Construction method based on rock burst tunnel anchoring system and anchor net mechanism
By using prestressed anchor rods and steel fiber concrete in the rock burst tunnel anchoring system, mechanized construction is achieved using anchor mesh mechanism, which solves the problems of long and high risk in the existing technology, and achieves rapid support of surrounding rocks Improve the stability of the protection and tunnel structure.
Patent Information
- Application Number
- CN202411300981.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-18
- Publication Date
- 2024-11-15
AI Technical Summary
The construction process of existing rock burst tunnel anchoring systems is time-consuming, low-efficiency and high-risk, especially in the arc structure of the tunnel, which requires manual assistance, resulting in limited construction efficiency and safety.
Using construction methods and anchoring mechanisms based on rock burst tunnel anchoring system, the surrounding rock is enclosed by initial spraying concrete, preset prestressed anchors and high-strength energy-absorbing anchors, combined with steel fiber concrete, the traditional anchoring protection system is dynamically optimized to achieve Mechanized, less-humanized and intelligent construction. The specific steps include preliminary construction preparation, equipment hole entry, flexible protective net installation and anchor rod installation, and the anchor net mechanism to achieve wall installation of flexible protective net and prestressed reinforcement of anchor rods.
The construction time of rock burst is shortened, rapid support for surrounding rocks is achieved, the risk of rock burst is reduced, construction efficiency and safety is improved, and the stability and durability of the tunnel structure are improved through the integrated protection system of anchor networks.
Smart Images

Figure CN118959030A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of anchoring system construction, and in particular to a construction method and an anchor net mechanism based on a rock burst tunnel anchoring system. Background Art
[0002] The large amount of energy contained in the rock mass is the internal cause of rock burst. Pre-emptive stress release of the surrounding rock in front of the tunnel face can effectively reduce the energy of the surrounding rock, thereby avoiding the occurrence of high-intensity rock bursts. At the same time, the implementation of smooth blasting technology can reduce the disturbance of blasting to the surrounding rock, make the excavation contour smooth, reduce the stress concentration on the rock wall surface, and effectively reduce the impact of blasting on the stress distribution of the surrounding rock.
[0003] Excavation unloading is an external cause of rock burst in tunnels. The disturbance effect after stratum excavation is essentially reflected in the rebalancing of the surrounding rock stress field. Therefore, how to reduce the construction time as much as possible and provide rapid support is an important means to reduce the risk of rock burst in tunnels. According to different geological conditions and stress environments, the "unloading-transfer-solidification" stress environment transformation method and the ground stress transfer mechanism of different unloading methods are studied. Instant rock burst advance control technology and delayed rock burst surrounding rock reinforcement technology are developed to form a comprehensive rock burst prevention and control technology.
[0004] The rockburst tunnel anchoring system is an engineering technical measure designed to target rockburst phenomena, aiming to improve the stability of the tunnel surrounding rock and prevent or mitigate the damage caused by rockburst. Rockburst refers to the sudden release of elastic strain energy accumulated in the surrounding rock after tunnel excavation under high stress conditions, resulting in explosive rupture and ejection of rock, posing a serious threat to tunnel construction safety.
[0005] At present, the flexible protection net system is mainly adopted for tunnel protection in rock burst areas. The system mainly includes support ropes, wire rope nets, suture ropes and flexible fixing rings. The support ropes are crossed to form a square grid. The wire rope net is superimposed on the grid-shaped support ropes and fixed together by suture ropes. The suture ropes are pre-tightened with a rope tightener, and finally the flexible protection net is laid on the tunnel surface through a flexible fixing ring combined with an anchor rod.
[0006] Domestic and foreign research has shown that the flexible protection net system has certain effects in rock burst prevention and control. However, due to the unique curved structure characteristics of the tunnel, the installation of the flexible protection net system still requires manual construction with scaffolding assistance. Manual laying makes the construction process of the flexible protection net system time-consuming, ineffective and risky.
[0007] To this end, the present application specifically proposes a construction method and an anchor net mechanism based on a rockburst tunnel anchoring system to solve the above technical problems. Summary of the invention
[0008] The main purpose of the present invention is to provide a construction method and anchor net mechanism based on the rock burst tunnel anchor system, based on the rock burst tunnel anchor net integrated protection system (based on flexible net, prestressed anchor rods and steel fiber concrete), dynamically optimize the traditional anchor protection system construction process, and realize the mechanized, less-manned and intelligent construction of the anchor net integrated protection system to solve the above-mentioned technical problems.
[0009] The present invention adopts the following technical solutions to solve the above technical problems:
[0010] A construction method based on a rockburst tunnel anchoring system comprises the following specific steps:
[0011] S1. Preliminary construction preparation: Use initial sprayed concrete to seal the surrounding rock in time, provide a relatively flat paving surface for the flexible protective net, select preset prestressed anchor rods, high-strength energy-absorbing anchor nets and designated cement to enter the site in turn, and cement is used for anchor rod grouting;
[0012] S2. Equipment entering the hole: The integrated anchor trolley equipped with an anchor bar warehouse and anchor net mechanism enters the site until it reaches the working area, and the anchor bar and anchor net are placed inside. After the anchor trolley moves to the working surface and is in place, the legs are supported to stabilize, and the working arm and anchor net mechanism are swung to the designated position. At the same time, water and electricity are connected, and grouting cement is mixed, and the slurry is mixed according to the preset water-cement ratio;
[0013] S3. Installation of high-strength and high-toughness flexible protective net: The flexible protective net is installed against the wall through the net laying mechanism;
[0014] S4. Anchor bolting: According to the preset anchor bolt position, the working arm is moved to drive the tunnel vault, arch waist and side wall in sequence from the middle of the anchor network node. After the drilling is completed, the anchor bolt magazine is rotated to push the anchor bolt into the hole. The fastener in the mechanical arm locks the anchor bolt to apply prestress and grouting.
[0015] Preferably, the following pre-operations need to be performed before the anchor bolts are brought into the site in step S1:
[0016] S111. Pre-install the expansion head, pad, ball pad and nut on the anchor rod in sequence;
[0017] S112. Tie and secure the pad, ball washer and nut.
[0018] Preferably, in step S1, the anchor net adopts the following specific operations on the net laying mechanism:
[0019] S121. Put the tube-shaped flexible net on the two outermost support arms of the robot arm in advance outside the hole;
[0020] S122. Place the other arms of the robot arm close to the inner side of the open surface of the flexible protective net.
[0021] Preferably, the specific steps of performing the wall-mounting operation of the flexible protective net in step S3 include:
[0022] S31. Using the left and right lowest end support arms to rotate, a certain tension is applied to the flexible protective net, and the flexible protective net laid on the multiple support arms of the anchor net mechanism is tightened to achieve the support net;
[0023] The lowest support arms on the left and right sides of S32 are elastically tightened, and the other support arms of the anchor net machine are operated to move toward the tunnel surrounding rock. During the process, it is ensured that the anchor net machine maintains tension on the flexible protective net, and then the support arms of the anchor net machine are adjusted to make them close to the inner wall of the surrounding rock.
[0024] An anchor net mechanism, applied to any of the above-mentioned construction methods based on rock burst tunnel anchoring system, comprises a plurality of arm structures and a driving structure for driving the arm structures to open outward, wherein the driving structure is mounted on the operating mechanical arm of the trolley, wherein:
[0025] The support arm structure is composed of two outermost groups of support arms 1 and multiple other support arms 2. The support arm 1 is provided with a rolling structure for rolling up and installing the two ends of the flexible protective net;
[0026] The rolling structure cooperates with a plurality of supporting arms to realize the supporting operation of the flexible protective net.
[0027] Preferably, the winding structure comprises a mounting roller sleeved on the first support arm, a positioning net clamp arranged on the mounting roller for mounting and fixing one end of the flexible protective net, a limiting ring plate arranged on one end of the mounting roller close to the driving structure, a scroll spring sleeved on the first support arm, a mounting ring plate arranged on the first support arm and a rotating driving member for driving the mounting ring plate to rotate, and the two ends of the scroll spring are respectively connected to the limiting ring plate and the mounting ring plate;
[0028] The rotating driving member drives the mounting ring plate to drive the support arm to rotate, and the limiting ring plate drives the flexible protection net to be rolled up and tightened through the mounting roller.
[0029] Preferably, the first support arm and the second support arm are both provided with a limit block at one end away from the driving structure, wherein:
[0030] The limit block installed on the support arm 1 is used to cooperate with the scroll spring limit installation roller to be sleeved and rotated on the support arm 1;
[0031] A limit block is installed on the second support arm to prevent the flexible protective net from falling off the second support arm during the net supporting process.
[0032] Preferably, the first support arm is provided with a first mounting support at one end close to the driving structure, and the second support arm is provided with a second mounting support at one end close to the driving structure;
[0033] The driving structure comprises a connecting frame body installed at the end of the working mechanical arm, and a plurality of groups of folding mechanical arms are arranged on the connecting frame body for controlling the opening of the mounting support.
[0034] Preferably, the driving structure further comprises an electrically controlled telescopic rod disposed at the end of the connecting frame, wherein the electrically controlled telescopic rod is connected to a mounting support 1 and is used to control the movement and extension of the mounting support 1.
[0035] Preferably, the first support arm and the second support arm are both provided with a mounting support 1 at one end close to the driving structure;
[0036] The driving structure includes an extension robot arm installed at the end of the operating robot arm, and the mounting support 1 is installed on the extension node of the extension robot arm. During the operation of the extension robot arm, the mounting support 1 drives the support arm 1 and the support arm 2 to open and fit the tunnel arch wall.
[0037] The present invention provides a construction method and an anchoring net mechanism based on a rock burst tunnel anchoring system. Compared with the prior art, the present invention has the following beneficial effects:
[0038] 1. The present invention first lays a flexible protection net to immediately protect the exposed surrounding rock, and then reinforces it by anchor grouting, so as to form an effective anchor-net integrated protection system, shorten the rock burst construction time, and realize rapid support for the exposed surrounding rock of rock burst, thereby effectively reducing the risk of rock burst and ensuring construction safety.
[0039] 2. The present invention sets up an anchor net mechanism and uses the lowest support arms on the left and right sides to apply a certain tension force, so as to tighten the flexible steel wire mesh laid on the support arms of the anchor net mechanism to support the net, and make it close to the inner wall of the surrounding rock during the movement of the trolley, thereby achieving a close fit and rapid installation of the flexible protective net and the tunnel surrounding rock, which not only greatly improves the construction efficiency, but also prevents the falling of gravel when rock burst occurs, thereby ensuring the safety of the working surface.
[0040] 3. The present invention dynamically optimizes the traditional anchoring process, combines the application of prestressed anchor rods and steel fiber concrete, and constructs a more stable anchor-net integrated protection system, which can achieve efficient coordinated operation of anchor rod installation and flexible net laying, effectively improving the stability and durability of the tunnel structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The drawings constituting a part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0042] Figure 1 It is a schematic diagram of the overall construction process of the present invention;
[0043] Figure 2It is a plan view schematic diagram of the laying process of the flexible protective net of the present invention;
[0044] Figure 3 It is a structural stereoscopic schematic diagram of the outermost supporting arm of the web laying mechanism of the present invention;
[0045] Figure 4 A three-dimensional schematic diagram of the connection drive structure of the web laying mechanism of the present invention Figure 1 ;
[0046] Figure 5 A three-dimensional schematic diagram of the connection drive structure of the web laying mechanism of the present invention Figure 2 ;
[0047] Figure 6 It is a plan view schematically showing the flexible protective net of the present invention in a laid state.
[0048] In the figure:
[0049] 1-1, support arm one; 1-2, support arm two; 2, limit block; 3, installation roller; 31, positioning net clamp; 4, limit ring plate; 5, scroll spring; 6, installation ring plate; 7, rotating drive member; 8, installation support one; 9, electric control telescopic rod; 10, installation support two; 11, folding mechanical arm; 12, connecting frame; 13, operating mechanical arm; 14, extending mechanical arm. DETAILED DESCRIPTION
[0050] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. In the absence of conflict, the embodiments in this application and the features in the embodiments can be combined with each other. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0051] In the first embodiment, see Figure 1 , Figure 2 and Figure 6 .
[0052] like Figure 1 and Figure 6 As shown, the present invention provides a construction method based on a rockburst tunnel anchoring system, comprising the following specific steps:
[0053] S1. Preliminary construction preparation: Use initial sprayed concrete to seal the surrounding rock in time, provide a relatively flat paving surface for the flexible protective net, select preset prestressed anchor rods, high-strength energy-absorbing anchor nets and designated cement to enter the site in turn, and cement is used for anchor rod grouting, including:
[0054] (1) Preparation and delivery of prestressed anchor rods: Anchor rods should be selected in accordance with the quality requirements of the Technical Specifications for Railway Tunnel Anchor Support 9248-2021 and Prestressed Hollow Anchor Rods TB / T3356-2014. The following pre-operations should be performed before the anchor rods are delivered to the site:
[0055] S111. Pre-install the expansion head, pad, ball pad and nut on the anchor rod in sequence;
[0056] S112. Tie and secure the pad, ball pad and nut;
[0057] S113. Install the integrated anchor bolt bin to the drilling and grouting anchor net outside the cave;
[0058] (2) Preparation and delivery of high-strength energy-absorbing anchor nets. According to the design of the net laying mechanism, the anchor net needs to be rolled for transportation and use. The reel is installed before entering the site. At the same time, the anchor net also adopts the following specific operations on the net laying mechanism:
[0059] S121. Put the tube-shaped flexible net on the two outermost support arms of the robot arm in advance outside the hole;
[0060] S122. Place the other arms of the robot close to the inner side of the open surface of the flexible protective net;
[0061] (3) Specified cement preparation and delivery. Cement used for anchor grouting has higher requirements. Therefore, it is necessary to prepare the corresponding grade of cement according to the engineering design requirements. The storage and protection of cement must be strictly carried out in accordance with the requirements;
[0062] S2. Equipment entering the hole: The integrated anchor trolley equipped with an anchor bar warehouse and anchor net mechanism enters the site until it reaches the working area, and the anchor bar and anchor net are placed inside. After the anchor trolley moves to the working surface and is in place, the legs are supported to stabilize, and the working arm and anchor net mechanism are swung to the designated position. At the same time, water and electricity are connected, and grouting cement is mixed, and the slurry is mixed according to the preset water-cement ratio;
[0063] S3. Installation of high-strength and high-toughness flexible protective net: The flexible protective net is installed against the wall through the net laying mechanism. Figure 2 The specific steps for installing the flexible protective net against the wall include:
[0064] S31. Using the left and right lowest end support arms to rotate, a certain tension is applied to the flexible protective net, and the flexible protective net laid on the multiple support arms of the anchor net mechanism is tightened to achieve the support net;
[0065] The lowest support arms on the left and right sides of S32 are elastically tightened, and the other support arms of the anchor net machine are operated to move toward the tunnel surrounding rock. During the process, ensure that the anchor net machine maintains tension on the flexible protective net, and then adjust the support arms of the anchor net machine to make it close to the inner wall of the surrounding rock;
[0066] S4. Anchor bolting: According to the preset anchor bolt position, the mobile working arm will drive the tunnel vault, arch waist and side wall in sequence from the middle of the anchor net node. After drilling, the anchor bolt magazine will be rotated to push the anchor bolt into the hole. The fastener in the mechanical arm will lock the anchor bolt, tension it and apply prestress and grouting. At this time, by dynamically optimizing the traditional anchoring process and combining the application of prestressed anchor bolts and steel fiber concrete, a more stable anchor net integrated protection system is constructed, which can achieve efficient coordinated operation of anchor bolting and flexible net laying, significantly improve construction efficiency, reduce manpower requirements, effectively improve the stability and durability of the tunnel structure, and finally realize mechanization, less-manpowered and intelligent construction of rock burst tunnels.
[0067] In summary, the present invention can ensure the protection of exposed surrounding rock in advance by first laying the flexible protection net, and then perform anchor grouting to reinforce the flexible net, forming an effective anchor net integrated protection system, and greatly reducing the time of rock burst construction under the exposed surrounding rock of the face, and realizing rapid support for the exposed surrounding rock of rock burst, which can play a role in immediate isolation and protection of the exposed surrounding rock, thereby achieving the effect of reducing the risk of rock burst and ensuring the safety of construction personnel.
[0068] Based on the above embodiment, a second embodiment is proposed. Figure 3 , Figure 4 and Figure 5 , to illustrate the specific anchor net mechanism structure used to execute the steps of the first embodiment described above.
[0069] like Figure 4 and Figure 5 As shown, the present invention provides an anchor net mechanism, which is applied to the construction method based on the rock burst tunnel anchoring system of any one of claims 1 to 4 above, comprising a plurality of support arm structures and a driving structure for driving the support arm structures to open outward, and the driving structure is installed on the operating mechanical arm 13 of the trolley, wherein:
[0070] The support arm structure is composed of two outermost groups of support arms 1-1 and other multiple support arms 2 1-2. The support arm 1-1 is provided with a rolling structure for rolling up and installing the two ends of the flexible protection net;
[0071] The winding structure cooperates with a plurality of support arms 1-2 to realize the support operation of the flexible protective net.
[0072] Therefore, in the specific implementation process, the trolley operating mechanical arm 13 is moved to the operation drive of the support arm structure behind the arch, and the lowest support arms on the left and right sides can be used to apply a certain tensioning force to tighten the flexible steel wire mesh laid on the support arms of the anchor net mechanism to support the net, and make it close to the inner wall of the surrounding rock during the movement of the trolley, thereby achieving a close fit and rapid installation of the flexible protective net and the tunnel surrounding rock, which not only greatly improves the construction efficiency, but also ensures the tension and coverage of the protective net, effectively enhances the support and reinforcement of the surrounding rock, prevents the falling of gravel when rock burst occurs, and ensures the safety of the working surface.
[0073] Among them Figure 3 As shown, the winding structure includes a mounting roller 3 mounted on the support arm 1-1, a positioning net clamp 31 arranged on the mounting roller 3 for mounting and fixing one end of the flexible protective net, a limiting ring plate 4 arranged on the mounting roller 3 near one end of the driving structure, a spiral spring 5 mounted on the support arm 1-1, a mounting ring plate 6 arranged on the support arm 1-1 and a rotating driving member 7 for driving the mounting ring plate 6 to rotate, and the two ends of the spiral spring 5 are respectively connected to the limiting ring plate 4 and the mounting ring plate 6.
[0074] When the rotating driving member 7 drives the mounting ring plate 6 to drive the support arm 1-1 to rotate, the limiting ring plate 4 drives the flexible protection net to be rolled up and tightened through the mounting roller 3. Therefore, the driving structure can be used to cooperate to make the flexible protection net close to the tunnel arch wall.
[0075] It should be noted that the winding structure can be replaced by a structure in the prior art that can achieve the corresponding effect, and the positioning net clamp 31 mentioned above is used to clamp the edge of the flexible protective net.
[0076] In addition, both the first support arm 1-1 and the second support arm 1-2 are provided with a limit block 2 at one end away from the driving structure, wherein the functions of the limit block 2 are different, specifically:
[0077] (1) A limit block 2 is installed on the support arm 1-1 to cooperate with the scroll spring 5 to limit the installation of the roller 3 on the support arm 1-1 for rotation;
[0078] (2) A limit block 2 is installed on the support arm 1-2 to prevent the flexible protective net from falling off the support arm 1-2 during the net supporting process.
[0079] In a specific embodiment, if Figure 4 As shown, a mounting support 8 is provided at one end of the support arm 1-1 close to the driving structure, and a mounting support 10 is provided at one end of the support arm 1-2 close to the driving structure;
[0080] The driving structure includes a connecting frame 12 installed at the end of the working mechanical arm 13, and a plurality of folding mechanical arms 11 are arranged on the connecting frame 12 for controlling the installation support 2 10 to open;
[0081] The driving structure also includes an electrically controlled telescopic rod 9 disposed at the end of the connecting frame 12. The electrically controlled telescopic rod 9 is connected to the mounting support 8 and is used to control the mounting support 8 to move outward.
[0082] Therefore, specifically, by folding the mechanical arm 11 and the electrically controlled operation of the electrically controlled telescopic rod 9, the support arm 1-1 and the support arm 2-1-2 can be driven to open arbitrarily through the mounting support, so that the flexible protective net can fit closely to the tunnel arch wall.
[0083] It should also be noted that the above-mentioned support arm structure, folding mechanical arm 11, and electrically controlled telescopic rod 9 are all prior art, and their specific use principles and installation methods are not described in detail here.
[0084] In another specific embodiment, Figure 5 As shown, both the support arm 1-1 and the support arm 2 1-2 are provided with a mounting support 8 at one end close to the driving structure;
[0085] The driving structure includes an extension robot arm 14 installed at the end of the operating robot arm 13, and a mounting support 8 is installed on the extension node of the extension robot arm 14. During the operation of the extension robot arm 14, the mounting support 8 drives the support arm 1-1 and the support arm 2 1-2 to open and fit the tunnel arch wall.
[0086] Specifically, by adjusting the rotation angles of different sections of the extending mechanical arm 14, the support arm 1-1 and the support arm 2-1-2 can be driven to open arbitrarily through the mounting support, so that the flexible protective net can fit closely to the tunnel arch wall.
[0087] It should also be noted that the above-mentioned extension robot arm 14 is also a prior art, and can be replaced by a structure in the prior art that can play the same role. The specific use principle and installation method thereof will not be described in detail here.
[0088] Finally, it should be noted that the specific structural parts for driving the above-mentioned support arm 1-1 and the support arm 1-2 to open are not unique. In the structural description of the anchor net mechanism, the structure that can open the support arm 1-1 and the support arm 1-2 to any position or specified position can be used as a specific implementation plan of the driving structure.
[0089] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
[0090] In addition, it should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back, etc.), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.
[0091] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the meaning of "and / or" appearing in the full text includes three parallel schemes. Taking "A and / or B" as an example, it includes scheme A, or scheme B, or schemes that A and B meet at the same time. In addition, in the embodiments of the present invention, "multiple" refers to more than two. In addition, the technical solutions between the various embodiments can be combined with each other, but it must be based on the ability of ordinary technicians in the field to implement. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.
Claims
1. A construction method based on a rockburst tunnel anchoring system, It is characterized in that The specific steps include: S1. Preliminary construction preparation: Use initial sprayed concrete to seal the surrounding rock in time, provide a relatively flat paving surface for the flexible protective net, select preset prestressed anchor rods, high-strength energy-absorbing anchor nets and designated cement to enter the site in turn, and cement is used for anchor rod grouting; S2. Equipment entering the hole: The integrated anchor trolley equipped with an anchor bar warehouse and anchor net mechanism enters the site until it reaches the working area, and the anchor bar and anchor net are placed inside. After the anchor trolley moves to the working surface and is in place, the legs are supported to stabilize, and the working arm and anchor net mechanism are swung to the designated position. At the same time, water and electricity are connected, and grouting cement is mixed, and the slurry is mixed according to the preset water-cement ratio; S3. Installation of high-strength and high-toughness flexible protective net: The flexible protective net is installed against the wall through the net laying mechanism; S4. Anchor bolting: According to the preset anchor bolt position, the working arm is moved to drive the tunnel vault, arch waist and side wall in sequence from the middle of the anchor network node. After the drilling is completed, the anchor bolt magazine is rotated to push the anchor bolt into the hole. The fastener in the mechanical arm locks the anchor bolt to apply prestress and grouting.
2. The construction method based on the rockburst tunnel anchoring system according to claim 1, It is characterized in that In step S1, the following pre-operations need to be performed before the anchor bolts enter the site: S111. Pre-install the expansion head, pad, ball pad and nut on the anchor rod in sequence; S112. Tie and secure the pad, ball washer and nut.
3. The construction method based on the rockburst tunnel anchoring system according to claim 1, It is characterized in that In the step S1, the anchor net adopts the following specific operations on the net laying mechanism: S121. Put the tube-shaped flexible net on the two outermost support arms of the robot arm in advance outside the hole; S122. Place the other arms of the robot arm close to the inner side of the open surface of the flexible protective net.
4. The construction method based on the rockburst tunnel anchoring system as claimed in claim 3, It is characterized in that The specific steps of the flexible protective net wall-mounting operation in step S3 include: S31. Using the left and right lowest end support arms to rotate, a certain tension is applied to the flexible protective net, and the flexible protective net laid on the multiple support arms of the anchor net mechanism is tightened to achieve the support net; The lowest support arms on the left and right sides of S32 are elastically tightened, and the other support arms of the anchor net machine are operated to move toward the tunnel surrounding rock. During the process, it is ensured that the anchor net machine maintains tension on the flexible protective net, and then the support arms of the anchor net machine are adjusted to make them close to the inner wall of the surrounding rock.
5. An anchor net mechanism, It is characterized in that The construction method based on the rockburst tunnel anchoring system as described in any one of claims 1 to 4 above comprises a plurality of brace arm structures and a driving structure for driving the brace arm structures to open outwards, wherein the driving structure is mounted on an operating mechanical arm (13) of a trolley, wherein: The support arm structure is composed of two outermost groups of support arms one (1-1) and multiple other support arms two (1-2), and the support arm one (1-1) is provided with a rolling structure for rolling up and installing the two ends of the flexible protection net; The reeling structure cooperates with a plurality of support arms 2 (1-2) to realize the support operation of the flexible protective net.
6. The anchor net mechanism according to claim 5, It is characterized in that The winding structure comprises a mounting roller (3) sleeved on the support arm (1-1), a positioning net clamp (31) arranged on the mounting roller (3) for mounting and fixing one end of the flexible protective net, a limiting ring plate (4) arranged on the mounting roller (3) close to one end of the driving structure, a spiral spring (5) sleeved on the support arm (1-1), a mounting ring plate (6) arranged on the support arm (1-1) and a rotating driving member (7) for driving the mounting ring plate (6) to rotate, wherein the two ends of the spiral spring (5) are respectively connected to the limiting ring plate (4) and the mounting ring plate (6); During the process in which the rotating driving member (7) drives the mounting ring plate (6) to drive the support arm 1 (1-1) to rotate, the limiting ring plate (4) drives the flexible protective net to be rolled up and tightened through the mounting roller (3).
7. The anchor net mechanism according to claim 6, It is characterized in that The first support arm (1-1) and the second support arm (1-2) are both provided with a limit block (2) at one end away from the driving structure, wherein: The limit block (2) is installed on the support arm (1-1) and is used to cooperate with the spiral spring (5) to limit the installation of the roller (3) so that it can be sleeved and rotated on the support arm (1-1); A limit block (2) is installed on the second support arm (1-2) to prevent the flexible protective net from falling off the second support arm (1-2) during the net supporting process.
8. The anchor net mechanism according to claim 7, It is characterized in that The first support arm (1-1) is provided with a mounting support (8) at one end close to the driving structure, and the second support arm (1-2) is provided with a mounting support (10) at one end close to the driving structure; The driving structure comprises a connecting frame (12) installed at the end of an operating mechanical arm (13), and a plurality of groups of folding mechanical arms (11) are arranged on the connecting frame (12) for controlling the opening of the second mounting support (10).
9. The anchor net mechanism according to claim 8, It is characterized in that The driving structure also includes an electrically controlled telescopic rod (9) arranged at the end of the connecting frame (12), and the electrically controlled telescopic rod (9) is connected to the mounting support (8) and is used to control the mounting support (8) to move outward.
10. The anchor net mechanism according to claim 7, It is characterized in that The support arm 1 (1-1) and the support arm 2 (1-2) are both provided with a mounting support 1 (8) at one end close to the driving structure; The driving structure comprises an extension mechanical arm (14) mounted at the end of an operating mechanical arm (13); the mounting support 1 (8) is mounted on an extension node of the extension mechanical arm (14); during the operation of the extension mechanical arm (14), the mounting support 1 (8) drives the support arm 1 (1-1) and the support arm 2 (1-2) to open and fit the tunnel arch wall.
Citation Information
Cited By
Underground engineering anchor net coupling energy absorption supporting system
CN119163443A
Supporting structure for resisting tunnel rockburst and construction method thereof
CN121539306A