the hinge groove 2010 are penetrated with hinge shaft holes 2011, and the front and rear parts of the second chain link 202 are fixedly installed with two hinge shaft rods 2020 distributed up and down, the positions of the hinge shaft rods 2020 correspond to the positions of the hinge shaft holes 2011 one by one, and the outer wall of the hinge shaft rod 2020 is rotatably connected to the inner wall of the hinge shaft hole 2011, and a transfer frame 103 is fixedly installed at the bottom of the chain storage frame 1, and the delivery chain movably passes through the interior of the transfer frame 103;
[0036] A threaded hole 105 is formed through the left part of the transfer frame 103, a sensor 3 is fixedly installed inside the threaded hole 105, a plastic shell 6 is installed on the periphery of the chain storage frame 1 and the transfer frame 103, a retractable motor 106 is fixedly installed on the inner wall of one side of the plastic shell 6, and the output shaft of the retractable motor 106 is fixedly connected to one end of the central axis of the winding frame 102;
[0037] Specifically, in this embodiment, the surveyor holds the handle of the plastic shell 6 and places the device on the surface of the water area to be surveyed. The device is powered by an external power supply, and the power harness plug of the device is inserted into the power socket, and the circuit is turned on. Then, the surveyor starts the retractable discharge motor 106, and drives the central axis of the reel-up rack 102 to rotate through the output shaft of the retractable discharge motor 106, thereby driving the reel-up rack 102 to rotate along the inside of the rotating installation groove 101, and unwinding the delivery chain wound inside the reel-up rack 102, resulting in a plurality of first chain links 20 1 and the second chain link 202 are continuously released downward from the bottom of the transfer frame 103, and drive the exploration cone 4 to be released downward together. At the same time, the sensing end of the sensor 3 calculates the downward moving distance of the exploration cone 4 by sensing the amount of downward movement of the first chain link 201 and the second chain link 202. Therefore, after the exploration cone 4 explores the bottom, the data collected by the sensor 3 can be used to know the depth of the river channel. The device has a compact structure, is easy to operate and carry, and is helpful for the development of river channel survey work. At the same time, the compact structure can also reduce the cost of production and procurement.
[0038] Embodiment 2:
[0039] The inner wall of the hinge shaft hole 2011 is provided with a circular groove 2012 at one end near the hinge groove 2010, and the inner wall of the hinge shaft hole 2011 is provided with a plurality of torque limiting grooves 2013 distributed at equal angles, and the torque limiting grooves 2013 are connected to the inside of the circular groove 2012. Two telescopic grooves 2021 are provided inside the second link 202, and the position of the telescopic groove 2021 corresponds to the position of the hinge shaft rod 2020. A top pin 2022 is slidably installed inside the hinge shaft rod 2020, wherein the front and rear two top pins A first spring 2023 is fixedly installed between the hinge shaft 2020 and the hinge shaft 2022, a plurality of strip grooves 2024 are formed through the outer wall of the hinge shaft 2020, a plurality of limit blocks 2025 are fixedly installed on the outer wall of the top pin 2022, the limit blocks 2025 slide through the inside of the strip grooves 2024, the exploration cone 4 is fixedly installed at the bottom end of a first chain link 201 at the bottom, the number and specifications of the limit blocks 2025 are adapted to the number and specifications of the torque limiting grooves 2013, and the positions of the limit blocks 2025 correspond one to one to the positions of the torque limiting grooves 2013;
[0040] The front wall and the rear wall of the transfer frame 103 are both provided with an oblique groove 104, and the first spring 2023 is located inside the telescopic groove 2021, the aperture of the telescopic groove 2021 is the same as the inner diameter of the hinge shaft 2020, and the telescopic groove 2021 is concentric with the hinge shaft 2020;
[0041] The end of the ejector pin 2022 away from the first spring 2023 is provided with a chamfer 2026;
[0042] Specifically, the output shaft of the retractable motor 106 drives the central axis of the reel-up rack 102 to rotate, thereby driving the reel-up rack 102 to rotate along the inside of the rotating installation slot 101, unwinding the delivery chain wound inside the reel-up rack 102, causing multiple first chain links 201 and second chain links 202 to be continuously released downward from the bottom of the transfer frame 103, and driving the exploration cone 4 to be released downward together. When the first chain link 201 and the second chain link 202 enter the interior of the transfer frame 103 from the interior of the chain storage frame 1, due to the effect of the inclined slot 104 provided on the front and rear walls of the transfer frame 103, the second chain link 202 carries the ejector pin 2022 into the interior of the inclined slot 104, and the rebound force of the first spring 2023 in the compressed and stored state pushes the two ejector pins 2022 to move away from each other, and the ejector pin 2022 also drives multiple limit blocks 202. 5 moves together, so that the multiple limit blocks 2025 in the yielding circular groove 2012 move to the inside of the torsion limiting groove 2013, resulting in rotation locking between the hinge shaft 2020 and the hinge shaft hole 2011, that is, the corresponding first chain link 201 and the second chain link 202 are rotationally locked. Similarly, as the first chain link 201 and the second chain link 202 pass through the front and rear inclined grooves 104 in sequence, the rotation locking effect is achieved. That is, the first chain link 201 and the second chain link 202 cannot rotate with each other after passing through the bottom of the transfer frame 103, so that the multiple first chain links 201 and the second chain links 202 inserted into the water are connected as a whole, which can prevent the exploration cone 4 from swinging underwater and also prevent the bending of a section of the delivery chain located in the water, thereby improving the survey accuracy.
[0043] It should be additionally explained that, when the river depth exploration work is completed, the surveyor starts the retractable discharge motor 106 to reverse, and the output shaft of the retractable discharge motor 106 drives the reel-up frame 102 to rotate in the opposite direction, and reels the plurality of first chain links 201 and the second chain links 202 again, causing the exploration cone 4 to be lifted upward from the river bottom. At the same time, the first chain link 201 and the second chain link 202 move from the bottom of the transfer frame 103 to the inside of the transfer frame 103 in sequence, and the upward movement of the first chain link 201 drives the articulated shaft rod 2020, the top pin 2022 and the first spring 2023 to move together, and since the end of the top pin 2022 is provided with a chamfer 2026, after the articulated shaft rod 2020 moves to the bottom of the transfer frame 103, the chamfer 2026 is provided. Under the action of the wedge force between 2026 and the inner wall of the inclined groove 104, the top pin 2022 is pushed toward the inside of the telescopic groove 2021, thereby driving the multiple limit blocks 2025 fixedly connected to the articulated shaft 2020 to move together, and slide from the inside of the torque limiting groove 2013 into the inside of the circular groove 2012. After the limit blocks 2025 slide from the inside of the torque limiting groove 2013 into the inside of the circular groove 2012, the articulated shaft 2020 and the articulated shaft hole 2011 can rotate freely, that is, the corresponding first chain link 201 and the second chain link 202 can rotate freely, so that the first chain link 201 and the second chain link 202 can be wound around the inside of the winding frame 102, which is convenient for storing longer delivery chains.
[0044] Embodiment three:
[0045] The exploration cone 4 is provided with a silt mining component, which includes a silt mining suction chamber 501 provided inside the exploration cone 4, two silt mining suction holes 502 provided on the upper part of the outer wall of the exploration cone 4, the two silt mining suction holes 502 are symmetrically distributed about the center of the exploration cone 4, and the two silt mining suction holes 502 are both connected to the interior of the silt mining suction chamber 501, a telescopic hole 503 is provided on the bottom wall of the silt mining suction chamber 501, the telescopic hole 503 runs through the interior of the exploration cone 4, a push rod 504 is slidably installed on the inner wall of the telescopic hole 503, a plurality of connecting rods 505 distributed at equal angles are fixedly installed on the upper part of the outer wall of the push rod 504, and a blocking ring 506 is commonly connected to the periphery of the plurality of connecting rods 505, the outer wall of the blocking ring 506 is in contact with the inner wall of the silt mining suction chamber 501, and the position of the blocking ring 506 corresponds to the positions of the two silt mining suction holes 502;
[0046] A touch ball 5015 is fixedly installed at the bottom of the push rod 504, and a fourth spring 5016 is sleeved on the outer periphery of the push rod 504. The fourth spring 5016 is fixedly installed between the bottom of the exploration cone 4 and the top of the touch ball 5015;
[0047] An air suction piston ring 507 is slidably mounted on the outer wall of the ejector rod 504, and the outer wall of the air suction piston ring 507 is slidably connected to the inner wall of the silt extraction and suction chamber 501. A second spring 508 is sleeved on the outer periphery of the ejector rod 504, and the second spring 508 is fixedly mounted between the bottom of the air suction piston ring 507 and the bottom wall of the silt extraction and suction chamber 501. Two guide grooves 509 are provided on the inner wall of the silt extraction and suction chamber 501, and the two guide grooves 509 are symmetrically distributed about the center of the silt extraction and suction chamber 501, and guide blocks 5010 are slidably mounted inside the two guide grooves 509. A top wedge 5011 is fixedly installed on the top of the guide block 5010, a bottom wedge 5012 is fixedly installed on the bottom of the guide block 5010, the top of the bottom wedge 5012 abuts against the bottom of the suction piston ring 507, two third springs 5013 distributed up and down are fixedly installed inside the guide groove 509, the third spring 5013 is fixedly installed between the guide block 5010 and the inner wall of one side of the guide groove 509, and an electromagnet 5014 is fixedly installed on the bottom wall of the silt extraction and suction chamber 501, and the electromagnet 5014 is located on the periphery of the ejector rod 504;
[0048] Specifically, the output shaft of the retracting and discharging motor 106 drives the central axis of the reel-up frame 102 to rotate, thereby driving the reel-up frame 102 to rotate along the inside of the rotating installation groove 101, unwinding the delivery chain wound inside the reel-up frame 102, causing multiple first chain links 201 and second chain links 202 to be continuously released downward from the bottom of the transfer frame 103, and driving the exploration cone 4 to be released downward together. When the exploration cone 4 moves downward, the first thing that contacts the bottom of the river channel is the touch ball 5015. When the bottom of the touch ball 5015 contacts the bottom of the river channel, the exploration cone 4 continues to move downward, causing the push rod 504 to slide upward along the inner wall of the telescopic hole 503, and under the connection of the four connecting rods 505, the blocking ring 506 is driven to slide upward along the inner wall of the silt collection and suction chamber 501. The fourth spring 5016 is compressed and stored, and the blocking ring 506 moves upward, causing the two silt collection and suction holes 502 to form a conductive effect with the inside of the silt collection and suction chamber 501, so that the external silt can be The suction piston ring 507 is pressed against the bottom surface of the suction piston ring 507, and the suction piston ring 507 is pressed against the bottom surface of the suction piston ring 507. ...
[0049] It should be additionally explained that, when the river channel depth exploration and riverbed sludge collection work are completed, the survey personnel start the reversal of the retractable discharge motor 106, and the output shaft of the retractable discharge motor 106 drives the reel-up frame 102 to rotate in the opposite direction, and reels the multiple first chain links 201 and the second chain links 202 again, causing the exploration cone 4 to be lifted upward from the river bottom, carrying the silt collection components and the collected riverbed silt upward together. During this period, the rebound force of the fourth spring 5016 drives the push rod 504, the connecting rod 505 and the blocking ring 506 to reset downward, and the two silt collection suction holes 502 are blocked again to prevent the collected silt from the two silt collection holes 502. The suction hole 502 leaks out. When the exploration cone 4 is lifted to the top dead center, the surveyor pushes the touch ball 5015 upward, and further drives the blocking ring 506 upward through the push rod 504 and the connecting rod 505, so that the two silt collection and suction holes 502 are connected with the inside of the silt collection and suction chamber 501 again. Then the electromagnet 5014 is turned on, and the electromagnet 5014 is energized to generate a magnetic force between the suction piston ring 507, pushing the suction piston ring 507 upward, and the silt inside the silt collection and suction chamber 501 is discharged through the two silt collection and suction holes 502, so that the surveyor can detect the silt on the riverbed.
[0050] In the present scheme, a multifunctional surveying device is used by the surveyor holding the handle of the plastic shell 6, and the device is placed on the surface of the water area to be surveyed. The device is powered by an external power supply, and the power harness plug of the device is inserted into the power socket, and the circuit is turned on. Then, the surveyor starts the retractable discharge motor 106, and drives the central axis of the reel-up frame 102 to rotate through the output shaft of the retractable discharge motor 106, thereby driving the reel-up frame 102 to rotate along the inside of the rotating installation groove 101, and unwinding the delivery chain wound on the reel-up frame 102, causing multiple first chain links 201 and second chain links 202 to be continuously released downward from the bottom of the transfer frame 103, and driving the exploration cone 4 to be released downward together. At the same time, the sensing end of the sensor 3 calculates the downward movement distance of the exploration cone 4 by sensing the number of downward movements of the first chain link 201 and the second chain link 202, so that when the exploration cone 4 reaches the bottom, the data counted by the sensor 3 can know the depth of the river channel;
[0051] When the first link 201 and the second link 202 enter the interior of the transfer frame 103 from the interior of the chain storage frame 1, due to the effect of the inclined groove 104 provided on the front wall and the rear wall of the transfer frame 103, the second link 202 carries the ejector pin 2022 into the interior of the inclined groove 104, and the rebound force of the first spring 2023 in the compressed and stored force state pushes the two ejector pins 2022 to move away from each other, and the ejector pin 2022 also drives the plurality of limit blocks 2025 to move together, so that the plurality of limit blocks 2025 in the yielding circular groove 2012 move to the interior of the torsion limiting groove 2013, resulting in the rotation locking between the articulated shaft 2020 and the articulated shaft hole 2011, that is, the corresponding first link 201 and the second link The first chain link 201 and the second chain link 202 are locked in rotation. Similarly, after the first chain link 201 and the second chain link 202 pass through the front and rear inclined slots 104 in sequence, the first chain link 201 and the second chain link 202 cannot rotate with each other after passing through the bottom of the transfer frame 103, so that the multiple first chain links 201 and the second chain links 202 inserted into the water are connected as a whole, which can prevent the exploration cone 4 from swinging underwater and the bending problem of a section of the delivery chain located in the water, thereby improving the survey accuracy. At the same time, the device has a compact structure, is easy to operate and carry, and is helpful for the survey of the river. At the same time, the compact structure can also reduce the production and procurement costs;
[0052] When the exploration cone 4 moves downward, the first thing that contacts the bottom of the river channel is the touch ball 5015. When the bottom of the touch ball 5015 contacts the bottom of the river channel, the exploration cone 4 continues to move downward, causing the push rod 504 to slide upward along the inner wall of the telescopic hole 503, and under the connection of the four connecting rods 505, the blocking ring 506 is driven to slide upward along the inner wall of the silt collection and suction chamber 501. The fourth spring 5016 is compressed and stores force, and the blocking ring 506 moves upward, causing the two silt collection and suction holes 502 to form a conductive effect with the interior of the silt collection and suction chamber 501, and the external silt can enter the interior of the silt collection and suction chamber 501 through the two silt collection and suction holes 502. At the same time, the blocking ring 506 moves upward, and its top contacts the end inclined surfaces of the two top wedge blocks 5011 to generate a wedge force. The two top wedge blocks 5011 are pushed in opposite directions, further driving the two guide blocks 5010 to slide along the inner walls of the two guide grooves 509, and the third spring 5013 is compressed. The two guide blocks 5010 slide and drive the two bottom wedge blocks 5012 to slide into the inside of the two guide grooves 509 respectively, and move away from the bottom of the suction piston ring 507, so that the second spring 508 in the stretched state is rebounded, and the suction piston ring 507 is pushed downward along the inner wall of the silt collection and suction chamber 501, resulting in negative pressure inside the silt collection and suction chamber 501. Under the negative pressure inside the silt collection and suction chamber 501, the time for the silt to pass through the two silt collection and suction holes 502 and enter the silt collection and suction chamber 501 can be accelerated, thereby accelerating the efficiency of riverbed silt collection;
[0053] When the river channel depth exploration and riverbed silt collection work are completed, the surveyor starts the retracting and discharging motor 106 to reverse, and the output shaft of the retracting and discharging motor 106 drives the reel-up frame 102 to rotate in the opposite direction, and reels the multiple first chain links 201 and the second chain links 202 again, causing the exploration cone 4 to be lifted upward from the river bottom, carrying the silt collection components and the collected riverbed silt upward together. During this period, the rebound force of the fourth spring 5016 drives the push rod 504, the connecting rod 505 and the blocking ring 506 to reset downward, and the two silt collection suction holes 502 are blocked again to prevent the collected silt from the two silt collection holes 502. The suction hole 502 leaks out. At the same time, the first link 201 and the second link 202 move from the bottom of the transfer frame 103 to the inside of the transfer frame 103 in sequence. The first link 201 moves upward to drive the hinge shaft 2020, the top pin 2022 and the first spring 2023 to move together. Since the end of the top pin 2022 is provided with a chamfer 2026, after the hinge shaft 2020 moves to the bottom of the transfer frame 103, the top pin 2022 is pushed toward the inside of the telescopic slot 2021 under the action of the wedge force between the chamfer 2026 and the inner wall of the inclined slot 104, thereby bringing The plurality of limit blocks 2025 fixedly connected to the articulated shaft 2020 move together and slide from the interior of the torque limiting groove 2013 into the interior of the circular groove 2012. After the limit blocks 2025 slide from the interior of the torque limiting groove 2013 into the interior of the circular groove 2012, the articulated shaft 2020 and the articulated shaft hole 2011 can rotate freely, that is, the corresponding first chain link 201 and the second chain link 202 can rotate freely, so that the first chain link 201 and the second chain link 202 can be wound inside the winding frame 102, which is convenient for storing the longer delivery chain. When the exploration cone 4 is lifted to the top dead center, the surveyor pushes the touch ball 5015 upward, and further drives the blocking ring 506 to move upward through the push rod 504 and the connecting rod 505, so that the two silt extraction and suction holes 502 are connected with the inside of the silt extraction and suction chamber 501 again, and then the electromagnet 5014 is turned on. The electromagnet 5014 is energized to generate a magnetic force between the suction piston ring 507, pushing the suction piston ring 507 upward, and the silt inside the silt extraction and suction chamber 501 is discharged through the two silt extraction and suction holes 502, so that the surveyor can detect the silt on the riverbed.
[0054] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A multifunctional surveying device, Features: The invention comprises a chain storage frame (1), the chain storage frame (1) is arranged in a cavity shape, and the front and rear parts of the chain storage frame (1) are both provided with a rotation installation groove (101), the rotation installation groove (101) is communicated with the cavity of the chain storage frame (1), a winding frame (102) is rotatably installed inside the rotation installation groove (101), a delivery component is arranged around the outer periphery of the winding frame (102), an exploration cone (4) is fixedly installed at the bottom of the delivery component, and a silt collecting component is arranged inside the exploration cone (4); The delivery component comprises a delivery chain wound around the outer periphery of the winding frame (102), the delivery chain comprising a plurality of first chain links (201) and a plurality of second chain links (202), the first chain links (201) and the second chain links (202) being connected end to end in sequence, both ends of the first chain links (201) are provided with hinge grooves (2010), the second chain links (202) are movably located inside the hinge grooves (2010), and the opposite surfaces of the hinge grooves (2010) are A hinge shaft hole (2011) is provided through the second chain link (202), and two hinge shaft rods (2020) are fixedly installed at the front and rear of the second chain link (202), and the positions of the hinge shaft rods (2020) correspond to the positions of the hinge shaft holes (2011) one by one. The outer wall of the hinge shaft rod (2020) is rotatably connected to the inner wall of the hinge shaft hole (2011), and a circular groove (2020) is provided at one end of the inner wall of the hinge shaft hole (2011) close to the hinge groove (2010). 12), the inner wall of the hinge shaft hole (2011) is provided with a plurality of torque limiting grooves (2013) distributed at equal angles, the torque limiting grooves (2013) are connected to the inside of the circular groove (2012), the inside of the second chain link (202) is provided with two telescopic grooves (221), the position of the telescopic grooves (221) corresponds to the position of the hinge shaft rod (2020), and the inside of the hinge shaft rod (2020) is slidably installed with a top pin (222) ), wherein a first spring (2023) is fixedly installed between the two front and rear push pins (2022), a plurality of strip grooves (2024) are penetrated through the outer wall of the hinge shaft (2020), a plurality of limit blocks (2025) are fixedly installed on the outer wall of the push pin (2022), the limit blocks (2025) slide through the inside of the strip grooves (2024), and the exploration cone (4) is fixedly installed at the bottom end of the first chain link (201) located at the bottom.
2. A multifunctional surveying device according to claim 1, Features: The number and specifications of the limit blocks (2025) are compatible with the number and specifications of the torque limiting grooves (2013), and the positions of the limit blocks (2025) correspond one-to-one to the positions of the torque limiting grooves (2013).
3. A multifunctional surveying device according to claim 2, Features: A transfer frame (103) is fixedly mounted on the bottom of the chain storage frame (1), the delivery chain movably passes through the interior of the transfer frame (103), and the front wall and the rear wall of the transfer frame (103) are both provided with inclined grooves (104).
4. A multifunctional surveying device according to claim 3, Features: A threaded hole (105) is provided through the left portion of the transfer frame (103), and a sensor (3) is fixedly installed inside the threaded hole (105).
5. A multifunctional surveying device according to claim 4, Features: The first spring (2023) is located inside the telescopic slot (2021), the aperture of the telescopic slot (2021) is the same as the inner diameter of the articulated shaft (2020), and the telescopic slot (2021) is concentric with the articulated shaft (2020).
6. A multifunctional surveying device according to claim 5, Features: The silt extraction component comprises a silt extraction suction chamber (501) provided inside the exploration cone (4); two silt extraction suction holes (502) are provided on the upper portion of the outer wall of the exploration cone (4); the two silt extraction suction holes (502) are symmetrically distributed about the center of the exploration cone (4); and the two silt extraction suction holes (502) are both connected to the interior of the silt extraction suction chamber (501); a telescopic hole (503) is provided on the bottom wall of the silt extraction suction chamber (501); and the telescopic hole (503) penetrates the exploration cone ( 4), a push rod (504) is slidably mounted on the inner wall of the telescopic hole (503), a plurality of connecting rods (505) distributed at equal angles are fixedly mounted on the upper part of the outer wall of the push rod (504), a blocking ring (506) is commonly connected to the periphery of the plurality of connecting rods (505), the outer wall of the blocking ring (506) is in contact with the inner wall of the silt collecting and suction cavity (501), and the position of the blocking ring (506) corresponds to the positions of the two silt collecting and suction holes (502).
7. A multifunctional surveying device according to claim 6, Features: A touch ball (5015) is fixedly mounted on the bottom of the push rod (504), a fourth spring (5016) is sleeved on the periphery of the push rod (504), and the fourth spring (5016) is fixedly mounted between the bottom of the exploration cone (4) and the top of the touch ball (5015).
8. A multifunctional surveying device according to claim 7, Features: An air suction piston ring (507) is slidably mounted on the outer wall of the ejector rod (504), and the outer wall of the air suction piston ring (507) is slidably connected to the inner wall of the silt extraction and suction chamber (501). A second spring (508) is sleeved on the outer periphery of the ejector rod (504), and the second spring (508) is fixedly mounted between the bottom of the air suction piston ring (507) and the bottom wall of the silt extraction and suction chamber (501). Two guide grooves (509) are provided on the inner wall of the silt extraction and suction chamber (501), and the two guide grooves (509) are symmetrically distributed about the center of the silt extraction and suction chamber (501), and guide blocks (5010) are slidably mounted inside the two guide grooves (509). A top wedge block (5011) is fixedly mounted on the top of the guide block (5010), a bottom wedge block (5012) is fixedly mounted on the bottom of the guide block (5010), the top of the bottom wedge block (5012) abuts against the bottom of the suction piston ring (507), two third springs (5013) distributed up and down are fixedly mounted inside the guide groove (509), the third spring (5013) is fixedly mounted between the guide block (5010) and the inner wall of one side of the guide groove (509), and an electromagnet (5014) is fixedly mounted on the bottom wall of the silt extraction and suction chamber (501), and the electromagnet (5014) is located on the periphery of the ejector rod (504).
9. A multifunctional surveying device according to claim 8, Features: The end of the ejector pin (2022) away from the first spring (2023) is provided with a chamfer (2026).
10. A multifunctional surveying device according to claim 9, Features: A plastic shell (6) is installed on the periphery of the chain storage frame (1) and the transfer frame (103), and a retractable motor (106) is fixedly installed on the inner wall of one side of the plastic shell (6), and the output shaft of the retractable motor (106) is fixedly connected to one end of the central shaft of the reeling frame (102).
Citation Information
Patent Citations
A land surveying device for measuring the depth of ditches
CN116878357B
Modular monitoring device for hydrology and water quality
CN109324163A
Low-voltage line loss segmented acquisition measurer
CN110196368A
Hydrogeological multilayer underground water level surveying device and surveying method thereof
CN112857517A
Water level measuring device for water conservancy project
CN211954309U
