Epoxy resin processing equipment and preparation method
By designing multi-layer structure epoxy resin processing equipment, including primary and secondary reactors, conveying devices and crushing devices, the problems of insufficient raw material reaction and poor crushing effect in traditional equipment are solved, and a more efficient ring Oxygen resin processing.
Patent Information
- Application Number
- CN202411292546.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-05
AI Technical Summary
During the epoxy resin processing, it is difficult for traditional reactors to achieve sufficient reaction and cooling and smoothing of raw materials, and the crushing effect is poor, resulting in insufficient reaction and inconvenient processing.
An epoxy resin processing equipment is designed, including first- and second-level reactors, equipped with conveying devices, shaping devices and crushing devices. It adopts a multi-layer structure scraper and auxiliary steel belt machine, and the cold water tank is arranged on the conveying steel. The upper and lower ends of the belt machine can achieve a more complete reaction and better crushing effect through multiple reactions and gradual crushing.
The equipment can effectively scrape and cool the viscous raw materials, ensure sufficient reaction, and achieve better crushing effect through multiple crushing, improving processing efficiency and product quality.
Smart Images

Figure CN118892791A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of epoxy resin processing, and in particular to processing equipment and a preparation method of epoxy resin. Background Art
[0002] Epoxy resin is a high molecular polymer. It is a polycondensation product of epichlorohydrin and bisphenol A or polyol. Due to the chemical activity of the epoxy group, it can be opened with a variety of compounds containing active hydrogen, cured and cross-linked to form a network structure, so it is a thermosetting resin. Bisphenol A type epoxy resin not only has the largest output and the most complete variety, but also new modified varieties are still increasing and the quality is constantly improving. In the processing of epoxy resin, the raw material is viscous after the reaction in the reactor, and the raw material is thick, so it needs to be cooled and scraped thin and flattened, and then the cooled thin raw material is crushed into particles. The traditional reactor only reacts once, which is easy to react insufficiently, and it is not convenient to cool and flatten the thicker raw material, and the effect of crushing the raw material is not good. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide an epoxy resin processing device and preparation method for the above-mentioned technical deficiencies. When used, it is convenient to flatten, cool and shape the relatively viscous raw materials, and the raw materials react more fully and the crushing processing is more convenient.
[0004] The technical solution adopted by the present invention is: to provide epoxy resin processing equipment, including a primary reactor; the discharge end of the primary reactor is connected with a secondary reactor; the discharge end of the secondary reactor is connected with a conveying device; a shaping device is correspondingly arranged at the discharge end of the conveying device; a crushing device is correspondingly arranged at the discharge end of the shaping device; wherein the shaping device comprises a conveying steel belt machine; a scraper is arranged on the conveying steel belt machine, and the scraper and the upper end surface of the conveying steel belt machine are gap-matched; the discharge end of the conveying device is located in the direction of the feeding end of the conveying steel belt machine; an auxiliary steel belt machine is fixedly arranged in the direction of the discharge end of the conveying steel belt machine, and the gap between the auxiliary steel belt machine and the conveying steel belt machine is smaller than the gap between the scraper and the conveying steel belt machine; the scraper is located between the discharge end of the conveying device and the auxiliary steel belt machine; and a cold water tank is arranged in the conveying steel belt machine.
[0005] To further optimize the technical solution, a primary reactor and a secondary reactor of an epoxy resin processing equipment are both provided with a raw material filling port and an auxiliary material port; the auxiliary material port includes an A exhaust pipe, a B feeding port, a C auxiliary material pipe connected to an external vacuum valve, a D auxiliary material pipe connected to an external vent valve, an E auxiliary material pipe connected to an external cold water pipe, and an F auxiliary material pipe connected to an external steam valve.
[0006] To further optimize the technical solution, valves are provided at the discharge ends of the primary reactor and the secondary reactor of an epoxy resin processing equipment; the discharge end of the primary reactor is connected to the secondary reactor; and the discharge end of the secondary reactor is connected to a conveying device.
[0007] To further optimize the technical solution, an epoxy resin processing equipment has two scrapers; the outer sides of the scrapers are slidably sleeved with limit frames; the limit frames are fixedly connected to the conveyor belt machine; both sides of the upper end of the scraper are threadedly connected with adjusting bolts; the adjusting bolts are threadedly connected to the limit frames.
[0008] To further optimize the technical solution, two cold water tanks are provided in an epoxy resin processing equipment; the cold water tanks are respectively provided at the upper and lower ends of the conveyor steel belt machine.
[0009] To further optimize the technical solution, a crushing device of epoxy resin processing equipment includes a crusher and a grinding machine; the crusher is connected to the discharge end of the conveyor steel belt machine; the grinding machine is connected to the discharge end of the crusher.
[0010] To further optimize the technical solution, a discharging end of a crushing device of an epoxy resin processing equipment is connected to a filling machine; and a packaging machine is correspondingly provided at the discharging end of the filling machine.
[0011] To further optimize the technical solution, a conveying device of epoxy resin processing equipment is a conveying pump.
[0012] To further optimize the technical solution, a primary reactor and a secondary reactor of an epoxy resin processing equipment are installed between two floors; the primary reactor is located above the secondary reactor.
[0013] A method for preparing an epoxy resin, characterized in that it comprises the following steps:
[0014] Step 1: Add 1500 parts of bisphenol A into the primary reactor through the raw material filling port, then stir the reactor for 9-11 minutes, then open the vacuum valve connected to the C auxiliary material pipe to evacuate, when the negative pressure is -0.025--0.035MPa, add 750 parts of epichlorohydrin through the B feeding port, then close the valve, open the vent valve connected to the D auxiliary material pipe to slowly break the vacuum state in the primary reactor;
[0015] Step 2: start timing after adding epichlorohydrin, naturally heat up for 38-42 minutes, control the temperature within 79-81°C, and cool it down through the cold water pipe connected to the E auxiliary material pipe when the temperature exceeds 81°; then slowly heat up to 89-91°C, maintain the reaction for 38-42 minutes, and cool it down through the cold water pipe connected to the E auxiliary material pipe when the temperature exceeds 91°; finally control the temperature not to exceed 97°C, and cool it down through the cold water pipe connected to the E auxiliary material pipe when the temperature exceeds 97°; after the reaction is completed, open the raw material filling port on the primary reactor and perform artificial liquid replenishment alkali softening operation, with no more than 10 parts of liquid replenishment each time;
[0016] Step 3: Transfer the softened liquid material in the first reactor to the second reactor for water washing, and wash it with water for 5 times; measure the pH value of the liquid material, and when the pH is 7, the water washing is finished, otherwise, continue to wash with water until the pH is 7 and stop washing;
[0017] Step 4: Dehydrate the washed liquid material at normal pressure, close the vent valve connected to the D auxiliary material pipe, start the stirring of the secondary reactor, open the steam valve connected to the F auxiliary material pipe, increase the temperature until no steam in the secondary reactor is discharged from the A exhaust pipe, open the vacuum valve, and start negative pressure dehydration for 38-42 minutes. When the negative pressure is above -0.04MPa, close the vacuum valve, open the vent valve and slowly break the vacuum state in the secondary reactor;
[0018] Step 5: Start the shaping device, check whether it is normal, start the circulating water, and prepare for tableting;
[0019] Step six: The valve under the secondary reactor is opened, and the liquid material is transferred to the conveyor steel belt machine in the shaping device through the conveying device. The cold water tank cools and solidifies the liquid material through the conveyor steel belt machine, and the liquid material is limited and leveled by the scraper. The liquid material reaches the gap formed by the conveyor steel belt machine and the auxiliary steel belt machine, and the cooled liquid material is further squeezed and thinned into sheet material; then the cooled and solidified sheet material reaches the crusher to break the sheet material into block material, and the block material reaches the crusher to be crushed into granular material; the granular material reaches the filler, and the granular material in the filler is finally bagged and packaged by the packaging machine.
[0020] Compared with the traditional epoxy resin processing equipment and preparation method, the present invention has the following beneficial effects:
[0021] 1. There are two scrapers, which are used to limit the viscous raw materials in sections to prevent the raw materials from piling up high and facilitate subsequent processing; the scraper, limit frame and adjusting bolts are used to adjust the distance between the scraper and the conveyor belt machine, which is convenient for adjustment and adaptation, prevents the scraper from deformation, and prolongs the service life of the scraper;
[0022] 2. The cooperation between the auxiliary steel belt machine and the conveyor steel belt machine further squeezes the raw materials. The extrusion force generated by this structure is greater, which further squeezes the raw materials thinner. After extrusion, the raw materials are cooled and more convenient to crush.
[0023] 3. The cold water tank is used to cool down the steel belt conveyor. Two cold water tanks are set up to cool down the steel belt conveyor belts at the upper and lower ends of the steel belt conveyor respectively. The cooling efficiency is higher and it is more convenient for auxiliary processing.
[0024] 4. The setting of the primary reactor and the secondary reactor allows the raw materials to be reacted twice, first through the primary reactor and the secondary reactor, so that the reaction is more complete; the setting of the crusher first breaks the raw materials into blocks, and then passes through the crusher to crush the blocks into particles. The two steps of crushing have a better crushing effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the shaping device of the present invention;
[0027] Figure 3 It is a schematic diagram of the three-dimensional structure of the scraper of the present invention;
[0028] Figure 4 It is a schematic diagram of the local structure of the reactor of the present invention;
[0029] In the figure, 1. primary reactor; 2. secondary reactor; 3. conveying device; 4. shaping device; 5. conveying steel belt conveyor; 6. auxiliary steel belt conveyor; 7. scraper; 8. cold water tank; 9. valve; 10. limit frame; 11. adjusting bolt; 12. breaker; 13. crusher; 14. crushing device; 15. filling machine; 16. packaging machine; 17. raw material filling port; 18. exhaust pipe A; 19. feeding port B; 20. auxiliary material pipe C; 21. auxiliary material pipe D; 22. auxiliary material pipe E; 23. auxiliary material pipe F; 24. auxiliary material port. DETAILED DESCRIPTION
[0030] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0031] like Figure 1-4As shown, an epoxy resin processing equipment comprises a primary reactor 1; the discharge end of the primary reactor 1 is connected to a secondary reactor 2; the discharge end of the secondary reactor 2 is connected to a conveying device 3; a shaping device 4 is provided at the discharge end of the conveying device 3; a crushing device 14 is provided at the discharge end of the shaping device 4; wherein the shaping device 4 comprises a conveying steel belt machine 5; a scraper 7 is provided on the conveying steel belt machine 5, and the scraper 7 is gap-matched with the upper end surface of the conveying steel belt machine 5; the discharge end of the conveying device 3 is located in the direction of the feeding end of the conveying steel belt machine 5; the conveying steel belt machine An auxiliary steel belt conveyor 6 is fixedly arranged in the discharge direction of the conveying device 5, and the gap between the auxiliary steel belt conveyor 6 and the conveying steel belt conveyor 5 is smaller than the gap between the scraper 7 and the conveying steel belt conveyor 5; the scraper 7 is located between the discharge end of the conveying device 3 and the auxiliary steel belt conveyor 6; a cold water tank 8 is arranged in the conveying steel belt conveyor 5; a raw material filling port 17 and an auxiliary material port 24 are arranged on the primary reactor 1 and the secondary reactor 2; the auxiliary material port 24 includes an A exhaust pipe 18, a B feeding port 19, a C auxiliary material pipe 20 connected to an external vacuum valve, a D auxiliary material pipe 21 connected to an external vent valve, and a cold water tank 8 connected to an external cooling water tank 8; Auxiliary material pipe E 22 connected with a water pipe, auxiliary material pipe F 23 connected with an external steam valve; valves 9 are provided at the discharge ends of the primary reactor 1 and the secondary reactor 2; the discharge end of the primary reactor 1 is connected with the secondary reactor 2; the discharge end of the secondary reactor 2 is connected with the conveying device 3; there are two scrapers 7; the outer sides of the scrapers 7 are slidably sleeved with limit frames 10; the limit frames 10 are fixedly connected to the conveyor steel belt machine 5; both sides of the upper end of the scrapers 7 are threadedly connected with adjusting bolts 11; the adjusting bolts 11 are threadedly connected to the limit frames 10; cold water tank There are two devices 8; the cold water tank 8 is respectively arranged at the upper and lower ends of the conveyor steel belt machine 5; the crushing device 14 includes a crusher 12 and a crusher 13; the crusher 12 is connected to the discharge end of the conveyor steel belt machine 5; the crusher 13 is connected to the discharge end of the crusher 12; the discharge end of the crushing device 14 is connected to the filling machine 15; the discharge end of the filling machine 15 is correspondingly provided with a packaging machine 16; the conveying device 3 is a conveying pump; the primary reactor 1 and the secondary reactor 2 are both installed between two floors; the primary reactor 1 is located above the secondary reactor 2;
[0032] The preparation method of epoxy resin comprises the following steps:
[0033] Step 1: 1500 parts of bisphenol A are added into the primary reactor 1 through the raw material filling port 17, and then the reactor is stirred for 9-11 minutes, and then the vacuum valve connected to the C auxiliary material pipe 20 is opened to evacuate, and when the negative pressure is -0.025--0.035MPa, 750 parts of epichlorohydrin are added through the B feeding port 19, and then the valve 9 is closed, and the vent valve connected to the D auxiliary material pipe 21 is opened to slowly break the vacuum state in the primary reactor 1;
[0034] Step 2: start timing after adding epichlorohydrin, naturally heat up for 38-42 minutes, control the temperature within 79-81°C, and cool it down through the cold water pipe connected to the E auxiliary material pipe 22 when the temperature exceeds 81°; then slowly heat up to 89-91°C, maintain the reaction for 38-42 minutes, and cool it down through the cold water pipe connected to the E auxiliary material pipe 22 when the temperature exceeds 91°; finally control the temperature not to exceed 97°C, and cool it down through the cold water pipe connected to the E auxiliary material pipe 22 when the temperature exceeds 97°; after the reaction is completed, open the raw material filling port 17 on the primary reactor 1, and perform artificial liquid replenishment alkali softening operation, and the liquid replenishment alkali shall not exceed 10 parts each time;
[0035] Step 3: The softened liquid material in the first reactor 1 is transported to the second reactor 2 for water washing, and the water washing is performed 5 times; the pH value of the liquid material is measured, and the water washing is completed when the pH value is 7, otherwise the water washing is continued until the pH value is 7 and the water washing is stopped;
[0036] Step 4: Dehydrate the washed liquid material at normal pressure, close the vent valve connected to the D auxiliary material pipe 21, start the stirring of the secondary reactor 2, open the steam valve connected to the F auxiliary material pipe 23, increase the temperature until no steam in the secondary reactor 2 is discharged from the A exhaust pipe 18, open the vacuum valve, and start negative pressure dehydration for 38-42 minutes. When the negative pressure is above -0.04MPa, close the vacuum valve, open the vent valve and slowly break the vacuum state in the secondary reactor 2;
[0037] Step 5: Start the shaping device 4, check whether it is normal, start the circulating water, and prepare for tableting;
[0038] Step 6: The valve 9 under the secondary reactor 2 is opened, and the liquid material is transferred to the conveyor steel belt machine 5 in the shaping device 4 through the conveying device 3. The cold water tank 8 cools and solidifies the liquid material through the conveyor steel belt machine 5, and the liquid material is limited and flattened by the scraper 7. The liquid material reaches the gap formed by the conveyor steel belt machine 5 and the auxiliary steel belt machine 6, and the cooled liquid material is further squeezed and thinned into a sheet material; then the cooled and solidified sheet material reaches the breaker 12 to break the sheet material into block material, and the block material reaches the crusher 13 to be crushed into granular material; the granular material reaches the filler 15, and the granular material in the filler 15 is finally bagged and packaged by the packaging machine 16;
[0039] The cold water tanks 8 are respectively arranged at the upper and lower ends of the conveyor steel belt machine 5, and are used to cool the upper and lower ends of the steel plate conveyor belt; the scraper 7 is used to scrape the material on the conveyor steel belt machine 5, and the auxiliary steel belt machine 6 is used to further press the scraped material; the raw material filling port 17 is used to add the raw material of epoxy resin and to observe and repair the reactor, and the auxiliary material port 24 can be used to add the auxiliary material of epoxy resin; the figure is a schematic diagram of the structural position of the upper end of the primary reactor 1 or the secondary reactor 2;
[0040] The primary reactor 1 and the secondary reactor 2 are set up so that the raw materials first pass through the primary reactor 1 for reaction, and the reacted raw materials reach the secondary reactor 2 for reaction again, so that the reaction is more complete; there are two scrapers 7, and the scraper 7 that contacts the raw materials first is higher than the other scraper 7. The scraper 7 contacts the raw materials first for limiting and leveling, and the other scraper 7 further limits and thins the raw materials, and limits the relatively viscous raw materials in sections to prevent the raw materials from piling up too high. If only one scraper 7 is set up, when the gap between one scraper 7 and the conveyor steel belt machine 5 is small, a large amount of material is easily accumulated at the scraper 7; when the gap between one scraper 7 and the conveyor steel belt machine 5 is large, the raw materials passing through are thicker, which is inconvenient for cooling and solidification, and inconvenient for subsequent processing;
[0041] The two scrapers 7 can be set up by rotating the adjusting bolts 11 threadedly connected on the limit frame 10 to control the scraper 7 to slide on the limit frame 10, thereby controlling the distance between the scraper 7 and the conveyor steel belt machine 5, which is convenient for adjustment and adaptation for use. The limit frame 10 limits the scraper 7 to prevent the scraper 7 from deforming, and the service life of the scraper 7 is longer; and the auxiliary steel belt machine 6 is set up, because the material is almost cooled and solidified when it reaches the auxiliary steel belt machine 6, and the traditional scraper 7 is not easy to scrape flat. At this time, the auxiliary steel belt machine 6 and the conveyor steel belt machine 5 set up further squeeze the raw material. The extrusion force generated by this structure is greater to further squeeze the raw material thinner, and the extruded raw material is also cooled and solidified, which is more convenient for crushing;
[0042] The cold water tank 8 is used to cool the conveyor steel belt machine 5, and two cold water tanks are provided, which are respectively located at the upper and lower ends of the conveyor steel belt machine 5 to cool the steel plate conveyor belts at the upper and lower ends of the conveyor steel belt machine 5, respectively. The cooling efficiency is higher and it is more convenient to use for auxiliary processing.
[0043] The control method of the present invention is automatic control through a controller. The control circuit of the controller can be implemented by simple programming by technicians in this field, which is common knowledge in the field. The present invention is mainly used to protect mechanical devices, so the present invention will no longer explain the control method and circuit connection in detail.
[0044] It should be understood that the above specific embodiments of the present invention are only used to illustrate or explain the principles of the present invention, and do not constitute a limitation of the present invention. Therefore, any modifications, equivalent substitutions, improvements, etc. made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. In addition, the appended claims of the present invention are intended to cover all changes and modifications that fall within the scope and boundaries of the appended claims, or the equivalent forms of such scope and boundaries.
Claims
1. An epoxy resin processing equipment, characterized in that: The invention comprises a primary reactor (1); the discharge end of the primary reactor (1) is connected to a secondary reactor (2); the discharge end of the secondary reactor (2) is connected to a conveying device (3); a shaping device (4) is provided at the discharge end of the conveying device (3); a crushing device (14) is provided at the discharge end of the shaping device (4); the shaping device (4) comprises a conveying steel belt machine (5); a scraper (7) is provided on the conveying steel belt machine (5), and the scraper (7) and the conveying steel belt are connected to each other. The upper end surface of the conveyor (5) is gap-matched; the discharge end of the conveying device (3) is located in the direction of the feed end of the conveying steel belt conveyor (5); an auxiliary steel belt conveyor (6) is fixedly arranged in the direction of the discharge end of the conveying steel belt conveyor (5), and the gap between the auxiliary steel belt conveyor (6) and the conveying steel belt conveyor (5) is smaller than the gap between the scraper (7) and the conveying steel belt conveyor (5); the scraper (7) is located between the discharge end of the conveying device (3) and the auxiliary steel belt conveyor (6); and a cold water tank (8) is arranged in the conveying steel belt conveyor (5).
2. The epoxy resin processing equipment according to claim 1, characterized in that: The primary reaction kettle (1) and the secondary reaction kettle (2) are both provided with a raw material filling port (17) and an auxiliary material port (24); the auxiliary material port (24) comprises an A exhaust pipe (18), a B feeding port (19), a C auxiliary material pipe (20) connected to an external vacuum valve, a D auxiliary material pipe (21) connected to an external vent valve, an E auxiliary material pipe (22) connected to an external cold water pipe, and an F auxiliary material pipe (23) connected to an external steam valve.
3. The epoxy resin processing equipment according to claim 1, characterized in that: The discharge ends of the primary reactor (1) and the secondary reactor (2) are both provided with valves (9); the discharge end of the primary reactor (1) is connected to the secondary reactor (2); and the discharge end of the secondary reactor (2) is connected to the conveying device (3).
4. The epoxy resin processing equipment according to claim 1, characterized in that: There are two scrapers (7); the outer sides of the scrapers (7) are slidably sleeved with limit frames (10); the limit frames (10) are fixedly connected to the conveyor steel belt machine (5); both sides of the upper ends of the scrapers (7) are threadedly connected with adjustment bolts (11); the adjustment bolts (11) are threadedly connected to the limit frames (10).
5. The epoxy resin processing equipment according to claim 1, characterized in that: There are two cold water troughs (8) provided; the cold water troughs (8) are respectively provided at the upper and lower ends of the conveyor steel belt machine (5).
6. The epoxy resin processing equipment according to claim 1, characterized in that: The crushing device (14) comprises a breaker (12) and a crusher (13); the breaker (12) is connected to the discharge end of the conveyor steel belt machine (5); and the crusher (13) is connected to the discharge end of the breaker (12).
7. The epoxy resin processing equipment according to claim 1, characterized in that: The discharge end of the crushing device (14) is connected to a filling machine (15); and a packaging machine (16) is correspondingly arranged at the discharge end of the filling machine (15).
8. The epoxy resin processing equipment according to claim 1, characterized in that: The conveying device (3) is a conveying pump.
9. The epoxy resin processing equipment according to claim 1, characterized in that: The primary reactor (1) and the secondary reactor (2) are both installed between two floors; the primary reactor (1) is located above the secondary reactor (2).
10. A method for preparing an epoxy resin, characterized in that: The following steps are involved: Step 1: 1500 parts of bisphenol A are added into the primary reactor (1) through the raw material filling port (17), and then the reactor is stirred for 9-11 minutes, and then the vacuum valve connected to the C auxiliary material pipe (20) is opened to evacuate, and when the negative pressure is -0.025-0.035 MPa, 750 parts of epichlorohydrin are added through the B feeding port (19), and then the valve (9) is closed, and the vent valve connected to the D auxiliary material pipe (21) is opened to slowly break the vacuum state in the primary reactor (1); Step 2: start timing after adding epichlorohydrin, naturally heat up for 38-42 minutes, control the temperature within 79-81°C, and cool down through a cold water pipe connected to the E auxiliary material pipe (22) when the temperature exceeds 81°; then slowly heat up to 89-91°C, maintain the reaction for 38-42 minutes, and cool down through a cold water pipe connected to the E auxiliary material pipe (22) when the temperature exceeds 91°; finally control the temperature not to exceed 97°C, and cool down through a cold water pipe connected to the E auxiliary material pipe (22) when the temperature exceeds 97°; after the reaction is completed, open the raw material filling port (17) on the primary reactor (1) and perform artificial alkali replenishment softening operation, with the alkali replenishment not exceeding 10 parts each time; Step 3: The softened liquid material in the first reactor (1) is transferred to the second reactor (2) for water washing, and the water washing is performed 5 times; the pH value of the liquid material is measured, and the water washing is completed when the pH value is 7, otherwise the water washing is continued until the pH value is 7 and the water washing is stopped; Step 4: dehydrating the washed liquid material under normal pressure, closing the vent valve connected to the D auxiliary material pipe (21), starting the stirring of the secondary reactor (2), opening the steam valve connected to the F auxiliary material pipe (23), raising the temperature until no steam in the secondary reactor (2) is discharged from the A exhaust pipe (18), opening the vacuum valve, and starting negative pressure dehydration for 38-42 minutes. When the negative pressure is above -0.04 MPa, closing the vacuum valve, opening the vent valve, and slowly breaking the vacuum state in the secondary reactor (2); Step 5: Start the shaping device (4), check whether it is normal, start the circulating water, and prepare for tableting; Step 6: The valve (9) under the secondary reactor (2) is opened, and the liquid material is transferred to the conveyor steel belt machine (5) in the shaping device (4) through the conveying device (3). The cold water tank (8) cools and solidifies the liquid material through the conveyor steel belt machine (5), and the liquid material is limited and leveled by the scraper (7). The liquid material reaches the gap formed by the conveyor steel belt machine (5) and the auxiliary steel belt machine (6), and the cooled liquid material is further squeezed and thinned to form a sheet material; then the cooled and solidified sheet material reaches the breaker (12) to break the sheet material into block material, and the block material reaches the crusher (13) to be crushed into granular material; the granular material reaches the filler (15), and the granular material in the filler (15) is finally bagged and packaged by the packaging machine (16).