Soft soil stratum deep-buried pile foundation static load test structure and method

By designing the pile foundation to lengthen to the ground and using precast concrete slabs to expand the foundation stress area, the problems of low efficiency and high cost of static load tests of deep buried pile foundations in soft soil strata are solved, and early detection and construction safety are improved.

CN118933094APending Publication Date: 2024-11-12CHINA COMMUNICATIONS CONSTRUCTION (GUANGZHOU) CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411166319.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing technology cannot effectively improve the efficiency of static load tests for deep buried pile foundations of soft soil strata and reduce construction costs. Pile foundation inspection needs to be carried out after excavation of the foundation pit, which is prone to conflict with the foundation pit support system, affecting construction safety and efficiency.

Method used

The designed pile foundation is lengthened to the ground, and static load tests are carried out on the ground. Combined with the precast concrete slab, the foundation is stressed, the loading requirements are reduced, early detection and dynamic construction control are achieved, and the foundation pit closure is avoided.

Benefits of technology

Early pile foundation inspection was realized, construction technology and design parameters were dynamically adjusted, construction costs and risks were reduced, and foundation pit closure delays and soft foundation processing requirements were avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933094A_ABST
    Figure CN118933094A_ABST
Patent Text Reader

Abstract

The invention discloses a soft soil stratum deep-buried pile foundation static load test structure and method. The structure comprises a foundation pit, a design pile foundation is arranged in the foundation pit, the top end of the design pile foundation is fixedly connected with an extension pile foundation, and a pile cap is arranged at the top end of the extension pile foundation; the precast concrete planks are arranged on the ground, the buttresses are arranged on the precast concrete planks, the foundation pit is located between the buttresses, and by the adoption of the static load test structure and method for the deep-buried pile foundation in the soft soil stratum, the test efficiency is improved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of pile foundation static load test, and in particular relates to a static load test structure and method for a deep-buried pile foundation in a soft soil layer. Background Art

[0002] As the foundation of a building, pile foundation is directly related to the quality and safety of the building. Due to the inconsistency of geological conditions, it is necessary to conduct vertical bearing capacity tests on pile foundations in a certain proportion to verify the reliability of pile foundation design and construction. One of the most commonly used methods for pile foundation vertical bearing capacity tests is static load tests.

[0003] For underground structures such as open-cut tunnels, urban underground spaces, basements, and subway stations, the pile foundation is located below the structural floor and is buried at a relatively large depth. Due to process limitations, the pile foundation construction often needs to be completed before the foundation pit is excavated, and the pile foundation inspection work can only begin after the foundation pit is excavated to the bottom and the pile head is exposed.

[0004] This brings up three issues:

[0005] First, when the pile foundation is tested, all pile foundations have been constructed in batches, so the construction process and design parameters cannot be dynamically adjusted according to the test results of the pile foundation. If the pile foundation cannot meet the design requirements due to process or geological reasons, it will inevitably lead to a batch of pile foundations not meeting the design requirements, thus causing immeasurable losses.

[0006] The second is to carry out pile foundation testing after the foundation pit is excavated to the bottom, especially the static load test, because a large amount of pile load is required, which may conflict with the internal support system of the foundation pit, resulting in the static load test cannot be carried out normally.

[0007] Third, according to the general design principles of the foundation pit, after the foundation pit is excavated to the bottom, the pouring construction of the structural bottom plate is required to be completed as soon as possible to achieve the closure of the bottom of the foundation pit and ensure the safety of the foundation pit. However, after the foundation pit is excavated to the bottom, pile foundation testing is still required, especially static load testing, which takes a long time.

[0008] In addition, for soft soil layers, the bearing capacity is poor. When conducting static load tests on pile foundations, especially when using the pile loading method, there are certain requirements for the foundation bearing capacity. In order to meet the bearing capacity requirements, a large amount of soft foundation treatment is often required, which is costly.

[0009] In summary, based on the current technical conditions, there is no economical and efficient testing method to conduct static load tests on deep buried pile foundations in soft soil strata.

[0010] The utility model patent with announcement number CN211057884U was disclosed on July 21, 2020, and its name is a pile foundation vertical compressive static load test device, which includes a test pile, an anchor pile, a main beam, a secondary beam and a loading device. The loading device is installed on the upper surface of the test pile and abuts against the lower surface of the main beam. There are two secondary beams, which are respectively arranged on the upper surface of the two ends of the main beam, and the anchor pile is located below the secondary beam. It is characterized in that: the main beam is a rectangular shell structure, the opening of the main beam faces upward, a counterweight is placed in the main beam, a support frame is arranged below the main beam, the support frame and the test pile are in the same straight line, and a connecting assembly is arranged between the secondary beam and the anchor pile. The pile foundation vertical compressive static load test device has a complex structure and cannot reduce the construction cost. Summary of the invention

[0011] The purpose of the present invention is to provide a static load test structure and method for deep-buried pile foundation in soft soil strata, which can improve test efficiency and reduce construction cost, in view of the deficiencies in the prior art.

[0012] In order to achieve the above object, the technical solution adopted by the present invention is:

[0013] The soft soil stratum deep-buried pile foundation static load test structure comprises a foundation pit, wherein a designed pile foundation is arranged in the foundation pit, an extended pile foundation is fixedly connected to the top of the designed pile foundation, and a pile cap is arranged on the top of the extended pile foundation; a precast concrete slab is arranged on the ground, and piers are arranged on the precast concrete slab, and the foundation pit is located between the piers.

[0014] The pile cap is provided with a first jack, a first reaction beam, a distribution beam and a pre-compression block in sequence, both ends of the distribution beam are arranged on the pier, and the pre-compression blocks are evenly distributed.

[0015] A main beam is provided above the pile cap, a second jack and a second reaction beam are provided on the main beam in sequence, and both ends of the main beam are provided on piers; the pile cap and the second reaction beam are fixedly connected with vertical steel bars, the vertical steel bars penetrate the main beam, and the vertical steel bars are vertically arranged.

[0016] The top of the extended pile foundation is 1m below the ground.

[0017] The first reaction beam is arranged longitudinally, the distribution beam is arranged transversely, the distribution beams are evenly distributed, and the first reaction beam abuts against the middle of the bottom of the distribution beam.

[0018] The precast concrete slab is provided with longitudinal reinforcement, transverse reinforcement and prestressed reinforcement. The longitudinal reinforcement is arranged at the end of the precast concrete slab, the transverse reinforcement is located at one side of the longitudinal reinforcement, and the prestressed reinforcement is located in the middle of the precast concrete slab.

[0019] The size of the precast concrete slab is larger than that of the buttress, and the buttress is arranged in the middle of the precast concrete slab.

[0020] The designed pile foundation and the extended pile foundation are connected with pile foundation steel bars.

[0021] A static load test method for a deep buried pile foundation in a soft soil layer comprises the following steps:

[0022] Step 1: Extend the designed pile foundation to 1m below the ground;

[0023] Step 2: After the pile foundation reaches the age, the pile head and pile body integrity inspection and pile cap construction are carried out;

[0024] Step 3: Consider the influence of the extended pile foundation on the load value of the pile foundation static load test and determine the load value of the pile foundation static load test;

[0025] Step 4: Considering the effect of precast concrete slabs on the expansion of the bearing area of ​​the pier foundation, the bearing capacity of the foundation is reviewed;

[0026] Step 5: Based on the review results, replace the foundation or increase the number of precast concrete slabs and review again;

[0027] Step 6: Conduct on-site static load test.

[0028] The technical effects of the present invention are:

[0029] (1) Extending the deeply buried pile foundation to the ground and conducting a static load test on the ground can start the pile foundation test and inspection work as early as possible to verify whether the construction process and design parameter values ​​are reasonable, and dynamically carry out construction quality control and design to improve the reliability of construction and design, and avoid starting the test and inspection after the pile foundation is fully completed. The pile foundation may not meet the design requirements due to process or geological reasons, resulting in large-scale waste of piles and immeasurable losses.

[0030] (2) It also solves the problem that the static load test at the bottom of the foundation pit cannot be carried out due to the conflict between the pile load and the foundation pit support system. At the same time, it can avoid the situation that the bottom slab concrete construction cannot be carried out in time due to the pile foundation static load test, resulting in the foundation pit not being able to be closed in time, affecting the safety of the foundation pit.

[0031] (3) Adding precast concrete slabs under the piers expands the foundation bearing area, reduces the requirements of the pile load on the bearing capacity of the foundation, avoids the need for soft foundation treatment of the pier foundation in soft soil layers, and greatly reduces the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] This specification includes the following drawings, which show the following contents:

[0033] Figure 1 It is a schematic diagram of a pile foundation compression static load test of a soft soil stratum deep buried pile foundation static load test structure of the present invention;

[0034] Figure 2 It is a schematic diagram of a pile foundation pullout static load test of a soft soil stratum deep buried pile foundation static load test structure of the present invention;

[0035] Figure 3 is a structural cross-sectional view of a precast concrete panel of the present invention;

[0036] Figure 4 It is an operation flow chart of the present invention.

[0037] The markings in the figure are: 1. Design pile foundation; 2. Extend pile foundation; 3. Pile cap; 4. First jack; 5. First reaction beam; 6. Precast concrete slab; 61. Longitudinal reinforcement; 62. Transverse reinforcement; 63. Prestressed tendons; 7. Pier; 8. Distribution beam; 9. Preload block; 10. Second reaction beam; 11. Vertical reinforcement; 12. Main beam; 13. Pile foundation reinforcement; 14. Second jack. DETAILED DESCRIPTION

[0038] The specific implementation methods of the present invention are further explained in detail below by describing the embodiments with reference to the accompanying drawings, with the aim of helping those skilled in the art to have a more complete, accurate and in-depth understanding of the inventive concept and technical solution of the present invention and facilitating their implementation.

[0039] like Figures 1 to 4 As shown, the soft soil stratum deep buried pile foundation static load test structure includes a foundation pit, in which a designed pile foundation 1 is arranged, the top of the designed pile foundation 1 is fixedly connected to an extended pile foundation 2, and the top of the extended pile foundation 2 is provided with a pile cap 3; a precast concrete slab 6 is arranged on the ground, and piers 7 are arranged on the precast concrete slab 6, and the foundation pit is located between the piers 7.

[0040] For the designed pile foundation 1 that needs to be subjected to a static load test, since its pile top elevation is much lower than the existing ground, the designed pile foundation 1 is extended to the ground by extending the pile foundation 2. The concrete strength grade, reinforcement, pile foundation diameter and other specifications of the extended pile foundation 2 are consistent with those of the designed pile foundation 1, and its pile top elevation is 1m lower than the existing ground, which means that the static load test of the pile foundation is carried out on the ground, avoiding the conflict between the pile load and the foundation pit support system. During the subsequent bottom slab concrete construction, the foundation pit is ensured to be closed and the foundation pit is guaranteed to be safe. A precast concrete panel is supported under the pier 7 to expand the foundation stress area, reduce the requirements of the pile load on the foundation bearing capacity, and determine whether the original foundation needs to be replaced based on the actual conditions on site. The preload block 9 and the pier 7 are precast concrete blocks, so they can be precast in advance to reduce the test time.

[0041] like Figure 1As shown, the pile cap 3 is provided with the first jack 4, the first reaction beam 5, the distribution beam 8 and the preload block 9 in sequence. The two ends of the distribution beam 8 are provided on the pier 7, and the preload blocks 9 are evenly distributed. The above structure is used for the static load test of pile foundation compressive strength. The first reaction beam 5 is in contact with the distribution beam 8. Under the gravity of the preload block 9, the preload block 9 provides a reaction force for the first jack 4 to realize the downward movement of the pile foundation. The first jack 4 is used to gradually increase the downward force on the pile foundation, so as to realize the loading of the vertical static load. The evenly distributed preload blocks 9 are used to ensure that the direction of the applied pressure is aligned.

[0042] like Figure 2 As shown, a main beam 12 is arranged above the pile cap 3, and a second jack 14 and a second reaction beam 10 are arranged on the main beam 12 in sequence, and both ends of the main beam 12 are arranged on the pier 7; the pile cap 3 and the second reaction beam 10 are fixedly connected with vertical steel bars 11, and the vertical steel bars 11 penetrate the main beam 12, and the vertical steel bars 11 are arranged vertically. The above structure is used for the static pull-out load test of the pile foundation, and the second jack 14 lifts the second reaction beam 10, and applies a pulling force to the pile foundation through the vertical steel bars 11. The second jack 14 can gradually increase the pulling force on the pile foundation, that is, the loading of the static pull-out load of the pile foundation is realized, and the vertical steel bars 11 are arranged in pairs to ensure the alignment of the overall force direction. The threaded steel bar can also be selected from the fine-rolled threaded steel bar.

[0043] like Figure 1 and Figure 2 As shown, the top of the extended pile foundation 2 is 1m below the ground. After the pile cap 3 is set on the top of the extended pile foundation 2, its elevation is basically flush with the ground, and the pile foundation static load test, which was originally required to be carried out after the foundation pit is excavated to the bottom, is adjusted to the existing ground, that is, the conflict between the pile load and the internal support system of the foundation pit is avoided, ensuring the smooth progress of the test process.

[0044] like Figure 1 and Figure 2 As shown, the first reaction beam 5 is arranged longitudinally, the distribution beam 8 is arranged transversely, the distribution beam 8 is evenly distributed, and the first reaction beam 5 abuts against the middle of the bottom of the distribution beam 8. The first reaction beam 5 and the distribution beam 8 are both steel structures, one first reaction beam 5 is arranged longitudinally, and the distribution beam 8 is arranged transversely and fully laid, and the position of the first reaction beam 5 is in the same straight line as the pile foundation and the pile cap 3, ensuring that the static load direction of the pile foundation is aligned.

[0045] like Figure 3 As shown, longitudinal reinforcement 61, transverse reinforcement 62 and prestressed reinforcement 63 are arranged in the precast concrete slab 6, the longitudinal reinforcement 61 is arranged at the end of the precast concrete slab 6, the transverse reinforcement 62 is located on one side of the longitudinal reinforcement 61, and the prestressed reinforcement 63 is located in the middle of the precast concrete slab 6. The precast concrete slab 6 is a precast structure of prestressed reinforced concrete, and two layers of steel mesh are arranged on the top and bottom surfaces thereof, respectively, and a layer of pre-tensioned prestressed reinforcement is arranged in the middle, which can improve the bending bearing capacity of the precast concrete slab 6.

[0046] like Figure 1 and Figure 2 As shown, the size of the precast concrete slab 6 is larger than that of the buttress 7, and the buttress 7 is arranged in the middle of the precast concrete slab 6. The above structure facilitates the bearing of the buttress 7 by the precast concrete slab 6, improves the uniformity of the force, and at the same time expands the foundation force area, so that the pile foundation static load test on the soft soil layer can be realized.

[0047] like Figure 1 and Figure 2 As shown, the designed pile foundation 1 and the extended pile foundation 2 are connected with pile foundation reinforcement 13. The designed pile foundation 1 and the extended pile foundation 2 are connected into a whole by the pile foundation reinforcement 13 and anchored in the pile cap 3. The construction process is simple and the test efficiency can be improved.

[0048] The static load test method for deep-buried pile foundation in soft soil layer comprises the following steps:

[0049] Step 1: Extend the designed pile foundation 1 to 1m below the ground;

[0050] Step 2: After the pile foundation reaches the age, the pile head and pile body integrity inspection and pile cap 3 construction are carried out;

[0051] Step 3: Considering the influence of the extension pile foundation 2 on the load value of the pile foundation static load test, determine the load value of the pile foundation static load test;

[0052] Step 4: Considering the effect of the precast concrete slab 6 on the expansion of the bearing area of ​​the pier 7 foundation, the bearing capacity of the foundation is reviewed;

[0053] Step 5: According to the review results, the foundation is replaced or the number of precast concrete slabs 6 is increased and reviewed again;

[0054] Step 6: Conduct on-site static load test.

[0055] For the static compressive load test of pile foundation, the loading jack, reaction beam, distribution beam 8 and preload block 9 are arranged on the pile cap 3 in sequence. For the static tensile load test of pile foundation, vertical steel bars 11 or finely rolled threaded steel bars are embedded in the pile cap 3 to connect the pile cap 3 and the reaction beam. The test load of the pile foundation static load is composed of the bearing capacity of the designed pile foundation 1 and the extended pile foundation 2.

[0056] According to the design value of pile foundation bearing capacity and taking into account the bearing capacity of the extended pile, the test load value of the pile foundation static load test is comprehensively determined, and the static load test of the pile foundation is carried out.

[0057] The compressive test load is determined by the following formula:

[0058] F y =Q pk +Q sk1 +Q sk2 Formula 1

[0059]

[0060] Substituting equation 2 into equation 1, we get

[0061] F y ≥2N ky +Q sk2 Formula 3

[0062] where F y -Test loading value of single pile vertical compressive static load; Q pk - ultimate bearing capacity of the soil end at the pile end; Q sk1 - Design the ultimate friction resistance of the soil on the side of pile foundation 1; Q sk2 -The ultimate friction resistance of the soil on the side of the extended pile foundation 2; Q uk - Design the ultimate value of the vertical bearing capacity of a single pile of pile foundation 1; R ay - Characteristic value of vertical bearing capacity of single pile of designed pile foundation 1; N ky -Design the compressive load design value of pile foundation 1 under the standard combination.

[0063] The pull-out test load is determined by the following formula:

[0064] F b =(T uk1 +G p1 )+(T uk2 +G p2 ) Formula 4

[0065] N kb ≤T uk1 / 2+G p1 Formula 5

[0066] Substituting equation 5 into equation 4, we can obtain

[0067] F b ≥(2N kb -G p1 )+(T uk2 +G p2 ) Formula 6

[0068] Where F b - Loading value of single pile vertical tensile static load test; T uk1 - Design the ultimate pull-out bearing capacity of pile foundation 1; T uk2 - The ultimate pull-out bearing capacity of the extended pile foundation 2; G p1 - Design pile foundation 1 deadweight, G p2 - The deadweight of the extended pile foundation 2, the floating bulk density of the pile foundation below the groundwater level. N kb -Design the pull-out load design value of pile foundation 1 under the standard combination.

[0069] According to the above pile foundation test results, combined with the construction technology and geological conditions, construction personnel can dynamically adjust the construction technology and design parameters to make the constructed pile foundation meet the design requirements, thereby ensuring the quality and safety performance of the building.

[0070] The static load test structure and method for deep buried pile foundation in soft soil strata have the following advantages: 1. The deeply buried pile foundation is extended to the ground, and the static load test of the pile foundation is carried out on the ground, so that the test and inspection work of the pile foundation can be started as early as possible to verify whether the construction process and the values ​​of the design parameters are reasonable, and the construction quality control and design can be dynamically carried out to improve the reliability of construction and design, and avoid the pile foundation failing to meet the design requirements due to process or geological reasons when the test and inspection is started after the pile foundation is fully completed, resulting in immeasurable losses caused by large-scale waste of piles.

[0071] 2. It also solves the problem that the static load test at the bottom of the foundation pit cannot be carried out due to the conflict between the pile load and the foundation pit support system. At the same time, it can avoid the inability to carry out the bottom slab concrete construction in time due to the static load test of the pile foundation, resulting in the foundation pit cannot be closed in time, affecting the safety of the foundation pit.

[0072] 3. Adding a precast concrete slab 6 under the pier 7 expands the foundation bearing area, reduces the requirements of the pile load on the foundation bearing capacity, avoids the need for soft foundation treatment of the pier 7 in soft soil layers, and greatly reduces the construction cost.

[0073] The present invention is described above by way of example in conjunction with the accompanying drawings. Obviously, the specific implementation of the present invention is not limited to the above-mentioned methods. As long as various non-substantial improvements are made using the method concept and technical solution of the present invention; or the above concept and technical solution of the present invention are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A static load test structure for deep buried pile foundation in soft soil, characterized by: The invention comprises a foundation pit, wherein a designed pile foundation (1) is arranged in the foundation pit, an extended pile foundation (2) is fixedly connected to the top of the designed pile foundation (1), and a pile cap (3) is arranged at the top of the extended pile foundation (2); a precast concrete slab (6) is arranged on the ground, a buttress (7) is arranged on the precast concrete slab (6), and the foundation pit is located between the buttresses (7).

2. The static load test structure for deep buried pile foundation in soft soil according to claim 1, characterized in that: The pile cap (3) is provided with a first jack (4), a first reaction beam (5), a distribution beam (8) and a pre-compression block (9) in sequence, the two ends of the distribution beam (8) are arranged on the pier (7), and the pre-compression blocks (9) are evenly distributed.

3. The static load test structure for deep pile foundation in soft soil according to claim 1, characterized in that: A main beam (12) is arranged above the pile cap (3), a second jack (14) and a second reaction beam (10) are arranged on the main beam (12) in sequence, and both ends of the main beam (12) are arranged on the pier (7); the pile cap (3) and the second reaction beam (10) are fixedly connected with vertical steel bars (11), the vertical steel bars (11) penetrate the main beam (12), and the vertical steel bars (11) are arranged vertically.

4. The static load test structure for deep-buried pile foundation in soft soil according to any one of claims 1 to 3, characterized in that: The top of the extended pile foundation (2) is 1 m below the ground.

5. The static load test structure for deep-buried pile foundation in soft soil according to claim 2, characterized in that: The first reaction beam (5) is arranged longitudinally, the distribution beam (8) is arranged transversely, the distribution beam (8) is evenly distributed, and the first reaction beam (5) abuts against the middle of the bottom of the distribution beam (8).

6. The static load test structure for deep pile foundation in soft soil according to claim 4, characterized in that: The precast concrete slab (6) is provided with longitudinal steel bars (61), transverse steel bars (62) and prestressed steel bars (63); the longitudinal steel bars (61) are provided at the end of the precast concrete slab (6), the transverse steel bars (62) are located on one side of the longitudinal steel bars (61), and the prestressed steel bars (63) are located in the middle of the precast concrete slab (6).

7. The static load test structure for deep pile foundation in soft soil according to claim 6, characterized in that: The size of the precast concrete slab (6) is larger than the size of the buttress (7), and the buttress (7) is arranged in the middle of the precast concrete slab (6).

8. The static load test structure for deep pile foundation in soft soil according to claim 1, characterized in that: The designed pile foundation (1) and the extended pile foundation (2) are connected with pile foundation steel bars (13).

9. A static load test method for deep buried pile foundation in soft soil, characterized in that: The following steps are involved: Step 1: Extend the designed pile foundation (1) to 1m below the ground; Step 2: After the pile foundation reaches the age, the pile head and pile body integrity inspection and pile cap (3) construction are carried out; Step 3: Considering the influence of the extension pile foundation (2) on the load value of the pile foundation static load test, determine the load value of the pile foundation static load test; Step 4: Considering the effect of the precast concrete slab (6) on the expansion of the bearing area of ​​the pier (7), the bearing capacity of the foundation is rechecked; Step 5: Based on the review results, replace the foundation or increase the number of precast concrete slabs (6) and review again; Step 6: Conduct on-site static load test.